![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pasco | Status | OPEN | ||||||||
ID | 8630225 | Latitude | 28° 17' 36.0926 | ||||||||
Name |
EMBASSY FOOD & GAS - GRAB N GO 6618 EMBASSY BLVD |
Longitude | 82° 42' 17.2268 | ||||||||
PORT RICHEY, FL 34668-4736 | LL Method | DPHO | |||||||||
Contact | akbar a barmanwalla | LL Status | REVIEWED | ||||||||
Phone | (727) 642-4847 | Status Date | 05/30/2024 | ||||||||
Account Owner Information | |||||||||||
Name | AABAAD CORP 6618 EMBASSY BLVD NEW PORT RICHEY, FL 34668 |
Effective Date | 04/08/2024 | ||||||||
Contact | AKBAR BARMANWALLA | ||||||||||
Phone | (727) 646-4847 | ||||||||||
AKBARBARMANWALLA@YAHOO.COM | |||||||||||
Placard # / Date | 698238 - 07/01/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | AABAAD CORP 6618 EMBASSY BLVD NEW PORT RICHEY, FL 34668 |
Effective Date | 04/08/2024 | ||||||||
Contact | AKBAR BARMANWALLA | ||||||||||
Phone | (727) 646-4847 | ||||||||||
AKBARBARMANWALLA@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 12000 | Unleaded Gas (B) | 07/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 8000 | Unleaded Gas (B) | 07/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Unleaded Gas (B) | 04/01/1986 | UNDERGROUND | Deleted - Data Error (D) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel |
(C) Fiberglass | (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 04/01/1986 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 04/01/1986 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 6000 | Unleaded Gas (B) | 04/01/1986 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 07/29/2022 | 07/29/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/29/2021 | 07/29/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/29/2020 | 07/29/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/29/2019 | 07/29/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/29/2018 | 07/29/2019 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/29/2017 | 07/29/2018 | ACE | ||||||||
INSURANCE | 07/28/2017 | 07/28/2017 | ACE | ||||||||
INSURANCE | 07/28/2016 | 07/28/2017 | ACE | ||||||||
INSURANCE | 11/01/2013 | 11/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2012 | 11/01/2013 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2011 | 11/01/2012 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/01/2010 | 11/01/2011 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2009 | 11/01/2010 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2008 | 11/01/2009 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
NCLI | 04/19/2006 | 04/19/2006 | CONDOLEON, G J | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/18/2006 | 04/19/2006 | MINOR OUT-OF-COMPLIANCE | CONDOLEON, G J | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/15/2005 | 03/28/2005 | IN-COMPLIANCE | RODRIGUEZ, IVAN | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/19/2004 | 04/05/2004 | RODRIGUEZ, IVAN | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/17/2004 | 02/19/2004 | MINOR OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 05/16/2003 | 05/21/2003 | IN-COMPLIANCE | HANSEN,DAVID | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/12/2003 | 03/19/2003 | MINOR OUT-OF-COMPLIANCE | HANSEN, DAVID | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/26/2002 | 03/29/2002 | IN-COMPLIANCE | HANSEN, DAVID | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 05/16/2001 | 05/17/2001 | IN-COMPLIANCE | HANSEN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/21/1999 | 12/22/1999 | IN-COMPLIANCE | HARRIS | 0/3 | COMPLIANCE ASSURANCE | |||||
CWOE | 05/27/1999 | 05/27/1999 | PETERSON_JE | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/13/1999 | 04/20/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | PETERSON_JE | 0/4 | COMPLIANCE ASSURANCE | |||||
NCLI | 04/13/1999 | 04/20/1999 | PETERSON_JE | 0/4 | COMPLIANCE ASSURANCE | ||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Document Management | 02/14/2025 | Satisfied | WIMBERLY_E | Enforcement | |||||||
Enforcement Tracking | 02/14/2025 | Closed Without Enforcement | GREEN_SM | Enforcement | |||||||
Enforcement Referral | 02/04/2025 | Accepted | MUSLIC_A_1 | Enforcement | |||||||
Letter | 05/07/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Site Inspection | 05/07/2024 | Major Out of Compliance | MUSLIC_A_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 03/04/2024 | Satisfied | MUSLIC_A_1 | Routine Compliance | |||||||
Letter | 10/20/2022 | Satisfied | GREEN_SM | Enforcement | |||||||
Record Document | 10/07/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Enforcement Referral | 10/05/2022 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Phone Conversation | 09/07/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Phone Conversation | 09/07/2022 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 09/07/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 09/06/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 06/03/2022 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Meeting | 05/31/2022 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Site Inspection | 05/31/2022 | Major Out of Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 04/27/2022 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Record Document | 06/24/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 06/24/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Phone Conversation | 06/02/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 05/11/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 05/01/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 05/01/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 04/06/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 04/06/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 02/14/2020 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 02/11/2020 | Minor Out of Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/08/2020 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 07/31/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Enforcement Tracking | 07/31/2018 | Closed Without Enforcement | BROWNLEE_S | Enforcement | |||||||
Letter | 07/31/2018 | Satisfied | BROWNLEE_S | Routine Compliance | |||||||
Phone Conversation | 06/29/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Phone Conversation | 05/16/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Phone Conversation | 03/09/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Phone Conversation | 02/23/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Electronic Communication | 12/26/2017 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 11/30/2017 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Enforcement Referral | 11/21/2017 | Accepted | JUARISTIC_GK_1 | Enforcement | |||||||
Electronic Communication | 11/14/2017 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Phone Conversation | 11/14/2017 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 10/17/2017 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 08/14/2017 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Phone Conversation | 08/14/2017 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Site Inspection | 08/14/2017 | Major Out of Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/11/2017 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 07/07/2017 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 07/17/2015 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Site Inspection | 07/17/2015 | In Compliance | JUARISTIC_GK_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/14/2013 | In Compliance | LONGEN_JL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 06/14/2013 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Electronic Communication | 06/14/2013 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Site Inspection | 04/13/2012 | In Compliance | CONDOLEON_GJ_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/10/2012 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Site Inspection | 02/24/2011 | In Compliance | CONDOLEON_GJ_1 | 0/2 | Closure | ||||||
Site Inspection | 02/24/2011 | In Compliance | CONDOLEON_GJ_1 | 0/2 | Installation | ||||||
Site Inspection | 02/04/2011 | Minor Out of Compliance | CONDOLEON_GJ_1 | 0/2 | Routine Compliance | ||||||
Letter | 02/04/2011 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/03/2011 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/03/2011 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/10/2010 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Site Inspection | 02/10/2010 | In Compliance | CONDOLEON_GJ_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 02/18/2009 | In Compliance | CONDOLEON_GJ_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/18/2009 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Record Document | 08/12/2008 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Letter | 08/11/2008 | Satisfied | CONDOLEON_GJ_1 | Closure | |||||||
TCAR | 08/11/2008 | Satisfied | CONDOLEON_GJ_1 | Closure | |||||||
TCAR | 07/25/2008 | Incomplete | CONDOLEON_GJ_1 | Closure | |||||||
Record Document | 07/16/2008 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 07/09/2008 | Major Out of Compliance | CONDOLEON_GJ_1 | 0/2 | Installation | ||||||
Letter | 07/09/2008 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 06/25/2008 | In Compliance | CONDOLEON_GJ_1 | 0/3 | Closure | ||||||
Site Inspection | 02/13/2008 | In Compliance | CONDOLEON_GJ_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/22/2007 | In Compliance | CONDOLEON_GJ_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | CONDOLEON_GJ_1 | Routine Compliance | |||||||
Record Document | 06/19/2006 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/07/2024 | 6002 | Minor | 2.1 Operator Training records not available. | Submit UST operator Class A, B, and C certificates for the facility. | |||||||
05/07/2024 | 6043 | Minor | 4.13 Fillbox covers not marked according to requirements. | Repaint the fillbox covers and submit photo documentation to this office. | |||||||
05/07/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Integrity testing of single-walled spill buckets must be performed annually at intervals not exceeding every 12 months. | |||||||
05/07/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Perform annual operability testing on all release detection devices at intervals not exceeding 12 months. | |||||||
05/07/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Perform annual operability test on the designated primary overfill protection device at intervals not exceeding 12 months. | |||||||
05/07/2024 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | Submit Part P financial responsibility documentation for period from 7/29/2022 to 7/29/2024 to this office. | |||||||
05/31/2022 | 6017 | Minor | 4.4 All incident records, including test results not kept until storage tank system closure. | Investigate the cause of the L3: Reg Interstitial fuel alarms. Submit an Incident Investigation Form along with findings/resolutions. | |||||||
05/31/2022 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Test the overfill protection devices and submit the test results to this office. If annual testing is conducted in the future, this facility will be referred to the DEP for enforcement. | |||||||
05/31/2022 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Investigate the source of the RUL interstitial alarms. | |||||||
05/31/2022 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Test the single-walled spill buckets and submit the test results to this office. | |||||||
05/31/2022 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Test the release detection devices and submit the test results to this office. If annual testing is conducted in the future, this facility will be referred to the DEP for enforcement. | |||||||
05/31/2022 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Test the piping and dispenser sumps. Submit the test results to this office. | |||||||
No Discharges Found |