![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Fuel user/Non-retail | ||||||||
County | Duval | Status | OPEN | ||||||||
ID | 8629573 | Latitude | 30° 19' 32.815 | ||||||||
Name |
ARLINGTON TOYOTA 10939 ATLANTIC BLVD |
Longitude | 81° 33' 50.1631 | ||||||||
JACKSONVILLE, FL 32255 | LL Method | DPHO | |||||||||
Contact | JOSEPH STRAMAGLIA | LL Status | REVIEWED | ||||||||
Phone | (904) 776-3347 | Status Date | 01/13/2004 | ||||||||
Account Owner Information | |||||||||||
Name | ARLINGTON TOYOTA 10939 ATLANTIC BLVD JACKSONVILLE, FL 32255 |
Effective Date | 12/02/1986 | ||||||||
Contact | JOSEPH STRAMAGLIA | ||||||||||
Phone | (904) 776-3347 | ||||||||||
JSTRAMAGLIA@ARLINGTONTOYOTA.COM | |||||||||||
Placard # / Date | 685385 - 06/07/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ARLINGTON REALTY LLC 6200 SAN JOSE BV JACKSONVILLE, FL 32217-2335 |
Effective Date | 10/19/2015 | ||||||||
Contact | |||||||||||
Phone | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 1000 | New/Lube Oil (O) | 11/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 1000 | Used Oil (J) | 11/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 1000 | Used Oil (J) | 11/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 650 | New/Lube Oil (O) | 01/01/1999 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 650 | Waste Oil (L) | 06/01/2015 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 600 | New/Lube Oil (O) | 08/01/2015 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(I) Double wall (M) Spill containment bucket (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 1000 | New/Lube Oil (O) | 11/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 1000 | New/Lube Oil (O) | 11/01/2020 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms (S) DEP approved containment |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs (R) Monitor tank bottom space (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 650 | Waste Oil (L) | 01/01/1999 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 600 | New/Lube Oil (O) | 01/01/1999 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 888 | Leaded Gas (A) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 888 | Leaded Gas (A) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (B) Steel/galvanized metal | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
INSURANCE | 04/01/2024 | 04/01/2025 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2023 | 04/01/2024 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2020 | 04/01/2021 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2019 | 04/01/2020 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2018 | 04/01/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2017 | 04/01/2018 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2016 | 04/01/2017 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2015 | 04/01/2016 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2014 | 04/01/2015 | NAUTILUS INSURANCE COMPANY | ||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 03/18/2025 | Accepted | AMES_J | Enforcement | |||||||
Electronic Communication | 02/18/2025 | Satisfied | AMES_J | Compliance Assistance | |||||||
Electronic Communication | 01/17/2025 | Satisfied | AMES_J | Compliance Assistance | |||||||
Electronic Communication | 01/17/2025 | Satisfied | AMES_J | Compliance Assistance | |||||||
Electronic Communication | 01/06/2025 | Satisfied | AMES_J | Compliance Assistance | |||||||
Letter | 12/13/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Electronic Communication | 12/13/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Letter | 12/12/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Site Inspection | 12/12/2024 | Major Out of Compliance | WESTERMAN_ML_1 | 8/0 | Routine Compliance | ||||||
Electronic Communication | 12/12/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Enforcement Referral | 12/12/2024 | Rejected | AMES_J | Enforcement | |||||||
Phone Conversation | 12/12/2024 | Satisfied | AMES_J | Compliance Assistance | |||||||
Enforcement Referral | 11/30/2021 | Accepted | COLE_K | Enforcement | |||||||
Enforcement Tracking | 11/30/2021 | Closed Without Enforcement | COLE_K | Enforcement | |||||||
Enforcement Tracking | 08/13/2021 | Closed Without Enforcement | OLIVA_L | Enforcement | |||||||
Letter | 02/10/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Site Inspection | 01/29/2021 | Major Out of Compliance | AUSTIN_JH_1 | 8/0 | Routine Compliance | ||||||
Letter | 01/29/2021 | Satisfied | AUSTIN_JH_1 | Compliance Assistance | |||||||
Letter | 01/28/2021 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Electronic Communication | 01/28/2021 | Satisfied | AUSTIN_JH_1 | Routine Compliance | |||||||
Site Inspection | 01/28/2021 | Major Out of Compliance | GREGORY_HM_1 | 8/0 | Installation | ||||||
Electronic Communication | 01/07/2021 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Incident | 01/07/2021 | Has not led to Discharge | OLIVA_L | Incident | |||||||
Letter | 03/28/2019 | Satisfied | OLIVA_L | Enforcement | |||||||
Enforcement Referral | 05/25/2018 | Accepted | RICHARDS_JE_1 | Enforcement | |||||||
Document Management | 02/13/2018 | Satisfied | GREGORY_HM_1 | Incident | |||||||
Site Inspection | 02/13/2018 | Major Out of Compliance | GREGORY_HM_1 | 3/0 | Routine Compliance | ||||||
Letter | 02/13/2018 | Satisfied | GREGORY_HM_1 | Compliance Assistance | |||||||
Electronic Communication | 02/05/2018 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Site Inspection | 05/25/2016 | In Compliance | LUNN_RJ_1 | 1/0 | Non-Compliance | ||||||
Electronic Communication | 05/18/2016 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Letter | 01/22/2016 | Satisfied | RICHARDS_JE_1 | Non-Compliance | |||||||
Letter | 10/22/2015 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Letter | 10/22/2015 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Electronic Communication | 10/19/2015 | Satisfied | LUNN_RJ_1 | Closure | |||||||
Electronic Communication | 10/19/2015 | Satisfied | LUNN_RJ_1 | Installation | |||||||
Electronic Communication | 10/19/2015 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Site Inspection | 10/16/2015 | Minor Out of Compliance | LUNN_RJ_1 | 1/0 | Installation | ||||||
Site Inspection | 10/15/2015 | In Compliance | LUNN_RJ_1 | 3/0 | Non-Compliance | ||||||
Site Inspection | 10/15/2015 | Minor Out of Compliance | LUNN_RJ_1 | 1/0 | Closure | ||||||
Letter | 07/24/2015 | Satisfied | RICHARDS_JE_1 | Non-Compliance | |||||||
Site Inspection | 07/16/2015 | Minor Out of Compliance | LUNN_RJ_1 | 3/0 | Closure | ||||||
Electronic Communication | 07/16/2015 | Satisfied | LUNN_RJ_1 | Installation | |||||||
Site Inspection | 07/16/2015 | Minor Out of Compliance | LUNN_RJ_1 | 1/0 | Installation | ||||||
Electronic Communication | 07/16/2015 | Satisfied | LUNN_RJ_1 | Closure | |||||||
Site Inspection | 07/08/2015 | Minor Out of Compliance | LUNN_RJ_1 | 3/0 | Non-Compliance | ||||||
Electronic Communication | 07/08/2015 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Letter | 05/07/2015 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Electronic Communication | 05/01/2015 | Satisfied | LUNN_RJ_1 | Routine Compliance | |||||||
Site Inspection | 05/01/2015 | Minor Out of Compliance | LUNN_RJ_1 | 3/0 | Routine Compliance | ||||||
Electronic Communication | 12/03/2014 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Enforcement Tracking | 11/25/2014 | Closed Without Enforcement | TOWLE_M | Enforcement | |||||||
Phone Conversation | 11/25/2014 | Satisfied | TOWLE_M | Enforcement | |||||||
Site Inspection | 11/25/2014 | In Compliance | LUNN_RJ_1 | 3/0 | Non-Compliance | ||||||
Letter | 11/25/2014 | Satisfied | TOWLE_M | Enforcement | |||||||
Enforcement Referral | 11/18/2014 | Accepted | TOWLE_M | Enforcement | |||||||
Electronic Communication | 11/07/2014 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Letter | 11/06/2014 | Satisfied | HILL_KL_1 | Non-Compliance | |||||||
Letter | 09/19/2014 | Satisfied | RICHARDS_JE_1 | Non-Compliance | |||||||
Letter | 08/18/2014 | Satisfied | LUNN_RJ_1 | Non-Compliance | |||||||
Electronic Communication | 08/15/2014 | Satisfied | LUNN_RJ_1 | Installation | |||||||
Site Inspection | 08/15/2014 | Major Out of Compliance | LUNN_RJ_1 | 3/0 | Installation | ||||||
Issue Document | 03/30/2012 | Satisfied | TOWLE_M | Closure | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/11/2024 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Provide annual operability testing of the release detection devices for tanks 8-12 from 2022-2024. | |||||||
12/11/2024 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Provide annual overfill operability testing for all tanks for the years 2022-2024. | |||||||
No Discharges Found |