DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northwest   Type    Retail Station
 
County Escambia   Status    OPEN
 
ID 8626860   Latitude    30° 32' 1.1544
 
Name CIRCLE K #2704958
2205 W NINE MILE RD
Longitude    87° 18' 48.3264
  PENSACOLA, FL 32534 LL Method    DPHO
 
Contact FRAN FRANCONI   LL Status    REVIEWED
 
Phone (813) 910-6884   Status Date    08/07/2013
 
Account Owner Information
 
Name CIRCLE K STORES INC
25 W CEDAR ST STE M
Pensacola, FL 32502
Effective Date    01/13/2010
 
Contact IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON
 
Phone (850) 454-1070
 
Email ILEWIS@CIRCLEK.COM
  Placard # / Date    697406 - 06/28/2024
Property Owner Information
 
Name CIRCLE K STORES INC
25 W CEDAR ST STE M
Pensacola, FL 32502
Effective Date    01/13/2010
 
Contact IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON
 
Phone (850) 454-1070
 
Email ILEWIS@CIRCLEK.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
5 16000 Unleaded Gas (B) 06/01/2006 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
6 16000 Vehicular Diesel (D) 06/01/2006 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(F) Fiberglass clad steel
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
1 6000 Unleaded Gas (B) 07/01/1982 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(T) Annual tightness test/Inventory
 
 
Tank Tank Size Content Installed Placement Status
2 6000 Vehicular Diesel (D) 07/01/1982 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(T) Annual tightness test/Inventory
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Unleaded Gas (B) 12/01/1984 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(T) Annual tightness test/Inventory
 
 
Tank Tank Size Content Installed Placement Status
4 10000 Unleaded Gas (B) 12/01/1984 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(T) Annual tightness test/Inventory
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
GUARANTEE   04/30/2023 08/28/2024
GUARANTEE   04/24/2022 08/21/2023
GUARANTEE   04/25/2021 08/27/2022
INSURANCE   12/01/2019 12/01/2020 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2018 12/01/2019 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   01/01/2017 01/01/2018 COMMERCE & INDUSTRY
INSURANCE   12/01/2016 12/01/2017 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2013 12/01/2014 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2013 12/01/2016 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/17/2009 12/01/2011 CHUBB
INSURANCE   12/17/2008 12/17/2009 AMERICAN INTERNATIONAL SPECIALTY LINES
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 12/12/2005 12/16/2005 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes NO VIOLATIONS NOTED THIS INSPECTION
 
TCI 10/28/2004 10/29/2004 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/4 COMPLIANCE ASSURANCE
 
TCI 02/04/2004 03/04/2004 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/4 COMPLIANCE ASSURANCE
 
TCI 02/05/2003 03/04/2004 IN-COMPLIANCE JOHN S. STEVENSON 0/4 COMPLIANCE ASSURANCE
 
TCI 01/09/2002 01/25/2002 IN-COMPLIANCE JOHN S. STEVENSON 0/4 COMPLIANCE ASSURANCE
 
TCR 03/15/2001 04/10/2001 IN-COMPLIANCE STEVENSON_JS 0/4 COMPLIANCE ASSURANCE
 
TCI 01/25/2001 01/29/2001 MINOR OUT-OF-COMPLIANCE STEVENSON_JS 0/4 COMPLIANCE ASSURANCE
 
RRBD 04/13/2000 04/14/2000 STEVENSON_JS 0/0 COMPLIANCE ASSURANCE
 
TCI 03/17/2000 03/29/2000 MINOR OUT-OF-COMPLIANCE STEVENSON_JS 0/4 COMPLIANCE ASSURANCE
 
RRBD 02/04/1999 03/29/1999 STEVENSON_J 0/0 COMPLIANCE ASSURANCE
 
TCI 01/15/1999 03/29/1999 MINOR OUT-OF-COMPLIANCE STEVENSON_J 0/4 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Enforcement Referral 03/20/2024 Accepted ELLIOTT_EV_1 Enforcement
 
Electronic Communication 01/08/2024 Satisfied ELLIOTT_EV_1 Routine Compliance
 
Letter 12/21/2023 Satisfied ELLIOTT_EV_1 Compliance Assistance
 
Site Inspection 12/20/2023 Major Out of Compliance ELLIOTT_EV_1 0/2 Routine Compliance
 
Letter 01/10/2023 Satisfied WILSON_ML_1 Component Closure
 
Document Management 01/10/2023 Satisfied WILSON_ML_1 Component Closure
 
TCAR 01/10/2023 Satisfied PAYNE_CL_1 Component Closure
 
Letter 11/29/2022 Satisfied WILSON_ML_1 Component Installation
 
Site Inspection 11/28/2022 In Compliance ELLIOTT_EV_1 0/2 Component Installation
 
Electronic Communication 08/31/2022 Satisfied GARTIN_D Component Installation
 
Enforcement Tracking 07/06/2022 Closed Without Enforcement MATHERLY_H Enforcement
 
Letter 04/06/2022 Satisfied MATHERLY_H Enforcement
 
Enforcement Referral 03/30/2022 Accepted GARTIN_D Enforcement
 
Record Document 03/17/2022 Satisfied GARTIN_D Compliance Assistance
 
Electronic Communication 03/17/2022 Satisfied GARTIN_D Compliance Assistance
 
Electronic Communication 03/01/2022 Satisfied GARTIN_D Compliance Assistance
 
Record Document 03/01/2022 Satisfied GARTIN_D Compliance Assistance
 
Site Inspection 01/03/2022 Major Out of Compliance GARTIN_D 0/2 Routine Compliance
 
Letter 01/03/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Electronic Communication 01/03/2022 Satisfied GARTIN_D Routine Compliance
 
Electronic Communication 01/03/2022 Satisfied GARTIN_D Routine Compliance
 
Issue Document 01/03/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 03/03/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 03/03/2020 Satisfied WILSON_ML_1 Compliance Assistance
 
Electronic Communication 03/02/2020 Satisfied BRAGG_SD_2 Compliance Assistance
 
Electronic Communication 03/02/2020 Satisfied BRAGG_SD_2 Compliance Assistance
 
Letter 12/05/2019 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 12/05/2019 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 12/04/2019 Minor Out of Compliance BRAGG_SD_2 0/2 Routine Compliance
 
Issue Document 08/28/2017 Satisfied WILSON_ML_1 Routine Compliance
 
Site Inspection 08/23/2017 In Compliance BRAGG_SD_2 0/2 Routine Compliance
 
Electronic Communication 08/16/2017 Satisfied BRAGG_SD_2 Routine Compliance
 
Site Inspection 05/30/2017 In Compliance BRAGG_SD_2 0/2 Closure
 
Site Inspection 05/30/2017 In Compliance BRAGG_SD_2 0/2 Installation
 
Site Inspection 12/22/2015 In Compliance PAYNE_CL_1 0/2 Routine Compliance
 
Emergency Preparedness Information 12/16/2015 Satisfied PAYNE_CL_1 Routine Compliance
 
Site Inspection 02/25/2014 In Compliance PAYNE_CL_1 0/2 Routine Compliance
 
Emergency Preparedness Information 02/19/2014 Satisfied PAYNE_CL_1 Routine Compliance
 
Emergency Preparedness Information 09/08/2011 Satisfied PORTER_AJ_1 Routine Compliance
 
Site Inspection 09/08/2011 In Compliance PORTER_AJ_1 0/2 Routine Compliance
 
Meeting 07/11/2011 Satisfied GILLMAN_M Non-Compliance
 
Document Management 07/01/2011 Complete PORTER_AJ_1 Incident
 
Incident 06/29/2011 Has not led to Discharge PORTER_AJ_1 Incident
 
Document Management 01/11/2011 Complete PORTER_AJ_1 Incident
 
Incident 01/04/2011 Has not led to Discharge PORTER_AJ_1 Incident
 
Site Inspection 12/08/2010 In Compliance PORTER_AJ_1 0/2 Non-Compliance
 
Document Management 12/03/2010 Complete PORTER_AJ_1 Incident
 
Site Inspection 12/02/2010 In Compliance PORTER_AJ_1 0/2 Non-Compliance
 
Incident 12/02/2010 Has not led to Discharge PORTER_AJ_1 Incident
 
Letter 11/15/2010 Satisfied PIERCE_LL_1 Non-Compliance
 
Site Inspection 11/04/2010 Minor Out of Compliance PORTER_AJ_1 0/2 Non-Compliance
 
Letter 10/18/2010 Satisfied PIERCE_LL_1 Non-Compliance
 
Site Inspection 09/27/2010 Minor Out of Compliance PORTER_AJ_1 0/2 Routine Compliance
 
Phone Conversation 12/14/2009 Satisfied PORTER_AJ_1 Routine Compliance
 
Site Inspection 10/05/2009 Major Out of Compliance PORTER_AJ_1 0/2 Routine Compliance
 
Site Inspection 05/19/2009 In Compliance STEVENSON_JS 0/2 Non-Compliance
 
Letter 03/09/2009 Satisfied STEVENSON_JS Non-Compliance
 
Emergency Preparedness Information 03/06/2009 Satisfied STEVENSON_JS Routine Compliance
 
Site Inspection 03/06/2009 Major Out of Compliance STEVENSON_JS 0/2 Non-Compliance
 
Letter 02/27/2009 Satisfied STEVENSON_JS Non-Compliance
 
Record Document 02/20/2009 Satisfied STEVENSON_JS Non-Compliance
 
Site Inspection 02/19/2009 Major Out of Compliance STEVENSON_JS 0/2 Routine Compliance
 
Record Document 10/14/2008 Satisfied STEVENSON_JS Non-Compliance
 
Record Document 05/30/2008 Satisfied STEVENSON_JS Non-Compliance
 
Letter 11/15/2007 Satisfied STEVENSON_JS Non-Compliance
 
Site Inspection 10/26/2007 Major Out of Compliance STEVENSON_JS 0/2 Routine Compliance
 
Emergency Preparedness Information 02/07/2007 Satisfied HALE_JS_1 Routine Compliance
 
Site Inspection 11/08/2006 In Compliance TISSINGTON_AB_1 0/2 Routine Compliance
 
Emergency Preparedness Information 09/21/2006 Satisfied STEVENSON_JS Routine Compliance
 
Site Inspection 07/24/2006 In Compliance TISSINGTON_AB_1 0/2 Installation
 
 
 
No Open AOCs Found
 
 
No Open Violations Found
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
08/30/1989   COMPLETED 30 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE