DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 03/19/2025        Last Data Refresh: 03/18/2025        Report Generated from DOPPLER
 
District Southeast   Type    County Government
 
County Miami-Dade   Status    OPEN
 
ID 8628763   Latitude    25° 48' 18.8019
 
Name DADE CNTY METROBUS CENTRAL #1
3300 NW 32ND AVE
Longitude    80° 15' 10.3827
  MIAMI, FL 33142-5729 LL Method    DPHO
 
Contact SATYEN THAKAR, P.E.   LL Status    REVIEWED
 
Phone (786) 469-5269   Status Date    12/04/2003
 
Account Owner Information
 
Name MIAMI DADE TRANSIT (MDT)
701 NW 1ST CT #1700
MIAMI, FL 33136-791
Effective Date    05/20/1994
 
Contact SATYEN THAKAR
 
Phone (786) 469-5269
 
Email SATYEN.THAKAR@MIAMIDADE.GOV
  Placard # / Date    698366 - 07/01/2024
Property Owner Information
 
Name MIAMI DADE TRANSIT (MDT)
701 NW 1ST CT #1700
MIAMI, FL 33136-791
Effective Date    03/18/2016
 
Contact SATYEN THAKAR
 
Phone (786) 469-5269
 
Email SATYEN.THAKAR@MIAMIDADE.GOV
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
37 500 Emerg Generator Diesel (G) 11/01/1994 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
38 15000 Vehicular Diesel (D) 05/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
39 15000 Vehicular Diesel (D) 05/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
40 6000 Unleaded Gas (B) 05/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
41 1549 Emerg Generator Diesel (G) 05/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
MO10 2000 Emerg Generator Diesel (G) 12/01/1994 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(I) Suction piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
MO11 2000 New/Lube Oil (O) 12/01/1994 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
MO12 2000 Misc Petrol-Based Product (X) 11/01/1994 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
OI7 5000 Misc Petrol-Based Product (X) 12/01/1994 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
OI8 5000 New/Lube Oil (O) 12/01/1994 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
OI9 500 Emerg Generator Diesel (G) 12/01/1994 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(B) Internal lining
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (B) Steel/galvanized metal
(J) Pressurized piping system
(L) Bulk product system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(M) Manual tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
10 10000 Waste Oil (L) 04/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
11 20000 Leaded Gas (A) 04/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (C) Fiberglass (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
12 20000 Vehicular Diesel (D) 04/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (C) Fiberglass (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
13 20000 Vehicular Diesel (D) 04/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (C) Fiberglass (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
14 20000 Vehicular Diesel (D) 04/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (C) Fiberglass (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
16 20000 Vehicular Diesel (D) 04/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (C) Fiberglass (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
18 1000 Vehicular Diesel (D) 11/01/1982 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
19 1000 Vehicular Diesel (D) 11/01/1982 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
2 1000 Waste Oil (L) 11/01/1982 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
24 1000 Vehicular Diesel (D) 11/01/1982 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(G) Sacrificial anode CP
  (E) Cathodic protection (D) SPCC Plan
 
 
Tank Tank Size Content Installed Placement Status
29 12000 Vehicular Diesel (D) 05/01/1995 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
3 1000 Waste Oil (L) 11/01/1982 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
30 12000 Vehicular Diesel (D) 05/01/1995 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
31 12000 Vehicular Diesel (D) 05/01/1995 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
32 12000 Vehicular Diesel (D) 05/01/1995 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
33 12000 Vehicular Diesel (D) 05/01/1995 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
34 10000 Unleaded Gas (B) 05/01/1995 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
35 5000 Misc Petrol-Based Product (X) 11/01/1994 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
36 5000 Misc Petrol-Based Product (X) 11/01/1994 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
4 1000 Waste Oil (L) 11/01/1982 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
5 20000 Unleaded Gas (B) 06/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
6 8000 New/Lube Oil (O) 06/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (C) Fiberglass (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
7 8000 New/Lube Oil (O) 06/01/1983 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (C) Fiberglass (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
FI1 12000 Vehicular Diesel (D) 06/01/1995 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
FI2 12000 Vehicular Diesel (D) 06/01/1995 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
FI3 12000 Vehicular Diesel (D) 06/01/1995 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
FI4 12000 Vehicular Diesel (D) 06/01/1995 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
FI5 12000 Vehicular Diesel (D) 06/01/1995 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
FI6 10000 Unleaded Gas (B) 06/01/1995 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(L) Compartmented
(N) Flow shut-Off
(O) Tight fill
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(F) Monitor dbl wall tank space
(G) Electronic line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
21 8000 Vehicular Diesel (D) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(D) Unknown   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
22 8000 Other Non Regulated (Z) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(D) Unknown   (Y) Unknown (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
28 8000 Waste Oil (L) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(D) Unknown   (Y) Unknown (D) SPCC Plan
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2024 01/31/2025
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2023 01/31/2024
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2022 01/31/2023
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2021 01/31/2022
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2020 01/31/2021
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2019 01/31/2020
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2017 01/31/2020
LOCAL GOVERNMENTS - BOND RATING TEST   05/05/2016 03/18/2017
LOCAL GOVERNMENTS - BOND RATING TEST   10/01/2013 09/30/2014
LOCAL GOVERNMENTS - BOND RATING TEST   02/05/2013 02/05/2014
LOCAL GOVERNMENTS - BOND RATING TEST   09/26/2011 09/26/2012
LOCAL GOVERNMENTS - BOND RATING TEST   02/03/2010 02/03/2011
LOCAL GOVERNMENTS - BOND RATING TEST   11/21/2006 11/20/2007
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 11/30/2004 01/21/2005 IN-COMPLIANCE LEFEBVRE_M 12/0 COMPLIANCE ASSURANCE
 
 Completion Notes MINOR CORROSION ON TOP OF ALL TANKS NOTED.
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Document Management 04/12/2024 Satisfied MAIB_R Discharge
 
Document Management 04/12/2024 Satisfied MAIB_R Discharge
 
Discharge Reporting 04/10/2024 Satisfied MAIB_R Discharge
 
Document Management 04/10/2024 Satisfied CHIRINO_AM_1 Discharge
 
Discharge Reporting 04/10/2024 Satisfied CHIRINO_AM_1 Discharge
 
Discharge Reporting 04/09/2024 Satisfied MAIB_R Discharge
 
Site Inspection 04/09/2024 Major Out of Compliance MAIB_R 9/0 Discharge
 
Site Inspection 04/09/2024 Major Out of Compliance MAIB_R 9/0 Discharge
 
Letter 09/18/2023 Satisfied BORGESPADRO_A Compliance Assistance
 
Letter 02/06/2023 Satisfied BORGESPADRO_A Routine Compliance
 
Enforcement Referral 02/06/2023 Accepted BORGESPADRO_A Enforcement
 
Site Inspection 01/30/2023 Major Out of Compliance BORGESPADRO_A 11/0 Routine Compliance
 
Site Inspection 01/24/2023 Major Out of Compliance BORGESPADRO_A 6/0 Closure
 
Letter 09/17/2021 Satisfied LANDFIELD_J Routine Compliance
 
Phone Conversation 09/15/2021 Satisfied WILLIAMS_CEW Routine Compliance
 
Electronic Communication 07/30/2021 Satisfied WILLIAMS_CEW Routine Compliance
 
Electronic Communication 04/06/2021 Satisfied WILLIAMS_CEW Installation
 
Letter 10/26/2020 Satisfied WILLIAMS_CEW Compliance Assistance
 
Site Inspection 09/03/2020 Major Out of Compliance WILLIAMS_CEW 3/0 Installation
 
Letter 12/17/2019 Satisfied MALONEY_D Compliance Assistance
 
Site Inspection 12/16/2019 Major Out of Compliance MALONEY_D 11/0 Routine Compliance
 
Record Document 01/05/2018 Satisfied MALONEY_D Compliance Assistance
 
Issue Document 11/14/2017 Satisfied MALONEY_D Compliance Assistance
 
Site Inspection 11/09/2017 In Compliance MALONEY_D 13/0 Compliance Assistance
 
Electronic Communication 11/09/2017 Satisfied MALONEY_D Compliance Assistance
 
Site Inspection 02/27/2017 Major Out of Compliance MALONEY_D 13/0 Routine Compliance
 
Site Inspection 01/27/2014 In Compliance WILLIAMS_CEW 11/0 Routine Compliance
 
Electronic Communication 06/25/2013 Satisfied BROWN_SE Non-Compliance
 
Electronic Communication 06/25/2013 Satisfied BROWN_SE Non-Compliance
 
Site Inspection 05/06/2013 Minor Out of Compliance BROWN_SE 11/0 Routine Compliance
 
Electronic Communication 05/01/2013 Satisfied BROWN_SE Routine Compliance
 
Electronic Communication 09/25/2012 Satisfied WILLIAMS_CEW Routine Compliance
 
Site Inspection 10/04/2011 Minor Out of Compliance WILLIAMS_CEW 11/0 Routine Compliance
 
Electronic Communication 07/21/2010 Satisfied BROWN_SE Non-Compliance
 
Letter 06/25/2010 Satisfied BROWN_SE Non-Compliance
 
Site Inspection 06/24/2010 Minor Out of Compliance BROWN_SE 11/0 Routine Compliance
 
Issue Document 04/25/2007 Satisfied WHITE_CM Routine Compliance
 
Site Inspection 04/20/2007 In Compliance WHITE_CM 13/0 Routine Compliance
 
Site Inspection 07/09/2006 In Compliance BARATH_J 21/18 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
01/17/2023 7072 Minor 1.8 Annual operability testing of release detection systems not completed. Provide missing Annual operability tests on the overfill protection methods for FDEP tanks FI1, FI2, FI3, FI4, FI5, FI6; for 2019 and 2020.
 
01/17/2023 7065 SNC-B 1.6 Storage tank system not visually inspected once a month. Provide Department with documentation of monthly monitoring for years 2019 and 2020 for FDEP tanks FI1, FI2, FI3, FI4, FI5, FI6.
 
01/17/2023 7094 Minor 1.13 Permanent records not available within 5 working days notice. Provide Department with records for FDEP Tanks FI1, FI2, FI3, FI4, FI5, FI6; specifically, since December 2019 up until removal.
 
01/17/2023 7002 Minor 1.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. Tanks are not considered closed until Tank Closure Assessment Report (TCAR) has been submitted and approved by Department for FDEP tanks FI1, FI2, FI3, FI4, FI5, FI6. Submit TCAR for review.
 
01/17/2023 7064 Minor 3.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. Provide Department with records of release detection test results for FDEP tanks FI1, FI2, FI3, FI4, FI5, FI6 within given timeframe.
 
01/17/2023 7041 Minor 1.10 Failure to designate, register, or annually test primary overfill protection device, Provide missing Annual operability tests on the overfill protection methods for FDEP tanks FI1, FI2, FI3, FI4, FI5, FI6; for 2019 and 2020.
 
01/17/2023 7095 Minor 1.14 Records requiring 3 year documentation period not kept by facility. Provide Department with records for FI1, FI2, FI3, FI4, FI5, FI6, include records on contractor(s) that cleaned and removed tanks.
 
01/17/2023 7096 Minor 1.15 Records not kept until closure of system. Provide Department with all records for FDEP tanks FI1, FI2, FI3, FI4, FI5, FI6; specifically, since December 2019 up until removal.
 
01/17/2023 7005 Minor 1.5 Notification of installation, closure, or change in service status not received in required timeframes. Provide documentation that Department was notified prior to tank removal for FDEP Tanks FI1, FI2, FI3, FI4, FI5, FI6.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
04/02/2024   INACTIVE ROBERTS_EA
 
03/29/2024   INACTIVE ROBERTS_EA
 
10/18/2017   INACTIVE ROBERTS_EA
 
04/19/1993   COMPLETED 13
 
06/22/1987   ACTIVE 11 EARLY DETECTION INCENTIVE-PARTIAL ROBERTS_EA
 
05/10/1984   COMPLETED 13 EARLY DETECTION INCENTIVE-PARTIAL