Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8628711 | Latitude | 25° 57' 7.229 | ||||||||
Name |
STOP N SHOP #57 19501 NW 57TH AVE |
Longitude | 80° 17' 38.1536 | ||||||||
MIAMI, FL 33055-4709 | LL Method | DPHO | |||||||||
Contact | MIGUEL SHIHADEH | LL Status | REVIEWED | ||||||||
Phone | (954) 444-7103 | Status Date | 12/23/2016 | ||||||||
Account Owner Information | |||||||||||
Name | ORION GASOLINE CORP INC 19501 NW 57TH AVE MIAMI GARDENS, FL 33055 |
Effective Date | 06/07/2006 | ||||||||
Contact | MARWAN SHIHADEH | ||||||||||
Phone | (954) 444-7102 | ||||||||||
MIKE@GETITDOWNSTAIRS.COM | |||||||||||
Placard # / Date | 678398 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ORION GASOLINE CORP INC 19501 NW 57TH AVE MIAMI GARDENS, FL 33055 |
Effective Date | 06/07/2006 | ||||||||
Contact | MARWAN SHIHADEH | ||||||||||
Phone | (954) 444-7102 | ||||||||||
MIKE@GETITDOWNSTAIRS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 15000 | Ethanol E10 (8) | 10/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 15000 | Ethanol E85 (9) | 10/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 8000 | Vehicular Diesel (D) | 10/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 09/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 09/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 09/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system |
(H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/16/2023 | 05/16/2024 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 05/16/2021 | 05/16/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 05/16/2018 | 05/16/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 05/16/2017 | 05/16/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 05/16/2016 | 05/16/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/16/2015 | 05/16/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/16/2014 | 05/16/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/16/2012 | 05/16/2013 | LLOYDS OF LONDON | ||||||||
INSURANCE | 05/16/2010 | 05/16/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 05/16/2009 | 05/16/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 05/16/2008 | 05/16/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 04/04/2006 | 04/04/2006 | COMPLIANCE ASSURANCE | ||||||||
TCR | 02/06/2006 | 02/14/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/09/2005 | 12/15/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 04/27/2005 | 05/03/2005 | IN-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 03/09/2005 | 03/15/2005 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 01/11/2005 | 01/14/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 03/03/2004 | 03/15/2004 | IN-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/02/2003 | 12/09/2003 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 11/06/2002 | 11/12/2002 | IN-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/10/2002 | 10/28/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 3/0 | COMPLIANCE ASSURANCE | |||||
TCR | 11/29/2001 | 12/20/2001 | IN-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
TCI | 10/11/2001 | 10/18/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 11/21/2000 | 11/29/2000 | IN-COMPLIANCE | DASHTAKI, K | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 11/16/2000 | 11/20/2000 | DASHTAKI, K | 1/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/15/2000 | 11/20/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 03/09/2000 | 03/15/2000 | IN-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 02/23/2000 | 02/28/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 04/14/1999 | 05/19/1999 | IN-COMPLIANCE | RONDON, K | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Document Management | 04/29/2024 | Satisfied | RODRIGUEZ_F | Discharge | |||||||
Electronic Communication | 04/19/2024 | Satisfied | RODRIGUEZ_F | Discharge | |||||||
Letter | 03/15/2024 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Site Inspection | 03/15/2024 | Minor Out of Compliance | RODRIGUEZ_F | 0/3 | Routine Compliance | ||||||
Site Inspection | 03/15/2024 | Major Out of Compliance | RODRIGUEZ_F | 0/3 | Discharge | ||||||
Letter | 11/18/2021 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Site Inspection | 11/15/2021 | In Compliance | RODRIGUEZ_F | 0/3 | Routine Compliance | ||||||
Electronic Communication | 11/05/2021 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Site Inspection | 04/12/2019 | In Compliance | DEZAYAS_A_1 | 0/3 | Compliance Assistance | ||||||
Letter | 04/12/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Electronic Communication | 04/12/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Electronic Communication | 02/25/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 02/25/2019 | Major Out of Compliance | DEZAYAS_A_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/25/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Phone Conversation | 02/11/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 02/11/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
TCAR | 01/27/2017 | Satisfied | MAS_JR_1 | Closure | |||||||
Electronic Communication | 12/23/2016 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 11/18/2016 | In Compliance | DEZAYAS_A_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 11/04/2016 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Phone Conversation | 11/04/2016 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 05/24/2016 | In Compliance | LINCHETA_CR_1 | 0/3 | Installation | ||||||
Phone Conversation | 03/24/2016 | Satisfied | LINCHETA_CR_1 | Installation | |||||||
Electronic Communication | 12/17/2014 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 12/17/2014 | In Compliance | DEZAYAS_A_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/16/2014 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Phone Conversation | 12/09/2014 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 11/02/2012 | In Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Electronic Communication | 11/02/2012 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Letter | 10/15/2012 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 10/15/2012 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 10/15/2012 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 10/11/2012 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 01/19/2011 | In Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/19/2011 | Satisfied | DASHTAKI_K_1 | QA/QC | |||||||
Enforcement Tracking | 10/26/2010 | Closed With Enforcement | KONG_TE_1 | Enforcement | |||||||
Site Inspection | 04/16/2010 | In Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
TCAR | 01/15/2010 | Satisfied | MAS_JR_1 | Closure | |||||||
TCAR | 12/24/2009 | Satisfied | MAS_JR_1 | Closure | |||||||
Letter | 11/24/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 11/24/2009 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Enforcement Referral | 03/19/2009 | Accepted | KONG_TE_1 | Enforcement | |||||||
Issue Document | 03/19/2009 | Satisfied | KONG_TE_1 | Enforcement | |||||||
Site Inspection | 12/29/2008 | In Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Enforcement Tracking | 12/29/2008 | Closed Without Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 11/21/2008 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Issue Document | 11/21/2008 | Satisfied | DASHTAKI_K_1 | Enforcement | |||||||
Letter | 11/21/2008 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Enforcement Referral | 11/21/2008 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 12/24/2007 | In Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 12/05/2007 | Major Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/05/2007 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 12/03/2007 | In Compliance | DASHTAKI_K_1 | 0/2 | Installation | ||||||
Site Inspection | 10/31/2007 | In Compliance | DASHTAKI_K_1 | 0/3 | Installation | ||||||
Site Inspection | 10/12/2007 | In Compliance | DASHTAKI_K_1 | 0/3 | Installation | ||||||
Site Inspection | 10/09/2007 | In Compliance | DASHTAKI_K_1 | 0/3 | Closure | ||||||
Site Inspection | 02/20/2007 | In Compliance | DASHTAKI_K_1 | 0/3 | Non-Compliance | ||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Letter | 11/29/2006 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 11/29/2006 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/15/2024 | 6018 | SNC-B | 4.6 Discharge not reported within 24-hours, or by next business day. | Submit a DRF for the discharge observed in the monitoring well south of dispenser #23. | |||||||
03/15/2024 | 6020 | SNC-A | 4.9 Actions not taken immediately to contain, remove, and abate the discharge. | Provide a current and passing test for all of the underground storage tanks (USTs) onsite as follows: 1. Tank tightness test 2. Line tightness test for all primary and secondary product piping 3. Integrity test of the annular space of the USTs 4. Annual operability test of the release detection device 5. Annual operability test of the overfill protection devices 6. Annual operability of the mechanical line leak detectors 7. Integrity test of the STP sumps 8. Integrity test of dispenser liners 9. Integrity test of the fill port spill containment buckets | |||||||
03/15/2024 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Update the contents status of tanks to reflect current ethanol blend / fuel type. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
03/13/2024 | COMPLETED | ||||||||||
06/04/1996 | INACTIVE | 10 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
09/16/1988 | INACTIVE | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||