District | Southwest | Type | Marine/Coastal Fuel Storage | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 8630856 | Latitude | 27° 41' 30.5542 | ||||||||
Name |
TIERRA VERDE MARINA 100 PINELLAS BAYWAY S |
Longitude | 82° 43' 9.6012 | ||||||||
TIERRA VERDE, FL 33715-1700 | LL Method | DPHO | |||||||||
Contact | KEVIN BARTKOVSKY | LL Status | REVIEWED | ||||||||
Phone | (727) 710-0869 | Status Date | 08/29/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CYPRESS PROPERTY MGMT SRVCS 5300 W CYPRESS ST TAMPA, FL 33607 |
Effective Date | 07/20/2011 | ||||||||
Contact | JEREMY HECKLER | ||||||||||
Phone | (202) 355-3578 | ||||||||||
JHECKLER@TVMARINA.COM | |||||||||||
Placard # / Date | 687079 - 06/12/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CYPRESS PROPERTY MGMT SRVCS 5300 W CYPRESS ST TAMPA, FL 33607 |
Effective Date | 10/05/2012 | ||||||||
Contact | JEREMY HECKLER | ||||||||||
Phone | (202) 355-3578 | ||||||||||
JHECKLER@TVMARINA.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 16000 | Unleaded Gas (B) | 10/01/1993 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(B) Steel/galvanized metal (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Unleaded Gas (B) | 10/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Unleaded Gas (B) | 12/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 12/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/10/2024 | 05/10/2025 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2023 | 05/10/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2022 | 05/10/2023 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2021 | 05/10/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2020 | 05/10/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2019 | 05/10/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2018 | 05/10/2019 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2017 | 05/10/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2016 | 05/10/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2015 | 05/10/2016 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2014 | 05/10/2015 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/10/2013 | 05/10/2014 | ACE | ||||||||
INSURANCE | 05/10/2012 | 05/10/2013 | ACE | ||||||||
INSURANCE | 05/10/2011 | 05/10/2012 | ACE | ||||||||
INSURANCE | 05/10/2010 | 05/10/2011 | ACE | ||||||||
INSURANCE | 05/02/2008 | 05/02/2009 | ACE | ||||||||
INSURANCE | 12/23/1993 | 12/23/1998 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
DPRI | 08/03/2005 | 08/04/2005 | IN-COMPLIANCE | FRAZIER | 0/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 08/03/2005 | 08/04/2005 | IN-COMPLIANCE | FRAZIER | 0/3 | COMPLIANCE ASSURANCE | |||||
LTR | 08/03/2005 | 08/04/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/09/2005 | 06/13/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 06/01/2005 | 06/07/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | BARNETT | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 06/01/2005 | 06/07/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 05/19/2005 | 05/23/2005 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/18/2005 | 05/23/2005 | MINOR OUT-OF-COMPLIANCE | BARNETT | 0/3 | COMPLIANCE ASSURANCE | |||||
LTR | 12/20/2004 | 12/29/2004 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 12/17/2004 | 12/29/2004 | IN-COMPLIANCE | FRAZIER | 0/3 | COMPLIANCE ASSURANCE | |||||
LTR | 04/23/2004 | 04/29/2004 | PINK | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/23/2004 | 04/29/2004 | IN-COMPLIANCE | PINK | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes MARINA TANKS PIPE-GREEN TAPE IN EARTHEN SUMPS; PRIMARY TYPE NOT VISIBLE | |||||||||||
DPRI | 04/23/2004 | 04/29/2004 | PINK | 0/0 | TERMINAL FACILITY PROJECT | ||||||
RRBD | 07/11/2003 | 07/15/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO CORRECTION - SENSORS TESTED BUT DO NOT HAVE POSITIVE SHUT-DOWN OF PUMPS WHEN TRIPPED | |||||||||||
RRBD | 05/08/2003 | 06/04/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 04/30/2003 | 05/01/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
DPRI | 04/25/2003 | 05/15/2003 | IN-COMPLIANCE | STRAUSS | 0/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 04/25/2003 | 05/01/2003 | MINOR OUT-OF-COMPLIANCE | STRAUSS | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPE NOT VISIBLE | |||||||||||
LTR | 04/22/2002 | 05/06/2002 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
DPRI | 04/18/2002 | 06/14/2002 | IN-COMPLIANCE | TAM | 0/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 04/17/2002 | 05/05/2002 | IN-COMPLIANCE | TAM | 0/3 | COMPLIANCE ASSURANCE | |||||
DPRI | 03/16/2001 | 03/27/2001 | IN-COMPLIANCE | EASTMAN_T | 0/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 07/17/2000 | 08/01/2000 | IN-COMPLIANCE | CASTOR | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 08/27/1999 | 08/31/1999 | IN-COMPLIANCE | CASTOR | 0/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/07/1999 | 07/12/1999 | SOWERS | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 06/11/1999 | 06/15/1999 | SOWERS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/26/1999 | 05/27/1999 | MINOR OUT-OF-COMPLIANCE | SOWERS | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 03/27/2024 | Major Out of Compliance | PUHR_NM_1 | 0/2 | Routine Compliance | ||||||
Letter | 03/27/2024 | Satisfied | PUHR_NM_1 | Compliance Assistance | |||||||
Letter | 02/18/2022 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 02/18/2022 | Major Out of Compliance | COLSON_NJ_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 12/09/2021 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Enforcement Referral | 09/27/2019 | Accepted | COLSON_NJ_1 | Enforcement | |||||||
Electronic Communication | 09/10/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 09/10/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 09/10/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 09/10/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 05/10/2019 | Major Out of Compliance | COLSON_NJ_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/10/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 04/26/2019 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Record Document | 03/04/2016 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Phone Conversation | 01/28/2016 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Letter | 01/26/2016 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||||||
Site Inspection | 01/26/2016 | Major Out of Compliance | COLSON_NJ_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 01/13/2016 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
TCAR | 03/19/2014 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Letter | 03/19/2014 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Document Management | 03/19/2014 | Complete | ROGGELIN_EM_1 | Closure | |||||||
Record Document | 12/30/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Issue Document | 11/26/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Site Inspection | 11/25/2013 | Minor Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Letter | 11/25/2013 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 06/17/2013 | Satisfied | ROGGELIN_EM_1 | Closure | |||||||
Record Document | 09/11/2012 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 09/04/2012 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 09/04/2012 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 09/04/2012 | Minor Out of Compliance | STRAUSS_RH_1 | 0/2 | Installation | ||||||
Site Inspection | 08/29/2012 | Minor Out of Compliance | LONGEN_JL_1 | 0/1 | Closure | ||||||
Letter | 08/29/2012 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 06/14/2012 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 06/14/2012 | Minor Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 06/12/2012 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Letter | 05/23/2012 | Satisfied | STRAUSS_RH_1 | Closure | |||||||
Issue Document | 02/20/2012 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
TCAR | 12/27/2011 | Satisfied | STRAUSS_RH_1 | Closure | |||||||
Enforcement Tracking | 06/15/2011 | Closed Without Enforcement | PEDIGO_L | Enforcement | |||||||
Site Inspection | 06/02/2011 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Non-Compliance | ||||||
Letter | 06/02/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 05/11/2011 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 05/06/2011 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/06/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Incident | 03/22/2011 | Has not led to Discharge | STRAUSS_RH_1 | Incident | |||||||
Issue Document | 01/21/2011 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Discharge Reporting | 06/18/2010 | Satisfied | SOWERS_JA_1 | Discharge | |||||||
Document Management | 06/18/2010 | Complete | SOWERS_JA_1 | Discharge | |||||||
Letter | 06/15/2010 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Letter | 06/14/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 06/14/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 06/14/2010 | Major Out of Compliance | STRAUSS_RH_1 | 0/1 | Non-Compliance | ||||||
Site Inspection | 06/03/2010 | Major Out of Compliance | ROGGELIN_EM_1 | 0/1 | Installation | ||||||
Letter | 05/21/2010 | Satisfied | ROGGELIN_EM_1 | Non-Compliance | |||||||
Site Inspection | 05/17/2010 | Major Out of Compliance | ROGGELIN_EM_1 | 0/1 | Installation | ||||||
Electronic Communication | 04/30/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 04/23/2010 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Letter | 04/12/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 04/12/2010 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Record Document | 03/11/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 03/03/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 11/05/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 11/05/2009 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Closure | ||||||
Letter | 04/14/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 04/14/2009 | Major Out of Compliance | BARNETT_JX | 0/3 | Routine Compliance | ||||||
Letter | 02/16/2009 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 02/16/2009 | Major Out of Compliance | BARNETT_JX | 0/3 | Closure | ||||||
Record Document | 09/11/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 04/30/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 04/29/2008 | Major Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 02/29/2008 | Major Out of Compliance | LONGEN_JL_1 | 0/2 | Non-Compliance | ||||||
Letter | 02/29/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Record Document | 01/04/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Enforcement Referral | 10/09/2007 | Accepted | MARSH_L | Enforcement | |||||||
Site Inspection | 10/05/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/3 | Non-Compliance | ||||||
Letter | 10/05/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 07/18/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 07/09/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/3 | Non-Compliance | ||||||
Letter | 06/19/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 05/16/2007 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 05/15/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 03/27/2007 | Major Out of Compliance | LONGEN_JL_1 | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/27/2024 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Treat/repair the corrosion in the STP sump as necessary and submit documentation to this office for review once completed. | |||||||
02/18/2022 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair the Premium spill bucket as necessary. Notify this office if more than the Primary insert must be replaced. Submit post-installation integrity test results once repairs are complete. | |||||||
05/10/2019 | 4016 | SNC-B | 2.5 Incident investigation not initiated within 24-hours of discovery. | Fill out & submit an Incident Notification Form. Investigate the Incident (vacuum test the bucket) & then submit investigation results to this office. | |||||||
05/10/2019 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Submit current integrity test results for the (4) double walled spill buckets. | |||||||
05/10/2019 | 4068 | Minor | 4.3 Storage tank system has a not repaired component which has or could cause a release or discharge. | Repair/replace the faulty sensor. Submit work receipts to this office for review, once corrected. | |||||||
05/10/2019 | 4067 | Minor | 4.2 Release detection devices not tested annually. | Submit current test results for the (4) spill bucket VisiGauges. | |||||||
05/10/2019 | 4067 | Minor | 4.2 Release detection devices not tested annually. | Submit current test results for the EBW monitoring panel & (2) liquid sensors. | |||||||
05/10/2019 | 4079 | Minor | 2.7 Records requiring 3 years documentation period not kept by facility. | Submit the missing test results, if found. Provide current test results for the (2) mechanical line leak detectors on the convenience store UST system. | |||||||
05/10/2019 | 4067 | Minor | 4.2 Release detection devices not tested annually. | Submit current test results for the tank interstice vacuum gauge. | |||||||
05/10/2019 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Submit current test results for the (2) ball float valves in the Marina side UST and for the (2) flow shutoff valves in the C-Store side UST. | |||||||
05/10/2019 | 4076 | Minor | 4.11 Failure to conduct required periodic containment and interstitial integrity testing. | Submit current integrity test results for the (2) C-Store side STP sumps. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/09/2009 | COMPLETED | 7 | |||||||||
07/21/1993 | COMPLETED | ||||||||||
07/13/1990 | COMPLETED | ||||||||||