![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Putnam | Status | OPEN | ||||||||
ID | 8630744 | Latitude | 29° 37' 39.756 | ||||||||
Name |
T&K DISCOUNT 1014 HWY 20 |
Longitude | 81° 51' 50.9688 | ||||||||
INTERLACHEN, FL 32148 | LL Method | DPHO | |||||||||
Contact | TALAL ASKAR | LL Status | REVIEWED | ||||||||
Phone | (904) 514-6961 | Status Date | 04/21/2008 | ||||||||
Account Owner Information | |||||||||||
Name | T&K DISCOUNT INC 1014 SR 20 Interlachen, FL 32148 |
Effective Date | 02/27/2015 | ||||||||
Contact | TALAL ASKAR | ||||||||||
Phone | (904) 514-6961 | ||||||||||
TALALASKAR319@GMAIL.COM | |||||||||||
Placard # / Date | 694115 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | marcelo investments llc 11196 Eston Pl Jacksonville, FL 32257-1540 |
Effective Date | 11/08/2023 | ||||||||
Contact | talal askar | ||||||||||
Phone | (904) 514-6961 | ||||||||||
talalaskar319@gmail.com | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 10000 | Unleaded Gas (B) | 10/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 550 | Kerosene (K) | 08/01/1995 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Abv, no soil contact | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 10000 | Vehicular Diesel (D) | 10/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Unleaded Gas (B) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Unleaded Gas (B) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Vehicular Diesel (D) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Kerosene (K) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 08/01/1995 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Vehicular Diesel (D) | 08/01/1995 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
INSURANCE | 08/29/2023 | 08/29/2025 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 08/29/2019 | 08/29/2023 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 08/29/2018 | 08/28/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/29/2016 | 08/29/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/29/2015 | 08/29/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/29/2014 | 08/29/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/29/2013 | 08/29/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 09/30/2009 | 09/30/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/30/2008 | 09/30/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TIN | 01/27/2006 | 01/31/2006 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes NEW SPILL BUCKETS ARE INSTALLED AND HYDROSTATIC TEST COMPLETED TO SHOW SEALS ARE TIGHT. | |||||||||||
TIV | 01/26/2006 | 01/31/2006 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes AET ON SITE COMPLETING SOIL ANALYSIS INVESTIGATION AROUND ALL SPILL BUCKETS REMOVED. | |||||||||||
TII | 01/25/2006 | 01/31/2006 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes START TO REMOVE OLD SPILL BUCKET(S) AND REPLACE WITH DOUBLE WALL EMCO WHEATON SPILL CONTAINMENTS EQ-594. | |||||||||||
IRFR | 01/06/2006 | 01/11/2006 | FLOWERS_D | 0/2 | DISCHARGE PROJECT | ||||||
Completion Notes HYDROSTATIC TEST ON SPILL BUCKET FOR PREMIUM FUEL FAILED. GUARDIAN FUELING WILL REPLACE SPILL BUCKET AND AET WILL PEFORM LIMITED CLOSURE REPORT. | |||||||||||
TCI | 05/12/2005 | 05/12/2005 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCR | 09/23/2004 | 09/30/2004 | IN-COMPLIANCE | FLOWERS_D | 0/2 | DISCHARGE PROJECT | |||||
Completion Notes NEW VACUUM GAUGES PUT ON TANK INTERSTITIAL FOR RELEASE PROTECTION.T#7 AT 14PSI AND T#6 AT 15PSI . | |||||||||||
TCI | 05/27/2004 | 05/28/2004 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TIN | 03/31/2004 | 04/02/2004 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLING AMERON DOUBLE WALL FIBERGLASS PIPING FROM SUMP TO INSTALLING. | |||||||||||
TXI | 03/30/2004 | 04/02/2004 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes REMOVED ENVIRON GEO-FLEX PIPING THAT HAS SPLIT AT COUPLING GOING INTO SUMP CONTAINMENT. | |||||||||||
TIN | 11/03/2003 | 11/04/2003 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLING GILBARCO DISPENSERS (REMOVING OLD SCHLUMBER-J DISPENSERS) AND ADDING ONE NEW PRODUCT LINE FOR DIESEL.HYDROSTATIC TEST ON EXISTING ENVIRON DISPENSER BOXES AND LINE TEST FOR NEW DIESEL PRODUCT LINE COMPLETED. | |||||||||||
RRBD | 07/16/2003 | 07/16/2003 | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TANK #7 HAS HAD BRIME SOLUTION REMOVED AND MONTHLY INTERSTITIAL SPACE IS NOW BEING CHECKED MANUALLY BECAUSE VAC. GAUGE HAS BEEN REMOVED. | |||||||||||
TCI | 05/27/2003 | 05/27/2003 | MINOR OUT-OF-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes BIME SOLUTION BETWEEN TANK WALLS WAS REMOVED AND MANUAL MONTHLY INSPECTION SHOWED WATER WAS BEIG FOUND AGAIN BETWEEN TANK WALL BUT SIRS MONTHLY FOUND NO LOST OF ANY PRODUCT. | |||||||||||
TCI | 06/06/2002 | 06/07/2002 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 05/24/2001 | 05/24/2001 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 05/24/2000 | 05/24/2000 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 06/22/1999 | 06/23/1999 | IN-COMPLIANCE | FLOWERS_D | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 04/30/2025 | Satisfied | MCNEIL_A | Compliance Assistance | |||||||
Enforcement Tracking | 04/15/2025 | Closed Without Enforcement | MCNEIL_A | Enforcement | |||||||
Phone Conversation | 04/15/2025 | Satisfied | MCNEIL_A | Enforcement | |||||||
Letter | 04/02/2025 | Satisfied | MCNEIL_A | Enforcement | |||||||
Enforcement Referral | 03/17/2025 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Record Document | 01/06/2025 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/17/2024 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 11/17/2024 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 11/17/2024 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 11/17/2024 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Letter | 11/21/2023 | Satisfied | MILLS_MM | Enforcement | |||||||
Enforcement Tracking | 11/21/2023 | Closed Without Enforcement | MILLS_MM | Enforcement | |||||||
Phone Conversation | 11/21/2023 | Satisfied | MILLS_MM | Enforcement | |||||||
Letter | 03/23/2023 | Satisfied | MILLS_MM | Enforcement | |||||||
Enforcement Tracking | 02/02/2023 | Closed Without Enforcement | MILLS_MM | Enforcement | |||||||
Enforcement Referral | 01/12/2023 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Enforcement Referral | 12/07/2022 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Letter | 12/04/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 12/04/2022 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 12/04/2022 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 11/24/2022 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 06/03/2022 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/19/2020 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 11/19/2020 | Major Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Letter | 11/19/2020 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 11/19/2020 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Enforcement Tracking | 07/09/2019 | Closed Without Enforcement | OBRIEN_S | Enforcement | |||||||
Letter | 07/09/2019 | Satisfied | OBRIEN_S | Enforcement | |||||||
Enforcement Referral | 10/31/2018 | Accepted | LIBBY_KK_1 | Enforcement | |||||||
Electronic Communication | 04/29/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 04/29/2018 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 04/29/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 04/27/2018 | Minor Out of Compliance | HARRINGTON_RD_1 | 1/2 | Routine Compliance | ||||||
Phone Conversation | 08/16/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 06/10/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Record Document | 03/11/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Letter | 01/08/2016 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 01/07/2016 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/2 | Routine Compliance | ||||||
Meeting | 12/30/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Record Document | 11/17/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Record Document | 02/13/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Enforcement Tracking | 02/13/2015 | Closed Without Enforcement | DEFALCO_L | Enforcement | |||||||
Letter | 02/13/2015 | Satisfied | DOHANEY_T | Enforcement | |||||||
Issue Document | 02/13/2015 | Satisfied | DEFALCO_L | Enforcement | |||||||
Issue Document | 12/29/2014 | Satisfied | DOHANEY_T | Enforcement | |||||||
Enforcement Referral | 12/17/2014 | Accepted | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 12/11/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 12/11/2014 | Major Out of Compliance | HARRINGTON_RD_1 | 1/2 | Non-Compliance | ||||||
Enforcement Tracking | 12/05/2014 | Closed Without Enforcement | DEFALCO_L | Enforcement | |||||||
Electronic Communication | 12/05/2014 | Satisfied | DOHANEY_T | Non-Compliance | |||||||
Electronic Communication | 10/29/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Enforcement Referral | 05/29/2014 | Accepted | KIRTS_B | Enforcement | |||||||
Electronic Communication | 05/29/2014 | Satisfied | KIRTS_B | Enforcement | |||||||
Letter | 04/29/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 03/18/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 02/11/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 02/11/2014 | Satisfied | HARRINGTON_RD_1 | Non-Compliance | |||||||
Site Inspection | 02/11/2014 | Major Out of Compliance | HARRINGTON_RD_1 | 1/2 | Routine Compliance | ||||||
Site Inspection | 05/14/2012 | In Compliance | HARRINGTON_RD_1 | 1/2 | Routine Compliance | ||||||
Discharge Reporting | 02/18/2011 | Satisfied | DEFALCO_L | Discharge | |||||||
Document Management | 05/19/2010 | Satisfied | FLOWERS_D | Discharge | |||||||
Site Inspection | 04/01/2010 | In Compliance | HARRINGTON_RD_1 | 1/2 | Routine Compliance | ||||||
Letter | 04/30/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Record Document | 04/16/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Enforcement Tracking | 03/27/2009 | Closed Without Enforcement | DEFALCO_L | Enforcement | |||||||
Letter | 02/24/2009 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 02/24/2009 | Minor Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Record Document | 05/19/2008 | Satisfied | DOHANEY_T | Discharge | |||||||
Issue Document | 05/19/2008 | Satisfied | DOHANEY_T | Discharge | |||||||
Record Document | 03/27/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 03/20/2008 | Major Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Letter | 03/20/2008 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Enforcement Referral | 03/14/2008 | Accepted | DEFALCO_L | Enforcement | |||||||
Record Document | 03/14/2008 | Satisfied | DEFALCO_L | Discharge | |||||||
Issue Document | 11/16/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 11/16/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Issue Document | 09/26/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 09/26/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Issue Document | 09/26/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 09/26/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 09/26/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Issue Document | 06/05/2007 | Satisfied | DEFALCO_L | Discharge | |||||||
Record Document | 05/02/2007 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Letter | 04/10/2007 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 04/10/2007 | Minor Out of Compliance | BARNETT_PC_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Site Inspection | 12/01/2006 | In Compliance | FLOWERS_D | 0/2 | Installation | ||||||
Site Inspection | 10/02/2006 | In Compliance | FLOWERS_D | 0/2 | Closure | ||||||
Emergency Preparedness Information | 09/28/2006 | Satisfied | FLOWERS_D | Routine Compliance | |||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | FLOWERS_D | Routine Compliance | |||||||
Record Document | 09/08/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Record Document | 09/08/2006 | Satisfied | DOHANEY_T | Non-Compliance | |||||||
Issue Document | 09/08/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Record Document | 08/01/2006 | Satisfied | DEFALCO_L | Non-Compliance | |||||||
Letter | 07/21/2006 | Satisfied | FLOWERS_D | Non-Compliance | |||||||
Letter | 07/14/2006 | Satisfied | FLOWERS_D | Non-Compliance | |||||||
Site Inspection | 06/15/2006 | Major Out of Compliance | FLOWERS_D | 0/2 | Non-Compliance | ||||||
Letter | 06/15/2006 | Satisfied | FLOWERS_D | Non-Compliance | |||||||
Site Inspection | 05/10/2006 | In Compliance | FLOWERS_D | 0/2 | Discharge | ||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
05/05/2006 | COMPLETED | 76 | |||||||||
06/01/1989 | COMPLETED | 76 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
08/27/1987 | COMPLETED | 76 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||