![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Broward | Status | OPEN | ||||||||
ID | 8627788 | Latitude | 26° 11' 14.4409 | ||||||||
Name |
SUNOCO-TWIN OIL CO 4891 POWERLINE RD |
Longitude | 80° 9' 19.8739 | ||||||||
OAKLAND PARK, FL 33309-3808 | LL Method | DGPS | |||||||||
Contact | MATTHEW BERNSTEIN | LL Status | REVIEWED | ||||||||
Phone | (561) 212-5328 | Status Date | 11/24/2003 | ||||||||
Account Owner Information | |||||||||||
Name | TWIN OIL COMPANY 15300 NW 7TH AVE MIAMI, FL 33169-6204 |
Effective Date | 07/25/1986 | ||||||||
Contact | GABRIEL VOLANTE | ||||||||||
Phone | (305) 688-9613 | ||||||||||
MBTWINOIL@AOL.COM | |||||||||||
Placard # / Date | 680530 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | VP PROPERTIES & DEVELOPMENTS LLP 15300 NW 7TH AVE MIAMI, FL 33169 |
Effective Date | 10/28/2020 | ||||||||
Contact | GABRIEL VOLANTE | ||||||||||
Phone | (305) 688-9613 | ||||||||||
MBTWINOIL@AOL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 8000 | Ethanol E10 (8) | 03/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 8000 | Ethanol E10 (8) | 03/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 8000 | Ethanol E85 (9) | 03/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 10000 | Vehicular Diesel (D) | 03/01/1991 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Leaded Gas (A) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (7) Automatically sampled wells (8) Manually sampled wells |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Leaded Gas (A) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (7) Automatically sampled wells (8) Manually sampled wells |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Leaded Gas (A) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (7) Automatically sampled wells (8) Manually sampled wells |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Vehicular Diesel (D) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (7) Automatically sampled wells (8) Manually sampled wells |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Gasohol (C) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (7) Automatically sampled wells (8) Manually sampled wells |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 4000 | Gasohol (C) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (7) Automatically sampled wells (8) Manually sampled wells |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 4000 | Gasohol (C) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (7) Automatically sampled wells (8) Manually sampled wells |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 550 | Kerosene (K) | ABOVEGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 12/15/2023 | 01/15/2024 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 12/15/2021 | 12/15/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 12/15/2019 | 12/15/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 12/15/2016 | 12/15/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 12/15/2013 | 12/15/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/15/2011 | 12/15/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/15/2009 | 12/15/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/15/2007 | 12/15/2008 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 12/19/2005 | IN-COMPLIANCE | SINGER_S | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/08/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | SINGER_S | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/10/2004 | 12/13/2004 | IN-COMPLIANCE | SINGER_S | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 11/07/2003 | 11/14/2003 | IN-COMPLIANCE | SINGER_S | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 09/10/2003 | 09/17/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SINGER_S | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 06/16/2003 | 06/18/2003 | IN-COMPLIANCE | PINE_CM | 0/4 | COMPLIANCE ASSURANCE | |||||
CFFE | 06/16/2003 | 06/18/2003 | PINE_CM | 0/0 | COMPLIANCE ASSURANCE | ||||||
WLI | 05/13/2003 | 05/05/2003 | PINE_CM | 0/0 | DISCHARGE PROJECT | ||||||
EPI | 05/05/2003 | 06/09/2003 | PINE_CM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 05/01/2003 | 06/09/2003 | MINOR OUT-OF-COMPLIANCE | PINE_CM | 0/4 | COMPLIANCE ASSURANCE | |||||
DRFR | 04/18/2003 | 05/02/2003 | PINE_CM | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes SURFACE RUNOFF FROM DIESEL DISPENSER, ASSESSMENT WELL UNCAPPED. | |||||||||||
TDI | 04/18/2003 | 05/05/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | PINE_CM | 0/4 | DISCHARGE PROJECT | |||||
DCCR | 04/18/2003 | 05/05/2003 | PINE_CM | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes NEW DISCHARGE DICOVERED DURING INVESTIGATION OF AN EARLIER DISCHARGE (DRF RECEIVED 4-16-03); GROUNDWATER IMPACTED THRU ASSESSMENT WELL #DW-4 THAT HAD BEEN LEFT UN-CAPPED. | |||||||||||
TDI | 04/18/2003 | 05/02/2003 | MINOR OUT-OF-COMPLIANCE | PINE_CM | 0/4 | DISCHARGE PROJECT | |||||
DCNC | 04/16/2003 | 05/05/2003 | PINE_CM | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes OVERFILL/SPILL CLEANED UP WITH ABSORBENT PADS. IMPACTED STORM, DRAIN PUM[ED OUT BY SWS, INC. VAC TRUCK. COPY OF SPENT ABSORBENT MATERIAL MANIFEST ON FILE. | |||||||||||
DRFR | 04/16/2003 | 04/17/2003 | PINE_CM | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DRF FILED AS A RESULT OF DIESEL FUEL OVERFILL THAT WASHED DOWN POWERLINE RD. INTO A STORM DRAIN THAT WAS PUMPED OUT BY SWS, INC. VAC-TRUCK. ABSORBENT PADS ALSO USED TO CLEANUP SPILL. | |||||||||||
LTR | 03/05/2003 | 03/06/2003 | YOUNES_A | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ENFORCEMENT FORWARDED A LETTER RE SETTLEMENT OF OPEN NOV CASE TO RESPONDENT. | |||||||||||
TCR | 02/17/2003 | 03/06/2003 | IN-COMPLIANCE | PINE_CM | 0/4 | COMPLIANCE ASSURANCE | |||||
DCCR | 02/06/2003 | 03/06/2003 | MELLACHERUVU_SX | 0/0 | DISCHARGE PROJECT | ||||||
TCR | 02/04/2003 | 02/10/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | PINE_CM | 0/4 | COMPLIANCE ASSURANCE | |||||
MDR | 02/04/2003 | 03/06/2003 | MELLACHERUVU_SX | 0/0 | DISCHARGE PROJECT | ||||||
NOVI | 12/19/2002 | 12/20/2002 | PINE_CM | 0/0 | COMPLIANCE ASSURANCE | ||||||
CRLE | 11/14/2002 | 11/14/2002 | PINE_CM | 0/0 | COMPLIANCE ASSURANCE | ||||||
EPI | 11/08/2002 | 11/14/2002 | PINE_CM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 10/24/2002 | 11/08/2002 | MINOR OUT-OF-COMPLIANCE | PINE_CM | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 10/07/2002 | 11/06/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | PINE_CM | 0/4 | COMPLIANCE ASSURANCE | |||||
WLI | 08/12/2002 | 07/31/2002 | PINE_CM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCDI | 07/19/2002 | 07/31/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | PINE_CM | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes PSEUDO TCI. AHY. | |||||||||||
TDI | 07/19/2002 | 07/29/2002 | IN-COMPLIANCE | PINE_CM | 0/4 | DISCHARGE PROJECT | |||||
TCI | 04/10/2002 | 04/24/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | SINGER_S | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 11/27/2000 | 12/06/2000 | IN-COMPLIANCE | SINGER_S | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 11/14/2000 | 11/21/2000 | MINOR OUT-OF-COMPLIANCE | SINGER_S | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 09/15/1999 | 09/27/1999 | IN-COMPLIANCE | WICKE_C | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/07/1999 | 03/17/1999 | IN-COMPLIANCE | WICKE_C | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 01/17/2024 | Major Out of Compliance | DUBOFF_EM_1 | 0/4 | Routine Compliance | ||||||
Letter | 01/17/2024 | Satisfied | DUBOFF_EM_1 | Compliance Assistance | |||||||
Letter | 06/07/2023 | Satisfied | KOENIG_EJ_1 | Compliance Assistance | |||||||
Letter | 09/27/2022 | Satisfied | KOENIG_EJ_1 | Component Closure | |||||||
TCAR | 09/27/2022 | Satisfied | KOENIG_EJ_1 | Component Closure | |||||||
Site Inspection | 08/05/2022 | In Compliance | LECSAINT_S_1 | 0/4 | Component Installation | ||||||
Letter | 08/05/2022 | Satisfied | KOENIG_EJ_1 | Enforcement | |||||||
Record Document | 08/05/2022 | Satisfied | LECSAINT_S_1 | Compliance Assistance | |||||||
Enforcement Tracking | 08/05/2022 | Closed Without Enforcement | KOENIG_EJ_1 | Enforcement | |||||||
Site Inspection | 08/04/2022 | Minor Out of Compliance | LECSAINT_S_1 | 0/4 | Component Closure | ||||||
Letter | 03/31/2022 | Satisfied | LECSAINT_S_1 | Compliance Assistance | |||||||
Electronic Communication | 03/31/2022 | Satisfied | LECSAINT_S_1 | Routine Compliance | |||||||
Site Inspection | 03/30/2022 | Minor Out of Compliance | LECSAINT_S_1 | 0/4 | Routine Compliance | ||||||
Record Document | 03/30/2022 | Satisfied | LECSAINT_S_1 | Compliance Assistance | |||||||
Issue Document | 10/27/2020 | Satisfied | GOMEZ_AE_1 | Enforcement | |||||||
Letter | 10/27/2020 | Satisfied | GOMEZ_AE_1 | Enforcement | |||||||
Record Document | 10/27/2020 | Satisfied | GOMEZ_AE_1 | Enforcement | |||||||
Phone Conversation | 07/21/2020 | Satisfied | LECSAINT_S_1 | Routine Compliance | |||||||
Enforcement Referral | 07/17/2020 | Accepted | GOMEZ_AE_1 | Enforcement | |||||||
Letter | 02/28/2020 | Satisfied | LECSAINT_S_1 | Compliance Assistance | |||||||
Site Inspection | 02/28/2020 | Minor Out of Compliance | LECSAINT_S_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 02/26/2020 | Satisfied | LECSAINT_S_1 | Routine Compliance | |||||||
Site Inspection | 05/04/2017 | In Compliance | SINGER_SD_1 | 0/4 | Non-Compliance | ||||||
Letter | 04/27/2017 | Satisfied | SINGER_SD_1 | Non-Compliance | |||||||
Site Inspection | 04/27/2017 | Minor Out of Compliance | SINGER_SD_1 | 0/4 | Routine Compliance | ||||||
Phone Conversation | 04/11/2017 | Satisfied | SINGER_SD_1 | Routine Compliance | |||||||
Engineering Request | 06/05/2015 | Satisfied | GOMEZ_AE_1 | Routine Compliance | |||||||
Site Inspection | 06/27/2014 | In Compliance | SINGER_SD_1 | 0/4 | Non-Compliance | ||||||
Letter | 06/09/2014 | Satisfied | SINGER_SD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 06/09/2014 | Satisfied | SINGER_SD_1 | Routine Compliance | |||||||
Site Inspection | 06/09/2014 | Minor Out of Compliance | SINGER_SD_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 05/01/2012 | In Compliance | SINGER_SD_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 05/01/2012 | In Compliance | SINGER_SD_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/01/2012 | Satisfied | SINGER_SD_1 | Routine Compliance | |||||||
Site Inspection | 01/27/2011 | In Compliance | SINGER_SD_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 12/08/2010 | Minor Out of Compliance | SINGER_SD_1 | 0/4 | Non-Compliance | ||||||
Letter | 12/08/2010 | Satisfied | SINGER_SD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 11/19/2010 | Satisfied | SINGER_SD_1 | Routine Compliance | |||||||
Site Inspection | 11/18/2010 | Minor Out of Compliance | SINGER_SD_1 | 0/4 | Routine Compliance | ||||||
Letter | 11/18/2010 | Satisfied | SINGER_SD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 12/04/2009 | Satisfied | SINGER_SD_1 | Routine Compliance | |||||||
Site Inspection | 11/19/2009 | In Compliance | SINGER_SD_1 | 0/4 | Non-Compliance | ||||||
Record Document | 10/21/2009 | Satisfied | SINGER_SD_1 | Non-Compliance | |||||||
Site Inspection | 10/19/2009 | Major Out of Compliance | SINGER_SD_1 | 0/4 | Routine Compliance | ||||||
Letter | 10/19/2009 | Satisfied | SINGER_SD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 08/27/2008 | Satisfied | COOPER_RA_1 | Routine Compliance | |||||||
Letter | 08/27/2008 | Satisfied | COOPER_RA_1 | Non-Compliance | |||||||
Site Inspection | 08/27/2008 | Minor Out of Compliance | COOPER_RA_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 01/14/2008 | In Compliance | SINGER_SD_1 | 0/4 | Non-Compliance | ||||||
Letter | 11/14/2007 | Satisfied | SINGER_SD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 11/13/2007 | Satisfied | SINGER_SD_1 | Routine Compliance | |||||||
Site Inspection | 11/13/2007 | Major Out of Compliance | SINGER_SD_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | SINGER_SD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | SINGER_SD_1 | Routine Compliance | |||||||
Site Inspection | 09/07/2006 | In Compliance | SINGER_SD_1 | 0/4 | Non-Compliance | ||||||
Letter | 08/07/2006 | Satisfied | SINGER_SD_1 | Non-Compliance | |||||||
Site Inspection | 08/07/2006 | Major Out of Compliance | SINGER_SD_1 | 0/4 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/11/2024 | 6057 | SNC-B | 4.7 Release detection not installed, operated, and maintained per manufacturer's instructions and standards. | Fix sensor and send to inspector at eduboff@broward.org | |||||||
01/11/2024 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Investigate why veeder-root is alarming and repair per applicable standards. Clear fuel alarm and send photo to inspector at eduboff@broward.org | |||||||
01/11/2024 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Drain liquid from containments and send photo proof to inspector at eduboff@broward.org | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/18/2003 | COMPLETED | 31 | |||||||||
07/19/2002 | COMPLETED | 31 | |||||||||
11/10/1998 | INACTIVE | 10 | |||||||||
09/08/1988 | ACTIVE | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||