![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Federal Government | ||||||||
County | Okaloosa | Status | OPEN | ||||||||
ID | 8630252 | Latitude | 30° 23' 29.306 | ||||||||
Name |
US COAST GUARD HWY 98 W OF DESTIN BRIDGE |
Longitude | 86° 31' 33.254 | ||||||||
DESTIN, FL 32541 | LL Method | DGPS | |||||||||
Contact | ENGINEERING PETTY OFFICER | LL Status | REVIEWED | ||||||||
Phone | (850) 244-2682 | Status Date | 12/02/2003 | ||||||||
Account Owner Information | |||||||||||
Name | US COAST GUARD PO BOX 1289 DESTIN, FL 32541 |
Effective Date | 08/31/1999 | ||||||||
Contact | MICHAEL CLASUEN | ||||||||||
Phone | (850) 244-7147 | ||||||||||
MICHAEL.A.CLAUSEN@USCG.MIL | |||||||||||
Placard # / Date | |||||||||||
Property Owner Information | |||||||||||
Name | US COAST GUARD PO BOX 1289 DESTIN, FL 32541 |
Effective Date | 12/15/1986 | ||||||||
Contact | MICHAEL CLASUEN | ||||||||||
Phone | (850) 244-7147 | ||||||||||
MICHAEL.A.CLAUSEN@USCG.MIL | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 2000 | Vehicular Diesel (D) | 01/01/1993 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners |
(Q) Visual inspection of ASTs (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1000 | Emerg Generator Diesel (G) | 11/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(I) Suction piping system (M) Double wall - pipe jacket (N) Approved synthetic material |
(B) Site Suitabilitiy Plan exemption (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (M) Manual tank gauging - USTs (Q) Visual inspection of ASTs (V) Suction pump check valve (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 1000 | Vehicular Diesel (D) | 03/01/2025 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (M) Spill containment bucket |
(B) Steel/galvanized metal | (Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Emerg Generator Diesel (G) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel | (B) Steel/galvanized metal | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Vehicular Diesel (D) | 07/01/1978 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 08/09/2009 | 09/11/2025 | |||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 08/09/2008 | 08/09/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 09/02/2005 | 09/12/2005 | IN-COMPLIANCE | JOHN S. STEVENSON | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes HURRICANE KATRINA DAMAGE ASSESSMENT INSPECTION. DO DAMAGE TO AST'S, PIPING OR DISPENSING SYSTEMS FROM STORM. SYSTEM FULLY FUNCTIONAL. | |||||||||||
TCI | 07/14/2005 | 07/21/2005 | IN-COMPLIANCE | J. SCOTT HALE | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO RELEASE OR DAMAGE. SYSTEM OPERATIONAL. | |||||||||||
TCR | 06/23/2005 | 07/01/2005 | IN-COMPLIANCE | JOHN S. STEVENSON | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 05/16/2005 | 05/23/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/04/2004 | 02/09/2004 | IN-COMPLIANCE | JOHN S. STEVENSON | 2/0 | COMPLIANCE ASSURANCE | |||||
TCR | 06/17/2003 | 06/18/2003 | IN-COMPLIANCE | J. SCOTT HALE | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 03/10/2003 | 03/11/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | J. SCOTT HALE | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 05/22/2002 | 05/28/2002 | IN-COMPLIANCE | V. PAUL HUTCHERSON | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/21/2001 | 03/07/2001 | IN-COMPLIANCE | THAYER_JD | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/02/2000 | 03/07/2000 | IN-COMPLIANCE | THAYER_JD | 2/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/30/1999 | 08/06/1999 | THAYER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/21/1999 | 06/09/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | THAYER_J | 2/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 03/20/2025 | Satisfied | GARTIN_D | Closure | |||||||
Electronic Communication | 03/20/2025 | Satisfied | GARTIN_D | Closure | |||||||
Site Inspection | 03/20/2025 | Minor Out of Compliance | GARTIN_D | 2/0 | Closure | ||||||
Letter | 03/20/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Phone Conversation | 01/26/2024 | Satisfied | GARTIN_D | Closure | |||||||
Enforcement Referral | 06/09/2023 | Accepted | GARTIN_D | Enforcement | |||||||
Record Document | 06/06/2023 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 03/16/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 03/15/2023 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Site Inspection | 03/15/2023 | Major Out of Compliance | GARTIN_D | 2/0 | Routine Compliance | ||||||
Phone Conversation | 03/15/2023 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Phone Conversation | 09/12/2019 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 09/12/2019 | In Compliance | PANGAHAS_RL_1 | 2/0 | Routine Compliance | ||||||
Letter | 09/12/2019 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Issue Document | 09/12/2019 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Electronic Communication | 09/12/2019 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Issue Document | 09/22/2017 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 09/21/2017 | In Compliance | PANGAHAS_RL_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 09/20/2017 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Phone Conversation | 09/20/2017 | Satisfied | PANGAHAS_RL_1 | Routine Compliance | |||||||
Site Inspection | 03/31/2015 | In Compliance | BRAZILE_DO_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 02/19/2013 | In Compliance | KHAN_MR_1 | 2/0 | Routine Compliance | ||||||
Record Document | 05/12/2011 | Satisfied | HALE_JS_1 | Non-Compliance | |||||||
Site Inspection | 04/04/2011 | In Compliance | HALE_JS_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 01/28/2010 | In Compliance | HALE_JS_1 | 2/0 | Routine Compliance | ||||||
Letter | 12/18/2008 | Satisfied | HALE_JS_1 | Non-Compliance | |||||||
Letter | 12/18/2008 | Satisfied | HALE_JS_1 | Non-Compliance | |||||||
Site Inspection | 12/12/2008 | Major Out of Compliance | HALE_JS_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 04/30/2008 | In Compliance | KHAN_MR_1 | 2/0 | Routine Compliance | ||||||
Letter | 05/29/2007 | Satisfied | HALE_JS_1 | Non-Compliance | |||||||
Site Inspection | 05/15/2007 | Minor Out of Compliance | HALE_JS_1 | 2/0 | Routine Compliance | ||||||
Letter | 06/26/2006 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 06/01/2006 | Minor Out of Compliance | STEVENSON_JS | 2/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/20/2025 | 6004 | Minor | 2.3 For Installation or Closure, Certified Contractors Form not submitted. | Due to work being completed for a closure without a PSSC license holder, the facility is required to conduct environmental assessment sampling and provide a full closure report of the removed in contact with the soil components of piping and transition sump. | |||||||
03/20/2025 | 7105 | Minor | 1.14 Closure Report not submitted. | Environmental assessment must be conducted in accordance with Instructions for Conducting Sampling During Aboveground Storage Tank Closure, July 2019. A Closure Report shall be submitted in writing or electronic format to the County for the removed underground components to Donald Moore (Donald.Moore@flhealth.gov) and Nicolle Hicks (Nicolle.Hicks@flhealth.gov). | |||||||
03/20/2025 | 7005 | Minor | 1.5 Notification of installation, closure, or change in service status not received in required timeframes. | Provide a Notification Form detailing the information regarding the closure of whom was the contractor of the AST closure, owner contact information, location with facility information of closure, and scope of closure to Daniel.Gartin@flhealth.gov. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
03/11/1993 | COMPLETED | 34 | |||||||||