Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Southwest   Type    Retail Station
 
County Polk   Status    OPEN
 
ID 8628340   Latitude    28° 0' 34.6659
 
Name SQRL SERVICE STATION -320
1200 3RD ST SW
Longitude    81° 43' 49.7826
  WINTER HAVEN, FL 33880-3911 LL Method    DPHO
 
Contact VEDAT SENTURK   LL Status    REVIEWED
 
Phone (407) 886-3338   Status Date    02/12/2024
 
Account Owner Information
 
Name SQRL SERVICE STATIONS LLC
27 RAHLING CIRCLE STE C
LITTLE ROCK, AR 72223
Effective Date    12/12/2022
 
Contact JAMAL HIZAM
 
Phone (504) 595-7385
 
Email JAMAL@SQRLHOLDINGS.COM
  Placard # / Date    661503 - 06/20/2023
Property Owner Information
 
Name SQRL SERVICE STATIONS LLC
27 RAHLING CIRCLE STE C
LITTLE ROCK, AR 72223
Effective Date    12/12/2022
 
Contact JAMAL HIZAM
 
Phone (504) 595-7385
 
Email JAMAL@SQRLHOLDINGS.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
12 3000 Vehicular Diesel (D) 02/01/1995 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(R) Double wall - tank jacket
  (B) Steel/galvanized metal
(G) Pipe trench liner
(I) Suction piping system
(K) Dispenser liners
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(J) Monitor piping/liner space
(V) Suction pump check valve
 
 
Tank Tank Size Content Installed Placement Status
13 12000 Unleaded Gas (B) 06/01/2001 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(I) Not required
 
 
Tank Tank Size Content Installed Placement Status
14 10000 Unleaded Gas (B) 06/01/2001 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(N) Approved synthetic material
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(I) Not required
 
 
Tank Tank Size Content Installed Placement Status
1 3000 Leaded Gas (A) 07/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
10 6000 Unleaded Gas (B) 03/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
11 6000 Unleaded Gas (B) 03/01/1989 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
2 3000 Leaded Gas (A) 07/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
3 3000 Leaded Gas (A) 07/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
4 3000 Leaded Gas (A) 07/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
5 10000 Unleaded Gas (B) 07/01/1974 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(S) Statistical Inventory Reconcile
 
 
Tank Tank Size Content Installed Placement Status
6 3000 Unleaded Gas (B) 07/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
7 3000 Unleaded Gas (B) 07/01/1968 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
9 550 Vehicular Diesel (D) 07/01/1974 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(B) Internal lining
(C) Steel
(M) Spill containment bucket
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(8) Manually sampled wells
(M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
8 550 Vehicular Diesel (D) UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (I) Not required
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   04/15/2015 04/15/2016 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   04/15/2013 04/15/2014 AMERICAN SAFETY INDEMNITY CO
INSURANCE   04/15/2012 04/15/2013 ZURICH-AMERICAN
INSURANCE   04/15/2011 04/15/2012 ZURICH-AMERICAN
INSURANCE   04/15/2010 04/15/2011 ZURICH-AMERICAN
INSURANCE   04/15/2009 04/15/2010 ZURICH-AMERICAN
INSURANCE   12/31/2001 12/31/2002 GREAT AMERICAN
INSURANCE   08/01/2000 08/01/2001 COMMERCE & INDUSTRY
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
NCLI 04/05/2006 04/05/2006 GONZALEZ_J 0/3 COMPLIANCE ASSURANCE
 
TCI 03/31/2006 04/05/2006 MINOR OUT-OF-COMPLIANCE GONZALEZ_J 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes TWO PHOTOS. PIPING: TANKS #13 & 14: DOUBLE WALLED, OPW PISCES FLEX LINES COP 15 (EQ-285) AND TANK #12: SINGLE WALL STEEL PIPING NOT IN CONTACT WITH SOIL. VIOLATIONS RESOLVED: 157/1117, 1105.
 
LTR 09/14/2005 09/30/2005 NEWBERG_D 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes SENT EMAIL ADVISING WE HAD NOT YET RECEIVED A COPY OF THE 2005 OPERABILITY TEST.
 
RRBD 08/17/2005 09/30/2005 NEWBERG_D 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes FAX NOTING GAUGE HAS BEEN TESTED AND WILL BE SCHEDULED ANNUALLY. ALSO ASKED IF WE HAD RECEIVED A COPY OF THE 2005 PERABILITY TEST.
 
TCI 05/12/2005 06/10/2005 MINOR OUT-OF-COMPLIANCE NEWBERG_D 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes NO PHOTOS TAKEN. PIPING-UNDERGROUND PRESSURIZED PIPING IS DOUBLE-WALLED FLEX MFG BY OPW. THE UNDERGROUND SUCTION PIPING IS SINGLE-WALLED STEEL BUT IS NOT IN CONTACT WITH THE SOIL.
 
NCLI 02/11/2004 02/23/2004 CROWELL_M 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes REQUESTED: ANNUAL OPERABILITY TEST RESULTS.
 
TCI 01/14/2004 02/09/2004 MINOR OUT-OF-COMPLIANCE CROWELL_M 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes NO PHOTOS TAKEN. PIPING: UNDERGROUND DOUBLE-WALL OPW FLEX PIPING. RESOLVES VIOLATION #155.
 
RRBD 04/18/2003 04/22/2003 HAUSCHILD_T 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes COPIES OF RELEASE DETECTION & LINE LEAK DETECTOR TESTS RECEIVED ALONG WITH COPY OF MONTHLY SHEET FOR RELEASE DETECTION.
 
NCLI 03/27/2003 04/01/2003 HAUSCHILD_T 0/0 COMPLIANCE ASSURANCE
 
TCI 03/17/2003 04/01/2003 SIGNIFICANT OUT-OF-COMPLIANCE HAUSCHILD_T 0/3 COMPLIANCE ASSURANCE
 
TIN 05/21/2002 05/30/2002 IN-COMPLIANCE HAUSCHILD_T 0/2 COMPLIANCE ASSURANCE
 
TCI 05/21/2002 05/30/2002 IN-COMPLIANCE HAUSCHILD_T 0/3 COMPLIANCE ASSURANCE
 
SV 09/05/2001 09/18/2001 HAUSCHILD_T 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING INSTALLATION
 
CWOE 09/05/2001 04/01/2002 HAUSCHILD_T 0/0 COMPLIANCE ASSURANCE
 
TXI 09/05/2001 09/18/2001 IN-COMPLIANCE HAUSCHILD_T 0/3 COMPLIANCE ASSURANCE
 
SV 06/27/2001 09/18/2001 HAUSCHILD_T 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes TANK CLOSURE
 
SV 06/26/2001 09/18/2001 RANDOLPH_L 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes TANK CLOSURE (2 VISITS)
 
RRBD 01/16/2001 01/17/2001 COMPLIANCE ASSURANCE
 
RRBD 12/13/2000 01/17/2001 COMPLIANCE ASSURANCE
 
NCLI 10/17/2000 10/18/2000 MURRAY_K 0/0 COMPLIANCE ASSURANCE
 
TCI 10/16/2000 10/18/2000 SIGNIFICANT OUT-OF-COMPLIANCE MURRAY_K 0/4 COMPLIANCE ASSURANCE
 
TCI 01/27/2000 02/08/2000 IN-COMPLIANCE NEWBERG_D 0/4 COMPLIANCE ASSURANCE
 
RRBD 06/29/1999 07/06/1999 CALLAHAM_C 0/0 COMPLIANCE ASSURANCE
 
TCI 02/24/1999 03/08/1999 SIGNIFICANT OUT-OF-COMPLIANCE NEWBERG_D 0/4 COMPLIANCE ASSURANCE
 
UTII 08/19/1997 08/29/1997 MINOR OUT-OF-COMPLIANCE COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Site Inspection 06/29/2024 Major Out of Compliance GLENN_LE_1 0/3 Routine Compliance
 
Electronic Communication 07/13/2021 Satisfied CASSELS_CR_2 Compliance Assistance
 
Letter 07/13/2021 Satisfied CASSELS_CR_2 Compliance Assistance
 
Site Inspection 07/13/2021 Major Out of Compliance CASSELS_CR_2 0/3 Routine Compliance
 
Electronic Communication 04/23/2021 Satisfied CASSELS_CR_2 Routine Compliance
 
Issue Document 04/23/2021 Satisfied CASSELS_CR_2 Routine Compliance
 
Phone Conversation 04/23/2021 Satisfied CASSELS_CR_2 Routine Compliance
 
Meeting 04/23/2021 Satisfied CASSELS_CR_2 Routine Compliance
 
Letter 11/01/2018 Satisfied BROWNLEE_S Enforcement
 
Electronic Communication 09/07/2018 Satisfied BROWNLEE_S Enforcement
 
Electronic Communication 08/06/2018 Satisfied BROWNLEE_S Enforcement
 
Electronic Communication 06/13/2018 Satisfied CASSELS_CR_2 Compliance Assistance
 
Electronic Communication 06/13/2018 Satisfied CASSELS_CR_2 Routine Compliance
 
Letter 06/12/2018 Satisfied CASSELS_CR_2 Compliance Assistance
 
Site Inspection 06/12/2018 Major Out of Compliance CASSELS_CR_2 0/3 Routine Compliance
 
Electronic Communication 01/08/2018 Satisfied BROWNLEE_S Enforcement
 
Enforcement Referral 01/04/2018 Accepted CASSELS_CR_2 Enforcement
 
Phone Conversation 12/27/2017 Satisfied CASSELS_CR_2 Routine Compliance
 
Electronic Communication 12/27/2017 Satisfied CASSELS_CR_2 Compliance Assistance
 
Electronic Communication 12/27/2017 Satisfied CASSELS_CR_2 Compliance Assistance
 
Phone Conversation 12/27/2017 Satisfied CASSELS_CR_2 Compliance Assistance
 
Phone Conversation 12/27/2017 Satisfied CASSELS_CR_2 Compliance Assistance
 
Electronic Communication 12/27/2017 Satisfied CASSELS_CR_2 Compliance Assistance
 
Electronic Communication 12/27/2017 Satisfied CASSELS_CR_2 Routine Compliance
 
Electronic Communication 10/14/2015 Satisfied MERRYMAN_DT_1 Routine Compliance
 
Site Inspection 10/14/2015 Minor Out of Compliance MERRYMAN_DT_1 0/3 Routine Compliance
 
Letter 10/14/2015 Satisfied MERRYMAN_DT_1 Non-Compliance
 
Phone Conversation 10/06/2015 Satisfied MERRYMAN_DT_1 Non-Compliance
 
Record Document 06/17/2014 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 12/31/2013 Major Out of Compliance WINN_JP_1 0/3 Routine Compliance
 
Letter 12/31/2013 Satisfied WINN_JP_1 Non-Compliance
 
Enforcement Tracking 11/20/2013 Closed Without Enforcement MEETZE_A Enforcement
 
Record Document 10/28/2013 Satisfied MEETZE_A Enforcement
 
Record Document 09/25/2013 Satisfied MEETZE_A Enforcement
 
Record Document 09/09/2013 Satisfied MEETZE_A Enforcement
 
Letter 09/09/2013 Satisfied MEETZE_A Non-Compliance
 
Site Inspection 09/04/2013 Major Out of Compliance MEETZE_A 0/3 Enforcement
 
Electronic Communication 08/26/2013 Satisfied MEETZE_A Enforcement
 
Electronic Communication 08/08/2013 Satisfied MEETZE_A Enforcement
 
Phone Conversation 08/05/2013 Satisfied MEETZE_A Enforcement
 
Electronic Communication 06/06/2013 Satisfied MEETZE_A Enforcement
 
Electronic Communication 04/01/2013 Satisfied MEETZE_A Enforcement
 
Electronic Communication 03/20/2013 Satisfied MEETZE_A Enforcement
 
Record Document 03/20/2013 Satisfied MEETZE_A Enforcement
 
Record Document 03/18/2013 Satisfied MEETZE_A Enforcement
 
Enforcement Referral 02/05/2013 Accepted MEETZE_A Enforcement
 
Phone Conversation 01/14/2013 Satisfied DERY_WC_1 Non-Compliance
 
Electronic Communication 01/14/2013 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 01/02/2013 Major Out of Compliance DERY_WC_1 0/3 Non-Compliance
 
Letter 01/02/2013 Satisfied DERY_WC_1 Non-Compliance
 
Electronic Communication 12/28/2012 Satisfied DERY_WC_1 Routine Compliance
 
Phone Conversation 12/19/2012 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 12/19/2012 Satisfied DERY_WC_1 Non-Compliance
 
Electronic Communication 12/13/2012 Satisfied DERY_WC_1 Non-Compliance
 
Letter 08/21/2012 Satisfied DERY_WC_1 Non-Compliance
 
Site Inspection 08/21/2012 Major Out of Compliance DERY_WC_1 0/3 Routine Compliance
 
Record Document 06/28/2011 Satisfied NEWBERG_DR_1 Non-Compliance
 
Phone Conversation 06/27/2011 Satisfied NEWBERG_DR_1 Non-Compliance
 
Letter 05/27/2011 Satisfied NEWBERG_DR_1 Non-Compliance
 
Site Inspection 05/27/2011 Major Out of Compliance NEWBERG_DR_1 0/3 Routine Compliance
 
Site Inspection 05/20/2010 Minor Out of Compliance DERY_WC_1 0/3 Routine Compliance
 
Letter 05/20/2010 Satisfied DERY_WC_1 Non-Compliance
 
Phone Conversation 09/16/2009 Satisfied CASSELS_CR_1 Non-Compliance
 
Letter 09/10/2009 Satisfied CASSELS_CR_1 Non-Compliance
 
Site Inspection 06/25/2009 Minor Out of Compliance CASSELS_CR_1 0/1 Non-Compliance
 
Letter 06/25/2009 Satisfied CASSELS_CR_1 Non-Compliance
 
Phone Conversation 12/10/2008 Satisfied CASSELS_CR_1 Non-Compliance
 
Site Inspection 11/30/2008 Minor Out of Compliance CASSELS_CR_1 0/3 Routine Compliance
 
Letter 11/30/2008 Satisfied CASSELS_CR_1 Non-Compliance
 
Phone Conversation 11/20/2008 Satisfied CASSELS_CR_1 Routine Compliance
 
Record Document 03/17/2008 Satisfied NEWBERG_DR_1 Non-Compliance
 
Issue Document 12/07/2007 Satisfied NEWBERG_DR_1 Non-Compliance
 
Record Document 12/07/2007 Satisfied NEWBERG_DR_1 Non-Compliance
 
Site Inspection 09/27/2007 Minor Out of Compliance NEWBERG_DR_1 0/3 Routine Compliance
 
Letter 09/27/2007 Satisfied NEWBERG_DR_1 Non-Compliance
 
Phone Conversation 09/26/2007 Satisfied NEWBERG_DR_1 Routine Compliance
 
Emergency Preparedness Information 02/09/2007 Satisfied SLAPPEY_WR_1 Routine Compliance
 
Emergency Preparedness Information 09/20/2006 Satisfied SLAPPEY_WR_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
06/29/2024 6062 Minor 2.5 Release detection devices not tested annually. 2022 to present annual operability testing records of the Veeder-Root alarm panel and associated electronic sensors, monitoring the Regular and Premium tank and all piping interstices, must be provided to the Department or testing must be performed immediately and a copy of the test results provided to the Department.
 
06/29/2024 6001 Minor 2.1 No reasonable access provided. The Department must be contacted for re-inspection and access provided to the Veeder-Root panel and Diesel vacuum gauge monitoring the tank interstices and to the STP sumps, spill containment buckets and all dispenser liners.
 
07/13/2021 4076 Minor 4.11 Failure to conduct required periodic containment and interstitial integrity testing. The integrity testing of the STP sumps and dispenser liners must be performed immediately with a copy of the test results submitted to the Department.
 
07/13/2021 4062 SNC-B 4.6 Electronic release detection devices not inspected monthly. Submit copies of any previous monthly electronic monitoring records from 2018 through 2020.
 
07/13/2021 4076 Minor 4.11 Failure to conduct required periodic containment and interstitial integrity testing. Submit copies of any prior test records of the single-walled spill bucket annual integrity testing.
 
07/13/2021 4001 Minor 2.2 Operator certification requirements not met. Complete the required Class A, B & C Operator Training & Certification programs, as appropriate, for all facility personnel immediately, and submit a copy of the Certificates to the Department.
 
07/13/2021 4006 Minor 2.5 Following owner change or discovery of unregistered facility, Registration Form not submitted. A signed Storage Tank Facility Registration Form must be submitted to the Department. Please contact the inspector for assistance in completing the registration form with the proper codes.
 
07/13/2021 4068 Minor 4.3 Storage tank system has a not repaired component which has or could cause a release or discharge. The corrosion in the gas STP sumps, on steel components such as pump head, pump riser, and steel piping, including conduit, must be removed, and treated and/or re-coated with a rust inhibitive product to maintain corrosion protection.
 
07/13/2021 4077 Minor 4.12 Spill containment, sumps, and interstices not accessible. Water/regulated substances not timely removed. Petroleum contact water not properly managed. All dirt, debris, fuel residue, and PCW must be removed from the dispenser liners and the Department notified.
 
07/13/2021 4057 Minor 4.31 Overfill protection devices not registered or tested annually. Submit copies of any prior test records of the overfill protection annual testing.
 
06/12/2018 4015 Minor 2.10 Incomplete documentation demonstrating financial responsibility. Submit the appropriate DEP financial responsibility forms for the 2017-2018 and 2018-2018 policy periods to the Department.
 
06/12/2018 4014 SNC-B 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. The 2017-2018 and 2018-2019 insurance policies for the proof of financial responsibility, as well as the new DEP Form Part D appropriately completed and signed by an authorized representative of the insurance company, and the new DEP Form Part P completed by the owner/operator, must be submitted to the Department.
 
06/12/2018 4012 Minor 2.3 For an incident, notification not received in a timely manner. 1. An Incident Notification Form (INF) must be submitted for the fuel in dispenser liner #3/4. 2. An INF must be submitted for the cracked premium spill bucket. 3. An INF must be submitted for the complete loss of vacuum on the diesel tank interstitial vacuum gauge.
 
06/12/2018 4065 SNC-B 4.2 Storage tank release detection requirements not met. The diesel tank vacuum gauge must be tested, repaired, replaced, and/or refreshed or a different method of release detection used for the diesel tank. Submit repair and test records to the Department.
 
06/12/2018 4046 Minor 4.23 Fillbox covers not marked according to requirements. Paint the diesel fill cover with the proper color coding to meet API RP 1637 and submit a photo to the Department.
 
06/12/2018 4008 SNC-B 2.7 Motor fuel being deposited into storage tank at facility where valid registration placard is not displayed. A Storage Tank Registration Placard must be displayed at the facility. A copy of the current Placard must be submitted to the Department.
 
06/12/2018 4079 Minor 2.7 Records requiring 3 years documentation period not kept by facility. Copies of all records required at time of inspection must be submitted to the Department. Tank placard, Financial Responsibility, DEP CFR forms, Annual testing of release detection equipment, Annual Operability tests of Overfill Protection equipment, Annual Integrity tests of single-walled spill buckets, and monthly visual inspection records.
 
06/12/2018 4059 SNC-B 4.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days.) For electronically monitored sumps, visual inspections not conducted every 6 months. This violation may lead to Placard Revocation and Delivery Prohibition. All monthly visual release detection records from October 2015 must be submitted to the Department. The next two months of visual release detection records must be submitted to the Department as they are completed.
 
06/12/2018 4016 SNC-B 2.5 Incident investigation not initiated within 24-hours of discovery. 1. An investigation must be conducted and the results submitted for the fuel in dispenser liner #3/4. 2. An investigation must be conducted and the results submitted for the cracked premium spill bucket. 3. An investigation must be conducted and the results submitted for the complete loss of vacuum on the diesel tank interstitial vacuum gauge.
 
06/12/2018 4032 SNC-B 4.10 Storage tank system not installed according to reference guidelines. One of the overfill protection devices must be removed. Recommend removing the ball check valves. Contact the Department for re-inspection.
 
10/07/2015 2016 Minor 3.4 Dispensing systems do not meet standards. Either the liner must be replaced so that the equipment within the dispenser rests above the liner or the liner be upgraded so that any release of petroleum product is directed to the liner, and the Department contacted for re-inspection.
 
10/07/2015 1117 Minor 4.105 Release detection devices not tested annually. The test must be performed immediately with the test results submitted to the Department.
 
10/07/2015 1021 Minor 4.9 Failure to provide a monitoring point for secondary containment. Make sure that the piping is open to the diesel STP sump and contact the Department for re-inspection.
 
10/05/2015 1105 Minor 4.93 Not repaired component which has or could cause a discharge or release. Areas of leakage must be repaired and the Department contacted for re-inspection.
 
10/05/2015 1005 Minor 2.5 30 day notification before installation or upgrade not submitted. The Department should’ve been notified at least 30 days prior to the initiation of installation activity.
 
10/05/2015 1007 Minor 2.7 48-hour notification before installation/closure activity, change in service status, and tightness tests not submitted. The Department should’ve been notified at least 48 hours prior to the start of closure and installation activities.
 
10/05/2015 1103 Minor 4.91 UST line leak detector cannot detect a 3.0 gph discharge; not tested annually. The test must be performed immediately with the test results submitted to the Department.
 
10/05/2015 1027 Minor 4.15 Work not performed by a certified contractor. Documentation that all work was performed by a certified pollutant storage system contractor, including the submission of a completed Underground Storage Tank System Installation and Removal Form 62-761.900(5), must immediately be provided to the Department.
 
10/05/2015 1115 Minor 4.103 Spill containment, dispenser liners and piping sumps accessible; water and regulated substances not removed. PCW must be removed and the Department contacted for re-inspection.
 
10/05/2015 1006 Minor 2.6 10 day notification before UST internal inspection, change-in-service status, closure, or closure assessment not submitted. The Department should’ve been notified at least 10 days prior to the initiation of closure activity.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
10/28/1986   COMPLETED 66 EARLY DETECTION INCENTIVE-ELIGIBLE