![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Baker | Status | OPEN | ||||||||
ID | 8626826 | Latitude | 30° 16' 54.6434 | ||||||||
Name |
MACCLENNY DISCOUNT INC 112 W MACCLENNY AVE |
Longitude | 82° 7' 25.7974 | ||||||||
MACCLENNY, FL 32063-2030 | LL Method | DPHO | |||||||||
Contact | MOHSIN VALLIANI | LL Status | REVIEWED | ||||||||
Phone | (904) 480-7706 | Status Date | 06/15/2023 | ||||||||
Account Owner Information | |||||||||||
Name | BANU ENTERPRISES INC 410 NW 28TH STREET OCALA, FL 34475 |
Effective Date | 10/29/2019 | ||||||||
Contact | MOHSIN VALLIANI | ||||||||||
Phone | (904) 480-7706 | ||||||||||
MACCLENNY112@GMAIL.COM | |||||||||||
Placard # / Date | 622089 - 04/01/2022 | ||||||||||
Property Owner Information | |||||||||||
Name | BANU ENTERPRISES INC 410 NW 28TH ST OCALA, FL 34475-9350 |
Effective Date | 10/29/2019 | ||||||||
Contact | MOHSIN VALLIANI | ||||||||||
Phone | (904) 480-7706 | ||||||||||
DJ_VENAD@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 26000 | Unleaded Gas (B) | 10/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Leaded Gas (A) | 08/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 08/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 08/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 06/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 06/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 06/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 4000 | Kerosene (K) | 06/01/1987 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/31/2020 | 10/31/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 10/31/2019 | 10/31/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/29/2016 | 05/29/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 05/29/2015 | 05/29/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 11/25/2011 | 11/25/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/25/2010 | 11/25/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/25/2009 | 11/25/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/08/2008 | 11/08/2009 | ZURICH-AMERICAN | ||||||||
INSURANCE | 05/15/1998 | 12/31/1998 | FPLIPA | ||||||||
INSURANCE | 12/31/1994 | 05/15/1998 | FPLIPA | ||||||||
INSURANCE | 04/30/1990 | 12/31/1994 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 10/13/2005 | 10/17/2005 | IN-COMPLIANCE | MCNEIL | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/08/2005 | 06/08/2005 | MCNEIL | 0/0 | COMPLIANCE ASSURANCE | ||||||
CALL | 02/02/2005 | 02/02/2005 | VELEZ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED CALL FROM GURADIAN FUELING. LINERS ARE NOT PASSING HYDROSTATIC TEST. STILL WORKING ON IT. | |||||||||||
NCLI | 01/28/2005 | 04/13/2005 | VELEZ | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 01/18/2005 | 01/19/2005 | MINOR OUT-OF-COMPLIANCE | VELEZ | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/10/2005 | 01/11/2005 | VELEZ | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LIMITED CLOSURE SUMMARY REPORT RECEIVED | |||||||||||
NCLI | 11/15/2004 | 11/15/2004 | VELEZ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SENT LETTER REGARDING SHEAR VALVES PROPERLY ANCHORED | |||||||||||
TCI | 08/10/2004 | 12/27/2004 | MINOR OUT-OF-COMPLIANCE | VELEZ | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 08/06/2003 | 08/20/2003 | IN-COMPLIANCE | GODWIN | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 09/26/2002 | 10/01/2002 | IN-COMPLIANCE | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 12/21/2001 | 12/26/2001 | IN-COMPLIANCE | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/11/2001 | 02/05/2001 | IN-COMPLIANCE | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/25/1999 | 04/06/1999 | IN-COMPLIANCE | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Tracking | 11/08/2024 | Closed Without Enforcement | JACKSON_SM | Enforcement | |||||||
Letter | 03/26/2024 | Satisfied | JACKSON_SM | Enforcement | |||||||
Enforcement Referral | 08/01/2023 | Accepted | RICHARDS_JE_1 | Enforcement | |||||||
Enforcement Tracking | 08/01/2023 | Closed Without Enforcement | JACKSON_SM | Enforcement | |||||||
Letter | 06/02/2023 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Site Inspection | 06/02/2023 | Major Out of Compliance | BRANCH_BL_1 | 0/1 | Routine Compliance | ||||||
Letter | 05/12/2023 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Enforcement Tracking | 12/20/2022 | Closed Without Enforcement | FARAJIAN_M | Enforcement | |||||||
Enforcement Referral | 08/15/2022 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Enforcement Tracking | 05/09/2022 | Closed Without Enforcement | QUICK_V | Enforcement | |||||||
Letter | 05/09/2022 | Satisfied | QUICK_V | Enforcement | |||||||
Letter | 04/20/2022 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Site Inspection | 04/20/2022 | Major Out of Compliance | GREGORY_HM_1 | 0/1 | Complaint | ||||||
Enforcement Referral | 09/28/2021 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Site Inspection | 05/13/2021 | Major Out of Compliance | MCKINLEY_DN_1 | 0/1 | Routine Compliance | ||||||
Letter | 05/13/2021 | Satisfied | MCKINLEY_DN_1 | Compliance Assistance | |||||||
Enforcement Referral | 09/06/2019 | Accepted | GREGORY_HM_1 | Enforcement | |||||||
Letter | 06/05/2019 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Site Inspection | 06/05/2019 | Major Out of Compliance | GREGORY_HM_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 05/21/2019 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Phone Conversation | 05/21/2019 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Phone Conversation | 05/21/2019 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Phone Conversation | 05/21/2019 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Electronic Communication | 01/27/2017 | Satisfied | RICHARDS_JE_1 | Non-Compliance | |||||||
Site Inspection | 10/17/2016 | Minor Out of Compliance | WESTERMAN_ML_1 | 0/1 | Non-Compliance | ||||||
Electronic Communication | 10/17/2016 | Satisfied | WESTERMAN_ML_1 | Non-Compliance | |||||||
Letter | 09/28/2016 | Satisfied | WESTERMAN_ML_1 | Non-Compliance | |||||||
Site Inspection | 09/09/2016 | Minor Out of Compliance | WESTERMAN_ML_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 09/09/2016 | Satisfied | WESTERMAN_ML_1 | Routine Compliance | |||||||
Electronic Communication | 07/22/2016 | Satisfied | WESTERMAN_ML_1 | Routine Compliance | |||||||
Electronic Communication | 07/06/2016 | Satisfied | WESTERMAN_ML_1 | Routine Compliance | |||||||
Enforcement Tracking | 11/17/2015 | Closed Without Enforcement | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 11/17/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Site Inspection | 06/30/2015 | In Compliance | DEFALCO_L | 0/1 | Enforcement | ||||||
Letter | 06/30/2015 | Satisfied | DOHANEY_T | Enforcement | |||||||
Electronic Communication | 06/30/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Meeting | 06/30/2015 | Satisfied | DEFALCO_L | QA/QC | |||||||
Phone Conversation | 05/29/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 05/29/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 05/29/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Phone Conversation | 03/30/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Phone Conversation | 03/23/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Issue Document | 01/23/2015 | Satisfied | DOHANEY_T | Enforcement | |||||||
Enforcement Referral | 01/22/2015 | Accepted | DEFALCO_L | Enforcement | |||||||
Issue Document | 12/16/2014 | Satisfied | PEREA_AO_1 | Non-Compliance | |||||||
Letter | 12/14/2014 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Letter | 06/19/2014 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Site Inspection | 06/19/2014 | Minor Out of Compliance | KASSEES_RP_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 06/11/2014 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 06/11/2014 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Site Inspection | 08/14/2012 | In Compliance | LUBINSKI_D | 0/1 | Enforcement | ||||||
Enforcement Tracking | 08/14/2012 | Closed Without Enforcement | LUBINSKI_D | Enforcement | |||||||
Issue Document | 05/31/2012 | Satisfied | LUBINSKI_D | Non-Compliance | |||||||
Meeting | 04/24/2012 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Site Inspection | 04/09/2012 | Minor Out of Compliance | LUBINSKI_D | 0/1 | Enforcement | ||||||
Phone Conversation | 03/05/2012 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Emergency Preparedness Information | 12/07/2011 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
Record Document | 11/22/2011 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Enforcement Referral | 11/07/2011 | Accepted | LUBINSKI_D | Enforcement | |||||||
Letter | 10/18/2011 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Site Inspection | 10/18/2011 | Major Out of Compliance | MCNEIL_AP_1 | 0/1 | Routine Compliance | ||||||
Letter | 08/11/2011 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Letter | 05/11/2011 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Site Inspection | 05/11/2011 | Major Out of Compliance | MCNEIL_AP_1 | 0/1 | Routine Compliance | ||||||
Record Document | 01/31/2011 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Enforcement Tracking | 01/31/2011 | Closed Without Enforcement | LUBINSKI_D | Enforcement | |||||||
Record Document | 01/31/2011 | Satisfied | LUBINSKI_D | Enforcement | |||||||
TCAR | 01/26/2011 | Satisfied | LUBINSKI_D | Closure | |||||||
Record Document | 01/26/2011 | Satisfied | LUBINSKI_D | Closure | |||||||
Enforcement Referral | 11/19/2010 | Accepted | LUBINSKI_D | Enforcement | |||||||
TCAR | 08/23/2010 | Satisfied | MCNEIL_AP_1 | Closure | |||||||
Letter | 08/23/2010 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Letter | 08/23/2010 | Satisfied | MCNEIL_AP_1 | Closure | |||||||
Letter | 05/19/2010 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Site Inspection | 05/14/2010 | In Compliance | MCNEIL_AP_1 | 0/1 | Closure | ||||||
Site Inspection | 02/15/2010 | In Compliance | MCNEIL_AP_1 | 0/1 | Closure | ||||||
Letter | 02/03/2010 | Satisfied | MCNEIL_AP_1 | Closure | |||||||
TCAR | 02/03/2010 | Incomplete | MCNEIL_AP_1 | Closure | |||||||
Letter | 01/15/2010 | Major Out of Compliance | MCNEIL_AP_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 01/14/2010 | Major Out of Compliance | MCNEIL_AP_1 | Routine Compliance | |||||||
Record Document | 12/23/2009 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Letter | 12/23/2009 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Record Document | 12/10/2009 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 11/24/2009 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
Letter | 11/23/2009 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Site Inspection | 11/23/2009 | Major Out of Compliance | MCNEIL_AP_1 | 0/1 | Installation | ||||||
Site Inspection | 11/04/2009 | In Compliance | MCNEIL_AP_1 | 0/4 | Closure | ||||||
Enforcement Tracking | 01/06/2009 | Closed With Enforcement | LUBINSKI_D | Enforcement | |||||||
Site Inspection | 12/01/2008 | In Compliance | MCNEIL_AP_1 | 0/4 | Routine Compliance | ||||||
Meeting | 11/17/2008 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Phone Conversation | 09/22/2008 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Record Document | 07/18/2008 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Site Inspection | 06/04/2008 | Major Out of Compliance | LUBINSKI_D | 0/4 | Enforcement | ||||||
Phone Conversation | 05/30/2008 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Enforcement Referral | 05/30/2008 | Accepted | LUBINSKI_D | Enforcement | |||||||
Letter | 03/31/2008 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Enforcement Tracking | 02/25/2008 | Closed Without Enforcement | LUBINSKI_D | Enforcement | |||||||
Site Inspection | 01/04/2008 | Major Out of Compliance | MCNEIL_AP_1 | 0/4 | Non-Compliance | ||||||
Letter | 01/04/2008 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Letter | 11/29/2007 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Site Inspection | 11/29/2007 | Major Out of Compliance | MCNEIL_AP_1 | 0/4 | Routine Compliance | ||||||
Meeting | 08/27/2007 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Letter | 08/27/2007 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Issue Document | 08/01/2007 | Satisfied | LUBINSKI_D | Enforcement | |||||||
Site Inspection | 08/01/2007 | Minor Out of Compliance | LUBINSKI_D | 0/4 | Enforcement | ||||||
Enforcement Referral | 07/23/2007 | Rejected | LUBINSKI_D | Enforcement | |||||||
Enforcement Referral | 07/20/2007 | Accepted | LUBINSKI_D | Enforcement | |||||||
Enforcement Referral Activity - OLD | 05/31/2007 | Terminated | MCNEIL_AP_1 | Enforcement | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
Enforcement Referral Activity - OLD | 04/25/2007 | Terminated | DOHANEY_T | Enforcement | |||||||
Letter | 02/23/2007 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Letter | 02/23/2007 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/16/2007 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
Record Document | 10/23/2006 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Site Inspection | 10/06/2006 | Minor Out of Compliance | MCNEIL_AP_1 | 0/4 | Routine Compliance | ||||||
Letter | 10/06/2006 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/02/2023 | 6074 | Minor | 2.8 Improper maintenance of records. Records requiring to be maintained for 3 years or for the life of the system not kept by facility. Records not provided within 5 business days. | Provide all records related to the storage tank system generated in the last 3 years to EQD for review. | |||||||
06/02/2023 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Provide the EQD with documentation of the release detection methods or combination of methods used at the facility. | |||||||
06/02/2023 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Provide current Financial Responsibility documentation to EQD for review. | |||||||
06/02/2023 | 6006 | Minor | 2.5 Placard not displayed (or available upon request). | Obtain a current tank registration placard and display it in plain view. Submit a photo to EQD of the current placard displayed. | |||||||
06/02/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have the release detection systems tested for operability and provide documentation to EQD for review. | |||||||
06/02/2023 | 6001 | Minor | 2.1 No reasonable access provided. | Provide an authorized facility representative to provide access to the individual storage tank system components. | |||||||
06/02/2023 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Have the primary overfill protection device tested for operability and provide documentation to EQD for review. | |||||||
06/02/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have the STP sumps, Dispenser sumps, and spill buckets tested for integrity and provide documentation to EQD for review. | |||||||
04/20/2022 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Provide the current storage tank liability insurance for 2021-2022 to the inspector for review. | |||||||
05/10/2021 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Overfill devices shall be registered in accordance with subsection 62-761.850(2), F.A.C., and an operability test shall be performed annually at intervals not exceeding 12 months to ensure proper operation. Conduct annual overfill testing and send the results to the EQD inspector to resolve this violation. | |||||||
05/10/2021 | 4059 | SNC-B | 4.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days.) For electronically monitored sumps, visual inspections not conducted every 6 months. This violation may lead to Placard Revocation and Delivery Prohibition. | Visual inspections. At least once a month, but not exceeding 35 days, every component of a storage tank system that contains, transfers, or stores, or is designed to contain, transfer, or store regulated substances that can be inspected visually shall be visually inspected and documented as to its condition pursuant to Rule 62-761.710, F.A.C. Conduct a few months of visual inspections and send a copy to the EQD inspector to resolve this violation. | |||||||
05/10/2021 | 4066 | SNC-B | 4.3 Integral piping release detection requirements not met. | Conduct line leak detector testing and send the results to the EQD inspector to resolve this violation. | |||||||
05/10/2021 | 4068 | Minor | 4.3 Storage tank system has a not repaired component which has or could cause a release or discharge. | Replace the line leak detector in the Regular Sump and send a picture to the EQD inspector to resolve this violation. | |||||||
05/31/2019 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Overfill devices shall be registered in accordance with subsection 62-761.850(2), F.A.C., and an operability test shall be performed annually at intervals not exceeding 12 months to ensure proper operation | |||||||
05/31/2019 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | The integrity of secondary containment systems and interstitial spaces, regardless of the date of installation of the storage tank system or storage tank system component, shall be verified by performing an interstitial or containment integrity test in accordance with manufacturer's specifications or PEI/RP1200-12, 2012 Edition, incorporated by reference in subparagraph 62-761.500(1)(b)5., F.A.C. | |||||||
05/31/2019 | 4081 | Minor | 2.9 Records of current training certificates for designated Class A, B, and C operators shall be maintained for as long as the operators are designated for that facility not kept. | Records of current training certificates for designated Class A, B, and C operators shall be maintained for as long as the operators are designated for that facility. | |||||||
05/31/2019 | 4067 | Minor | 4.2 Release detection devices not tested annually. | Annual operability testing of release detection systems. All release detection devices shall be tested annually at intervals not exceeding 12 months to ensure proper operation. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/01/1989 | ACTIVE | 60 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
02/18/1987 | ACTIVE | 60 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||