DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Northeast   Type    Fuel user/Non-retail
 
County Duval   Status    OPEN
 
ID 8629573   Latitude    30° 19' 32.815
 
Name ARLINGTON TOYOTA
10939 ATLANTIC BLVD
Longitude    81° 33' 50.1631
  JACKSONVILLE, FL 32255 LL Method    DPHO
 
Contact JOSEPH STRAMAGLIA   LL Status    REVIEWED
 
Phone (904) 776-3347   Status Date    01/13/2004
 
Account Owner Information
 
Name ARLINGTON TOYOTA
10939 ATLANTIC BLVD
JACKSONVILLE, FL 32255
Effective Date    12/02/1986
 
Contact JOSEPH STRAMAGLIA
 
Phone (904) 776-3347
 
Email JSTRAMAGLIA@ARLINGTONTOYOTA.COM
  Placard # / Date    685385 - 06/07/2024
Property Owner Information
 
Name ARLINGTON REALTY LLC
6200 SAN JOSE BV
JACKSONVILLE, FL 32217-2335
Effective Date    10/19/2015
 
Contact
 
Phone
 
Email
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
10 1000 New/Lube Oil (O) 11/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
(Z) DEP approved monitoring
 
 
Tank Tank Size Content Installed Placement Status
11 1000 Used Oil (J) 11/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
(Z) DEP approved monitoring
 
 
Tank Tank Size Content Installed Placement Status
12 1000 Used Oil (J) 11/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
(Z) DEP approved monitoring
 
 
Tank Tank Size Content Installed Placement Status
4 650 New/Lube Oil (O) 01/01/1999 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) SPCC Plan
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
6 650 Waste Oil (L) 06/01/2015 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
7 600 New/Lube Oil (O) 08/01/2015 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
8 1000 New/Lube Oil (O) 11/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
(Z) DEP approved monitoring
 
 
Tank Tank Size Content Installed Placement Status
9 1000 New/Lube Oil (O) 11/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
(S) DEP approved containment
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(I) Suction piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
(R) Monitor tank bottom space
(Z) DEP approved monitoring
 
 
Tank Tank Size Content Installed Placement Status
3 650 Waste Oil (L) 01/01/1999 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) SPCC Plan
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
5 600 New/Lube Oil (O) 01/01/1999 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(D) SPCC Plan
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
1 888 Leaded Gas (A) UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(D) Unknown   (B) Steel/galvanized metal (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
2 888 Leaded Gas (A) UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(D) Unknown   (B) Steel/galvanized metal (Y) Unknown
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
NONE  
INSURANCE   04/01/2024 04/01/2025 NAUTILUS INSURANCE COMPANY
INSURANCE   04/01/2023 04/01/2024 NAUTILUS INSURANCE COMPANY
INSURANCE   04/01/2020 04/01/2021 NAUTILUS INSURANCE COMPANY
INSURANCE   04/01/2019 04/01/2020 NAUTILUS INSURANCE COMPANY
INSURANCE   04/01/2018 04/01/2019 NAUTILUS INSURANCE COMPANY
INSURANCE   04/01/2017 04/01/2018 NAUTILUS INSURANCE COMPANY
INSURANCE   04/01/2016 04/01/2017 NAUTILUS INSURANCE COMPANY
INSURANCE   04/01/2015 04/01/2016 NAUTILUS INSURANCE COMPANY
INSURANCE   04/01/2014 04/01/2015 NAUTILUS INSURANCE COMPANY
 
 
No Legacy Data Found
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Enforcement Referral 03/18/2025 Accepted AMES_J Enforcement
 
Electronic Communication 02/18/2025 Satisfied AMES_J Compliance Assistance
 
Electronic Communication 01/17/2025 Satisfied AMES_J Compliance Assistance
 
Electronic Communication 01/17/2025 Satisfied AMES_J Compliance Assistance
 
Electronic Communication 01/06/2025 Satisfied AMES_J Compliance Assistance
 
Letter 12/13/2024 Satisfied AMES_J Compliance Assistance
 
Electronic Communication 12/13/2024 Satisfied AMES_J Compliance Assistance
 
Letter 12/12/2024 Satisfied AMES_J Compliance Assistance
 
Site Inspection 12/12/2024 Major Out of Compliance WESTERMAN_ML_1 8/0 Routine Compliance
 
Electronic Communication 12/12/2024 Satisfied AMES_J Compliance Assistance
 
Enforcement Referral 12/12/2024 Rejected AMES_J Enforcement
 
Phone Conversation 12/12/2024 Satisfied AMES_J Compliance Assistance
 
Enforcement Referral 11/30/2021 Accepted COLE_K Enforcement
 
Enforcement Tracking 11/30/2021 Closed Without Enforcement COLE_K Enforcement
 
Enforcement Tracking 08/13/2021 Closed Without Enforcement OLIVA_L Enforcement
 
Letter 02/10/2021 Satisfied AUSTIN_JH_1 Compliance Assistance
 
Site Inspection 01/29/2021 Major Out of Compliance AUSTIN_JH_1 8/0 Routine Compliance
 
Letter 01/29/2021 Satisfied AUSTIN_JH_1 Compliance Assistance
 
Letter 01/28/2021 Satisfied GREGORY_HM_1 Compliance Assistance
 
Electronic Communication 01/28/2021 Satisfied AUSTIN_JH_1 Routine Compliance
 
Site Inspection 01/28/2021 Major Out of Compliance GREGORY_HM_1 8/0 Installation
 
Electronic Communication 01/07/2021 Satisfied GREGORY_HM_1 Compliance Assistance
 
Incident 01/07/2021 Has not led to Discharge OLIVA_L Incident
 
Letter 03/28/2019 Satisfied OLIVA_L Enforcement
 
Enforcement Referral 05/25/2018 Accepted RICHARDS_JE_1 Enforcement
 
Document Management 02/13/2018 Satisfied GREGORY_HM_1 Incident
 
Site Inspection 02/13/2018 Major Out of Compliance GREGORY_HM_1 3/0 Routine Compliance
 
Letter 02/13/2018 Satisfied GREGORY_HM_1 Compliance Assistance
 
Electronic Communication 02/05/2018 Satisfied GREGORY_HM_1 Routine Compliance
 
Site Inspection 05/25/2016 In Compliance LUNN_RJ_1 1/0 Non-Compliance
 
Electronic Communication 05/18/2016 Satisfied LUNN_RJ_1 Non-Compliance
 
Letter 01/22/2016 Satisfied RICHARDS_JE_1 Non-Compliance
 
Letter 10/22/2015 Satisfied LUNN_RJ_1 Non-Compliance
 
Letter 10/22/2015 Satisfied LUNN_RJ_1 Non-Compliance
 
Electronic Communication 10/19/2015 Satisfied LUNN_RJ_1 Closure
 
Electronic Communication 10/19/2015 Satisfied LUNN_RJ_1 Installation
 
Electronic Communication 10/19/2015 Satisfied LUNN_RJ_1 Non-Compliance
 
Site Inspection 10/16/2015 Minor Out of Compliance LUNN_RJ_1 1/0 Installation
 
Site Inspection 10/15/2015 In Compliance LUNN_RJ_1 3/0 Non-Compliance
 
Site Inspection 10/15/2015 Minor Out of Compliance LUNN_RJ_1 1/0 Closure
 
Letter 07/24/2015 Satisfied RICHARDS_JE_1 Non-Compliance
 
Site Inspection 07/16/2015 Minor Out of Compliance LUNN_RJ_1 3/0 Closure
 
Electronic Communication 07/16/2015 Satisfied LUNN_RJ_1 Installation
 
Site Inspection 07/16/2015 Minor Out of Compliance LUNN_RJ_1 1/0 Installation
 
Electronic Communication 07/16/2015 Satisfied LUNN_RJ_1 Closure
 
Site Inspection 07/08/2015 Minor Out of Compliance LUNN_RJ_1 3/0 Non-Compliance
 
Electronic Communication 07/08/2015 Satisfied LUNN_RJ_1 Non-Compliance
 
Letter 05/07/2015 Satisfied LUNN_RJ_1 Non-Compliance
 
Electronic Communication 05/01/2015 Satisfied LUNN_RJ_1 Routine Compliance
 
Site Inspection 05/01/2015 Minor Out of Compliance LUNN_RJ_1 3/0 Routine Compliance
 
Electronic Communication 12/03/2014 Satisfied LUNN_RJ_1 Non-Compliance
 
Enforcement Tracking 11/25/2014 Closed Without Enforcement TOWLE_M Enforcement
 
Phone Conversation 11/25/2014 Satisfied TOWLE_M Enforcement
 
Site Inspection 11/25/2014 In Compliance LUNN_RJ_1 3/0 Non-Compliance
 
Letter 11/25/2014 Satisfied TOWLE_M Enforcement
 
Enforcement Referral 11/18/2014 Accepted TOWLE_M Enforcement
 
Electronic Communication 11/07/2014 Satisfied LUNN_RJ_1 Non-Compliance
 
Letter 11/06/2014 Satisfied HILL_KL_1 Non-Compliance
 
Letter 09/19/2014 Satisfied RICHARDS_JE_1 Non-Compliance
 
Letter 08/18/2014 Satisfied LUNN_RJ_1 Non-Compliance
 
Electronic Communication 08/15/2014 Satisfied LUNN_RJ_1 Installation
 
Site Inspection 08/15/2014 Major Out of Compliance LUNN_RJ_1 3/0 Installation
 
Issue Document 03/30/2012 Satisfied TOWLE_M Closure
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
12/11/2024 7072 Minor 1.8 Annual operability testing of release detection systems not completed. Provide annual operability testing of the release detection devices for tanks 8-12 from 2022-2024.
 
12/11/2024 7041 Minor 1.10 Failure to designate, register, or annually test primary overfill protection device, Provide annual overfill operability testing for all tanks for the years 2022-2024.
 
 
 
No Discharges Found