![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 8629141 | Latitude | 28° 2' .3111 | ||||||||
Name |
7-ELEVEN STORE #35052 851 S FLORIDA AVE |
Longitude | 81° 57' 27.0197 | ||||||||
LAKELAND, FL 33801 | LL Method | DPHO | |||||||||
Contact | DAVID PETERSEN | LL Status | REVIEWED | ||||||||
Phone | (407) 405-2995 | Status Date | 07/25/2023 | ||||||||
Account Owner Information | |||||||||||
Name | 7-ELEVEN INC. PO BOX 711 Dallas, TX 75221-711 |
Effective Date | 12/12/2012 | ||||||||
Contact | DAVID PETERSEN | MILEI AVILES | JENNIFER DART | ||||||||||
Phone | (407) 403-2995 | ||||||||||
DAVID.PETERSEN@7-11.COM | |||||||||||
Placard # / Date | 689941 - 06/18/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | 7-ELEVEN INC. PO BOX 711 Dallas, TX 75221-711 |
Effective Date | 04/22/2020 | ||||||||
Contact | DAVID PETERSEN | MILEI AVILES | JENNIFER DART | ||||||||||
Phone | (407) 403-2995 | ||||||||||
DAVID.PETERSEN@7-11.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 18000 | Unleaded Gas (B) | 12/01/1995 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (J) Pressurized piping system |
(8) Manually sampled wells (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (J) Pressurized piping system |
(8) Manually sampled wells (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 09/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (J) Pressurized piping system |
(8) Manually sampled wells (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Vehicular Diesel (D) | 09/01/1983 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal (J) Pressurized piping system |
(8) Manually sampled wells (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 550 | Waste Oil (L) | 07/01/1961 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 550 | New/Lube Oil (O) | 07/01/1961 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 550 | Kerosene (K) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (X) None | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 12/18/2022 | 12/18/2023 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/18/2021 | 12/18/2022 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/18/2020 | 12/18/2021 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/18/2019 | 12/18/2020 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/18/2018 | 12/18/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
GUARANTEE | 12/18/2015 | 12/18/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/18/2015 | 12/18/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/18/2015 | 12/18/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/18/2012 | 12/18/2013 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/18/2012 | 12/18/2013 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 09/14/2011 | 09/14/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/14/2010 | 09/14/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 11/25/2008 | 11/25/2009 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/13/1999 | 05/13/2000 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 09/21/2005 | 09/30/2005 | IN-COMPLIANCE | GONZALEZ_J | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. UNDERGROUND ENVIRON DW GEOFLEX 1PIPING - EQ-174. | |||||||||||
RRBD | 10/29/2004 | 11/04/2004 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED LINE LEAK DETECTOR TEST RESULTS. RESOLVES VIOLATION #142. | |||||||||||
RRBD | 10/13/2004 | 10/28/2004 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED COPY OF PLACARD. RESOLVES VIOLATION #2. | |||||||||||
NCLI | 08/26/2004 | 09/10/2004 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED: COPY OF REGISTRATION PLACARD, RESULTS FOR LINE LEAK DETECTOR TEST. | |||||||||||
TCI | 08/26/2004 | 09/10/2004 | MINOR OUT-OF-COMPLIANCE | NEWBERG_D | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: UNDERGROUND ENVIRON DOUBLE WALL GEOFLEX EQ-174. | |||||||||||
TCI | 01/15/2004 | 02/06/2004 | IN-COMPLIANCE | CROWELL_M | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: UNDERGROUND ENVIRON DW GEOFLEX 1PIPING - EQ-174 | |||||||||||
TCR | 06/04/2003 | 06/16/2003 | IN-COMPLIANCE | NEWBERG_D | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes RESOLVES VIOLATION #144 | |||||||||||
RRBD | 05/27/2003 | 05/28/2003 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #87. | |||||||||||
NCLI | 03/31/2003 | 04/02/2003 | NEWBERG_D | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #9. | |||||||||||
TCI | 03/20/2003 | 04/02/2003 | MINOR OUT-OF-COMPLIANCE | NEWBERG_D | 0/1 | COMPLIANCE ASSURANCE | |||||
RRBD | 04/22/2002 | 05/10/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
CALL | 03/15/2002 | 03/19/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SHAWN DEMINA. TOLD HIM HE NEEDED AN ANNUAL OPERABILITY TEST ON THE LINE LEAK DETECTORS AND THE VEEDER-ROOT SYSTEM. ASKED ABOUT TANK #7. THERE IS SOME CONFUSION AS TO THE CONTENT AND PLACEMENT OF THE TANK. SAID HE WOULD CALL BACK WITH THE INFORMATION. | |||||||||||
TCI | 03/15/2002 | 03/19/2002 | MINOR OUT-OF-COMPLIANCE | HAUSCHILD_T | 0/1 | COMPLIANCE ASSURANCE | |||||
CALL | 03/07/2002 | 03/19/2002 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SHAWN. SCHEDULE INSPECTION. | |||||||||||
FR | 03/15/2001 | 03/21/2001 | MURRAY | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 03/15/2001 | 03/21/2001 | MURRAY | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 02/26/2001 | 02/28/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 02/22/2001 | 02/28/2001 | MINOR OUT-OF-COMPLIANCE | MURRAY | 0/1 | COMPLIANCE ASSURANCE | |||||
CRDE | 08/02/2000 | 08/07/2000 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 07/21/2000 | 07/27/2000 | MURRAY_K | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 05/04/2000 | 05/08/2000 | COOK_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/02/2000 | 05/08/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | MURRAY_K | 0/1 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 07/25/2023 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 07/25/2023 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Letter | 07/25/2023 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Electronic Communication | 07/24/2023 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 07/24/2023 | Major Out of Compliance | GLENN_LE_1 | 0/1 | Routine Compliance | ||||||
Document Management | 07/24/2023 | Satisfied | GLENN_LE_1 | Incident | |||||||
Incident | 07/24/2023 | Has not led to Discharge | GLENN_LE_1 | Incident | |||||||
Electronic Communication | 07/24/2023 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 06/07/2020 | Major Out of Compliance | JARRETT_SE_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 06/07/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 06/07/2020 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Letter | 06/07/2020 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Electronic Communication | 05/03/2018 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Letter | 05/03/2018 | Satisfied | GLENN_LE_1 | Routine Compliance | |||||||
Electronic Communication | 05/03/2018 | Satisfied | GLENN_LE_1 | Compliance Assistance | |||||||
Site Inspection | 05/02/2018 | In Compliance | GLENN_LE_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 04/04/2016 | Satisfied | MERRYMAN_DT_1 | Routine Compliance | |||||||
Site Inspection | 04/04/2016 | In Compliance | MERRYMAN_DT_1 | 0/1 | Routine Compliance | ||||||
Record Document | 10/17/2013 | Satisfied | WINN_JP_1 | Routine Compliance | |||||||
Site Inspection | 10/17/2013 | In Compliance | WINN_JP_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 10/17/2013 | Satisfied | WINN_JP_1 | Routine Compliance | |||||||
Electronic Communication | 01/04/2013 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Electronic Communication | 01/04/2013 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Letter | 01/03/2013 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 01/03/2013 | Minor Out of Compliance | WINN_JP_1 | 1/1 | Installation | ||||||
Electronic Communication | 01/02/2013 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Letter | 12/12/2012 | Satisfied | WINN_JP_1 | Non-Compliance | |||||||
Site Inspection | 12/12/2012 | Major Out of Compliance | WINN_JP_1 | 1/1 | Closure | ||||||
Site Inspection | 02/23/2012 | In Compliance | NEWBERG_DR_1 | 0/1 | Routine Compliance | ||||||
Record Document | 07/15/2011 | Satisfied | BROCK_L | Enforcement | |||||||
Enforcement Tracking | 07/15/2011 | Closed Without Enforcement | BROCK_L | Enforcement | |||||||
Site Inspection | 07/05/2011 | In Compliance | DERY_WC_1 | 0/1 | Non-Compliance | ||||||
Issue Document | 07/05/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 06/21/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 06/15/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 06/13/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Record Document | 05/09/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Record Document | 05/09/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Record Document | 04/28/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 04/28/2011 | Major Out of Compliance | DERY_WC_1 | 0/1 | Non-Compliance | ||||||
Letter | 04/28/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 04/08/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Record Document | 04/08/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Enforcement Referral | 04/01/2011 | Accepted | BROCK_L | Enforcement | |||||||
Record Document | 03/29/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Electronic Communication | 02/23/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Record Document | 02/23/2011 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 12/20/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 12/20/2010 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Meeting | 12/20/2010 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Phone Conversation | 12/20/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 12/20/2010 | Major Out of Compliance | DERY_WC_1 | 0/1 | Routine Compliance | ||||||
Letter | 12/20/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 12/20/2010 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Meeting | 11/19/2009 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Meeting | 10/02/2009 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 10/02/2009 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 09/03/2009 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Letter | 07/17/2009 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 07/15/2009 | Minor Out of Compliance | DERY_WC_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 07/06/2009 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Site Inspection | 08/26/2008 | In Compliance | DERY_WC_1 | 0/1 | Routine Compliance | ||||||
Record Document | 08/26/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 07/30/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Issue Document | 07/29/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 07/16/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Record Document | 07/16/2008 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Record Document | 07/16/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 06/04/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 06/04/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Site Inspection | 04/22/2008 | Major Out of Compliance | DERY_WC_1 | 0/1 | Routine Compliance | ||||||
Letter | 04/22/2008 | Satisfied | DERY_WC_1 | Non-Compliance | |||||||
Phone Conversation | 04/02/2008 | Satisfied | DERY_WC_1 | Routine Compliance | |||||||
Letter | 05/25/2007 | Satisfied | SLAPPEY_WR_1 | Non-Compliance | |||||||
Site Inspection | 04/26/2007 | Minor Out of Compliance | SLAPPEY_WR_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/27/2006 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
07/24/2023 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Alarm history records for the 04/16/2020 to 02/16/2023 time period or the next two months (August & September) of records must be provided to the Department. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/20/1988 | INACTIVE | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||