Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||
District | Northeast | Type | Fuel user/Non-retail | ||||
County | Alachua | Status | OPEN | ||||
ID | 8627819 | Latitude | 29° 39' 38.4656 | ||||
Name |
HCA FLORIDA- NORTH FLORIDA HOSPITAL 6500 W NEWBERRY RD (HWY 26 & I-75) |
Longitude | 82° 24' 40.0802 | ||||
GAINESVILLE, FL 32604-7006 | LL Method | DPHO | |||||
Contact | MICHAEL LYNCH | LL Status | REVIEWED | ||||
Phone | (352) 333-4160 | Status Date | 04/07/2003 | ||||
Account Owner Information | |||||||
Name | NORTH FL REGIONAL MEDICAL CENTER PO BOX 147006 GAINESVILLE, FL 32614-7006 |
Effective Date | 11/06/1986 | ||||
Contact | ROXANNE.ROSIER / ERIC.LAWSON 352-333-4060 | ||||||
Phone | (352) 333-4160 | ||||||
ROXANNE.ROSIER@HCAHELATHCARE.COM | |||||||
Placard # / Date | 699637 - 07/16/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
10 | 6342 | Emerg Generator Diesel (G) | 02/01/2023 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall |
(B) Steel/galvanized metal | (Z) DEP approved monitoring | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
11 | 3575 | Emerg Generator Diesel (G) | 02/01/2023 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall |
(B) Steel/galvanized metal | (Z) DEP approved monitoring | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
12 | 1016 | Vehicular Diesel (D) | 09/01/2023 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (B) Steel/galvanized metal | (Q) Visual inspection of ASTs | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 6000 | Emerg Generator Diesel (G) | 11/01/1989 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (I) Suction piping system |
(F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
5 | 12000 | Emerg Generator Diesel (G) | 11/01/2002 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (O) Tight fill (P) Level gauges/alarms |
(B) Steel/galvanized metal (C) Fiberglass (J) Pressurized piping system (M) Double wall - pipe jacket |
(3) Electronic monitor pipe sumps (J) Monitor piping/liner space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
6 | 12000 | Fuel Oil - Onsite Heat (M) | 11/01/2002 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (O) Tight fill (P) Level gauges/alarms |
(B) Steel/galvanized metal (C) Fiberglass (J) Pressurized piping system (M) Double wall - pipe jacket |
(3) Electronic monitor pipe sumps (J) Monitor piping/liner space (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
7 | 5000 | Emerg Generator Diesel (G) | 11/01/2012 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (O) Tight fill |
(F) Double wall (J) Pressurized piping system (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
8 | 1000 | Leaded Gas (A) | 03/01/2019 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket (X) Concrete |
(X) No piping associated w/tank | (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
9 | 6342 | Emerg Generator Diesel (G) | 02/01/2023 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall |
(B) Steel/galvanized metal | (Z) DEP approved monitoring | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 30000 | Generator/Pump Diesel (H) | 07/01/1972 | UNDERGROUND | Closed In Place (A) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 4000 | Emerg Generator Diesel (G) | 02/01/1991 | ABOVEGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (F) Double wall (I) Suction piping system |
(I) Not required | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
4 | 4000 | Emerg Generator Diesel (G) | 12/01/1998 | ABOVEGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (I) Suction piping system |
(3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
INSURANCE | ACE | ||||||
INSURANCE | 09/01/2023 | 09/01/2024 | ILLINOIS UNION INSURANCE COMPANY | ||||
INSURANCE | 09/01/2022 | 09/01/2023 | ACE AMERICAN INSURANCE COMPANY | ||||
INSURANCE | 09/01/2021 | 09/01/2022 | ACE AMERICAN INSURANCE COMPANY | ||||
INSURANCE | 09/01/2020 | 09/01/2021 | ACE AMERICAN INSURANCE COMPANY | ||||
INSURANCE | 09/01/2019 | 09/01/2020 | ACE AMERICAN INSURANCE COMPANY | ||||
INSURANCE | 09/01/2018 | 09/01/2019 | ACE | ||||
INSURANCE | 09/01/2017 | 09/01/2018 | ACE | ||||
INSURANCE | 09/01/2016 | 09/01/2017 | ACE AMERICAN INSURANCE COMPANY | ||||
INSURANCE | 09/01/2015 | 09/01/2016 | ACE AMERICAN INSURANCE COMPANY | ||||
INSURANCE | 09/01/2014 | 09/01/2015 | ACE | ||||
INSURANCE | 09/01/2013 | 09/01/2014 | ACE | ||||
INSURANCE | 09/01/2012 | 09/01/2013 | ACE | ||||
INSURANCE | 09/01/2010 | 09/01/2011 | STEADFAST | ||||
INSURANCE | 09/01/2009 | 09/01/2010 | STEADFAST | ||||
INSURANCE | 09/01/2008 | 09/01/2009 | STEADFAST | ||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
TCI | 04/20/2005 | 04/22/2005 | IN-COMPLIANCE | OWENS_JS | 2/1 | COMPLIANCE ASSURANCE | |
TCR | 06/10/2004 | 06/14/2004 | IN-COMPLIANCE | OWENS_JS | 2/1 | COMPLIANCE ASSURANCE | |
Completion Notes SUMPS FREE OF LIQUIDS, PROBE REPIRED AND TESTED | |||||||
TCI | 04/13/2004 | 04/15/2004 | MINOR OUT-OF-COMPLIANCE | OWENS_JS | 2/1 | COMPLIANCE ASSURANCE | |
RRBD | 05/20/2003 | 05/21/2003 | RAMSEY_T | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes RECEIVED COPY OF INSURANCE | |||||||
TCI | 05/08/2003 | 05/15/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | OWENS_JS | 2/1 | COMPLIANCE ASSURANCE | |
TIN | 02/11/2003 | 02/17/2003 | IN-COMPLIANCE | OWENS_JS | 2/0 | COMPLIANCE ASSURANCE | |
Completion Notes 2 NEW 12,000 AST'S INSTALLED | |||||||
TXI | 01/17/2003 | 02/17/2003 | IN-COMPLIANCE | OWENS_JS | 2/0 | COMPLIANCE ASSURANCE | |
Completion Notes 2 - 4,000 AST'S REMOVED | |||||||
TCI | 03/16/2002 | 03/18/2002 | IN-COMPLIANCE | CHANDLER_R | 2/1 | COMPLIANCE ASSURANCE | |
Completion Notes COMPLIANCE INSPECTION | |||||||
TCI | 04/05/2001 | 04/06/2001 | IN-COMPLIANCE | CHANDLER_R | 2/1 | COMPLIANCE ASSURANCE | |
Completion Notes COMPLIANCE INSPECTION | |||||||
TCR | 06/01/2000 | 06/02/2000 | IN-COMPLIANCE | DC | 2/1 | COMPLIANCE ASSURANCE | |
Completion Notes COMPLIANCE REINSPECTION | |||||||
TCI | 05/24/2000 | 06/02/2000 | MINOR OUT-OF-COMPLIANCE | DC | 2/1 | COMPLIANCE ASSURANCE | |
Completion Notes COMPLIANCE INSPECTION | |||||||
TCI | 06/08/1999 | 06/16/1999 | IN-COMPLIANCE | CHANDLER_D | 3/0 | COMPLIANCE ASSURANCE | |
ATII | 12/29/1998 | 01/04/1999 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||
Completion Notes NEW AST | |||||||
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Site Inspection | 01/12/2025 | Major Out of Compliance | HARRINGTON_RD_1 | 6/2 | Closure | ||
Electronic Communication | 01/12/2025 | Satisfied | HARRINGTON_RD_1 | Closure | |||
Letter | 01/12/2025 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||
Discharge Reporting | 09/02/2024 | Satisfied | HARRINGTON_RD_1 | Discharge | |||
Electronic Communication | 09/02/2024 | Satisfied | RAMSEY_TH_1 | Discharge | |||
Letter | 06/11/2024 | Satisfied | JACKSON_SM | Enforcement | |||
Enforcement Tracking | 06/11/2024 | Closed Without Enforcement | JACKSON_SM | Enforcement | |||
Site Inspection | 06/02/2024 | In Compliance | HARRINGTON_RD_1 | 6/2 | Installation | ||
Electronic Communication | 06/02/2024 | Satisfied | HARRINGTON_RD_1 | Installation | |||
Electronic Communication | 06/02/2024 | Satisfied | HARRINGTON_RD_1 | Installation | |||
Site Inspection | 06/02/2024 | In Compliance | HARRINGTON_RD_1 | 2/0 | Installation | ||
Letter | 04/30/2024 | Satisfied | JACKSON_SM | Enforcement | |||
Enforcement Referral | 03/05/2024 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||
Site Inspection | 12/12/2023 | Major Out of Compliance | HARRINGTON_RD_1 | 6/2 | Discharge | ||
Letter | 12/12/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||
Site Inspection | 12/12/2023 | Major Out of Compliance | HARRINGTON_RD_1 | 6/2 | Installation | ||
Electronic Communication | 12/12/2023 | Satisfied | HARRINGTON_RD_1 | Discharge | |||
Electronic Communication | 12/12/2023 | Satisfied | HARRINGTON_RD_1 | Installation | |||
Record Document | 10/10/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Site Inspection | 09/14/2022 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 2/2 | Routine Compliance | ||
Phone Conversation | 09/14/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Letter | 09/14/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Electronic Communication | 09/14/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Phone Conversation | 06/28/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Record Document | 03/15/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||
Site Inspection | 02/15/2022 | Minor Out of Compliance | HARRINGTON_RD_1 | 2/2 | Compliance Assistance | ||
Electronic Communication | 02/15/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||
Site Inspection | 12/15/2020 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 2/2 | Routine Compliance | ||
Electronic Communication | 12/15/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Letter | 12/15/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Electronic Communication | 11/30/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Letter | 05/19/2019 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||
Site Inspection | 05/19/2019 | Major Out of Compliance | HARRINGTON_RD_1 | 1/2 | Installation | ||
Electronic Communication | 02/28/2019 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||
Letter | 02/28/2019 | Satisfied | KEIM_MJ_1 | Compliance Assistance | |||
Site Inspection | 02/28/2019 | Minor Out of Compliance | KEIM_MJ_1 | 1/2 | Routine Compliance | ||
Electronic Communication | 02/28/2019 | Satisfied | KEIM_MJ_1 | Routine Compliance | |||
Record Document | 06/29/2017 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Record Document | 06/29/2017 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||
Letter | 01/18/2017 | Satisfied | ZIMMERMAN_RA_2 | Non-Compliance | |||
Electronic Communication | 01/17/2017 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||
Site Inspection | 01/17/2017 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 1/2 | Routine Compliance | ||
Phone Conversation | 12/30/2016 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||
Site Inspection | 02/06/2015 | In Compliance | HARRINGTON_RD_1 | 1/2 | Routine Compliance | ||
Electronic Communication | 05/06/2013 | Satisfied | HARRINGTON_RD_1 | Installation | |||
Site Inspection | 05/06/2013 | In Compliance | HARRINGTON_RD_1 | 0/1 | Installation | ||
Record Document | 05/03/2013 | Satisfied | HARRINGTON_RD_1 | Installation | |||
Record Document | 03/13/2013 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||
Site Inspection | 02/25/2013 | Minor Out of Compliance | HARRINGTON_RD_1 | 1/1 | Routine Compliance | ||
Electronic Communication | 02/25/2013 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||
Letter | 02/25/2013 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||
Site Inspection | 05/11/2011 | In Compliance | OWENS_JS_1 | 1/1 | Routine Compliance | ||
Site Inspection | 05/05/2010 | In Compliance | OWENS_JS_1 | 1/1 | Routine Compliance | ||
Site Inspection | 05/04/2009 | In Compliance | OWENS_JS_1 | 1/1 | Routine Compliance | ||
Record Document | 03/26/2008 | Satisfied | OWENS_JS_1 | Routine Compliance | |||
Site Inspection | 03/25/2008 | In Compliance | OWENS_JS_1 | 1/1 | Routine Compliance | ||
Site Inspection | 05/02/2007 | In Compliance | OWENS_JS_1 | 1/1 | Routine Compliance | ||
Letter | 12/04/2006 | Satisfied | RAMSEY_TH_1 | Non-Compliance | |||
Site Inspection | 05/24/2006 | In Compliance | OWENS_JS_1 | 2/1 | Non-Compliance | ||
Site Inspection | 04/25/2006 | Minor Out of Compliance | OWENS_JS_1 | 2/1 | Routine Compliance | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
01/12/2025 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair or replace the Tank 2 spill bucket. Provide spill bucket Integrity Test result after the replacement or repair. | |||
01/10/2025 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Please provide verification of Storage Tank Financial Responsibility and facility-completed CFR Form. * The CFR Form will be sent to the facility with the Tank 2 closure inspection report. | |||
01/07/2025 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Please provide Incident Notification Form in regards to the failed spill bucket Integrity Test described above. | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
07/17/1990 | COMPLETED | ||||||