![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||
District | Southwest | Type | Marine/Coastal Fuel Storage | ||||
County | Pasco | Status | OPEN | ||||
ID | 8626556 | Latitude | 28° 16' 17.5642 | ||||
Name |
AMERICAN MARINA 4800 EBBTIDE LANE |
Longitude | 82° 44' 9.3759 | ||||
PORT RICHEY, FL 34668 | LL Method | DPHO | |||||
Contact | RONNIE FIGUEROA | LL Status | REVIEWED | ||||
Phone | (727) 326-7694 | Status Date | 08/25/2003 | ||||
Account Owner Information | |||||||
Name | AMERICAN MARINA 2015 ROSE ST SARASOTA, FL 34239 |
Effective Date | 06/13/2011 | ||||
Contact | RONNIE FIGUEROA | ||||||
Phone | (727) 326-7694 | ||||||
Placard # / Date | 698718 - 07/02/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 8000 | Unleaded Gas (B) | 12/01/1998 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 4000 | Unleaded Gas (B) | 12/01/1981 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket | (Y) Unknown | (8) Manually sampled wells | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 1500 | Unleaded Gas (B) | 12/01/1981 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket | (Y) Unknown | (8) Manually sampled wells | |||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
INSURANCE | 04/03/2022 | 04/03/2023 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||
INSURANCE | 04/03/2021 | 04/03/2022 | ACE AMERICAN INSURANCE COMPANY | ||||
INSURANCE | 04/03/2020 | 04/03/2021 | ACE AMERICAN INSURANCE COMPANY | ||||
INSURANCE | 04/03/2019 | 04/03/2020 | ACE AMERICAN INSURANCE COMPANY | ||||
INSURANCE | 04/03/2018 | 04/03/2019 | ACE | ||||
INSURANCE | 04/03/2017 | 04/03/2018 | ACE | ||||
INSURANCE | 04/03/2016 | 04/03/2017 | ACE | ||||
INSURANCE | 04/03/2015 | 04/03/2016 | ACE | ||||
INSURANCE | 04/03/2014 | 04/03/2015 | ACE | ||||
INSURANCE | 04/03/2013 | 04/03/2014 | ACE | ||||
INSURANCE | 04/03/2011 | 04/03/2012 | ACE | ||||
INSURANCE | 04/03/2010 | 04/03/2011 | ACE | ||||
INSURANCE | 04/03/2009 | 04/03/2010 | ACE | ||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
CWOE | 10/17/2005 | 10/17/2005 | CONDOLEON, GEORGE | 0/0 | COMPLIANCE ASSURANCE | ||
RRBD | 10/14/2005 | CONDOLEON, GEORGE | 0/0 | COMPLIANCE ASSURANCE | |||
TCI | 09/22/2005 | 10/03/2005 | MINOR OUT-OF-COMPLIANCE | CONDOLEON, GEORGE | 0/1 | COMPLIANCE ASSURANCE | |
TCI | 08/10/2004 | 08/27/2004 | IN-COMPLIANCE | RODRIGUEZ, IVAN | 0/1 | COMPLIANCE ASSURANCE | |
RRBD | 09/25/2003 | 10/03/2003 | IN-COMPLIANCE | RODRIGUEZ, IVAN | 0/1 | COMPLIANCE ASSURANCE | |
TCI | 09/04/2003 | 09/26/2003 | MINOR OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/1 | COMPLIANCE ASSURANCE | |
TCI | 10/08/2002 | 10/09/2002 | IN-COMPLIANCE | HANSEN, DAVID | 0/1 | COMPLIANCE ASSURANCE | |
TCI | 11/13/2001 | 11/16/2001 | IN-COMPLIANCE | HANSEN | 0/1 | COMPLIANCE ASSURANCE | |
TCI | 08/18/2000 | 08/24/2000 | IN-COMPLIANCE | HARRIS | 0/1 | COMPLIANCE ASSURANCE | |
NCLI | 01/20/2000 | 03/06/2000 | PETERSON | 0/1 | COMPLIANCE ASSURANCE | ||
TCI | 01/05/2000 | 01/21/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | PETERSON | 0/1 | COMPLIANCE ASSURANCE | |
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Enforcement Referral | 02/26/2025 | Accepted | TUCKER_SX_1 | Enforcement | |||
Enforcement Tracking | 02/26/2025 | Closed Without Enforcement | GREEN_SM | Enforcement | |||
Site Inspection | 01/15/2025 | Major Out of Compliance | TUCKER_SX_1 | 0/1 | Routine Compliance | ||
Letter | 01/15/2025 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||
Record Document | 01/13/2025 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||
Electronic Communication | 01/08/2025 | Satisfied | TUCKER_SX_1 | Routine Compliance | |||
Electronic Communication | 01/02/2025 | Satisfied | TUCKER_SX_1 | Routine Compliance | |||
Site Inspection | 03/21/2023 | Major Out of Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||
Letter | 03/21/2023 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||
Document Management | 03/14/2023 | Satisfied | JUARISTIC_GK_1 | Closure | |||
Letter | 03/14/2023 | Satisfied | JUARISTIC_GK_1 | Closure | |||
TCAR | 03/14/2023 | Satisfied | JUARISTIC_GK_1 | Closure | |||
Electronic Communication | 03/01/2023 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||
Record Document | 06/09/2021 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||
Site Inspection | 11/16/2020 | Major Out of Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||
Record Document | 11/16/2020 | Satisfied | JUARISTIC_GK_1 | Closure | |||
Letter | 11/16/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||
Electronic Communication | 11/05/2020 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||
Record Document | 02/13/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||
Enforcement Referral | 02/07/2019 | Accepted | JUARISTIC_GK_1 | Enforcement | |||
Phone Conversation | 02/06/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||
Electronic Communication | 02/04/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||
Electronic Communication | 02/04/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||
Electronic Communication | 01/18/2019 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||
Site Inspection | 11/08/2018 | Major Out of Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||
Letter | 11/08/2018 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||
Electronic Communication | 10/26/2018 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||
Site Inspection | 03/08/2016 | In Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||
Electronic Communication | 03/08/2016 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||
Electronic Communication | 02/26/2016 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||
Electronic Communication | 02/24/2014 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||
Site Inspection | 02/24/2014 | In Compliance | JUARISTIC_GK_1 | 0/1 | Non-Compliance | ||
Site Inspection | 12/31/2013 | Minor Out of Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||
Letter | 12/31/2013 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||
Record Document | 03/20/2013 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||
Site Inspection | 03/07/2013 | Major Out of Compliance | ROGGELIN_EM_1 | 0/1 | Routine Compliance | ||
Letter | 03/07/2013 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||
Electronic Communication | 03/07/2013 | Satisfied | ROGGELIN_EM_1 | Routine Compliance | |||
Record Document | 08/26/2011 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||
Emergency Preparedness Information | 08/22/2011 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||
Letter | 08/22/2011 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||
Site Inspection | 08/22/2011 | Major Out of Compliance | CONDOLEON_GJ_1 | 0/1 | Routine Compliance | ||
Letter | 10/27/2010 | Satisfied | CONDOLEON_GJ_1 | Closure | |||
TCAR | 10/27/2010 | Satisfied | CONDOLEON_GJ_1 | Closure | |||
Site Inspection | 10/26/2010 | In Compliance | CONDOLEON_GJ_1 | 0/1 | Installation | ||
Site Inspection | 10/07/2010 | In Compliance | CONDOLEON_GJ_1 | 0/1 | Closure | ||
Site Inspection | 09/27/2010 | In Compliance | CONDOLEON_GJ_1 | 0/1 | Closure | ||
Site Inspection | 09/27/2010 | In Compliance | CONDOLEON_GJ_1 | 0/1 | Routine Compliance | ||
Record Document | 09/30/2009 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||
Letter | 09/10/2009 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||
Site Inspection | 09/10/2009 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/1 | Routine Compliance | ||
Site Inspection | 08/28/2008 | In Compliance | CONDOLEON_GJ_1 | 0/1 | Routine Compliance | ||
Record Document | 06/09/2008 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||
Site Inspection | 07/25/2007 | In Compliance | CONDOLEON_GJ_1 | 0/1 | Non-Compliance | ||
Site Inspection | 06/12/2006 | In Compliance | CONDOLEON_GJ_1 | 0/3 | Discharge | ||
Letter | 06/12/2006 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||
Site Inspection | 06/12/2006 | Major Out of Compliance | CONDOLEON_GJ_1 | 0/3 | Non-Compliance | ||
Document Management | 06/12/2006 | Satisfied | CONDOLEON_GJ_1 | Discharge | |||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
01/15/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove and properly dispose of water from E0 STP sump and submit proof of compliance documentation (photo documentation and/or waste manifest). | |||
01/15/2025 | 6006 | Minor | 2.5 Placard not displayed (or available upon request). | Display valid registration placard and email copy to this program office. | |||
01/15/2025 | 6002 | Minor | 2.1 Operator Training records not available. | Provide certificates for Class A/ B and C operators for the facility. Owners or operators shall identify and designate for each in-service underground storage tank system facility, including unmanned facilities, at least one named individual for each class of operator – Class A, Class B, and Class. | |||
01/15/2025 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Provide required financial responsibility forms 4/3/23 through present and email documentation to this program office. | |||
01/15/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove PCW and conduct operability test on secondary gauge to ensure it is functioning properly. Submit test results to this program office. | |||
01/15/2025 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Visual inspections shall be conducted at least once a month, but not exceeding 35 days, every component of a storage tank system that contains, transfers, or stores, or is designed to contain, transfer, or store regulated substances and document its true condition. Piping and dispenser sumps that use an electronic release detection method must also be visually inspected every six months and records kept of the visual inspection. If records are unavailable, Provide documentation of monthly visual inspections for the next two consecutive months then every month thereafter. | |||
01/15/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove and properly dispose of PCW from E0 UDC and submit proof of compliance documentation (photo documentation and/or waste manifest). | |||
01/15/2025 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Investigation SHALL INCLUDE integrity testing of the tank to determine tightness. When an incident occurs at a facility, actions shall be taken within 24 hours of discovery to investigate the incident to determine if a discharge has occurred. | |||
01/15/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Treat for corrosion and repair/replace UDC in disrepair, conduct integrity test on UDC, and submit photos and test documentation to this program office. | |||
01/15/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove and properly dispose of PCW from E0 spill bucket primary and submit proof of compliance documentation (photo documentation and/or waste manifest). | |||
01/15/2025 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide testing for overfill protection devices due 6/2/23, 6/2/24 and forward test results to this program office. | |||
01/15/2025 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Piping and dispenser sumps, double wall spill buckets shall be tested every 3 years not to exceed 36 months. Provide DW spill bucket, UDC and STP sump integrity tests due 9/30/24 and submit test records to this program office. | |||
01/15/2025 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide testing for spill bucket secondary gauge due 9/30/23, 9/30/24 and forward test results to this program office. | |||
03/21/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair/replace the electrical conduit in the STP sump. | |||
03/21/2023 | 6008 | Minor | 2.7 For installation, closure, or change in service status, notification not received in a timely manner. | Applied Science & Engineering conducted a Closure Assessment. Violation will be resolved with the issue of the non-compliance letter. | |||
11/16/2020 | 4012 | Minor | 2.3 For an incident, notification not received in a timely manner. | Ensure all future incidents are reported within 72-hours of discovery. Resolved with 7/17/2020 incident investigation/Closure Assessment. | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
09/29/1994 | COMPLETED | 26 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE | ||||
08/04/1992 | COMPLETED | 26 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE | ||||