![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Fuel user/Non-retail | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 8630998 | Latitude | 27° 48' 18.4297 | ||||||||
Name |
HCA FLORIDA ST PETERSBURG HOSPITAL 6500 38TH AVE N |
Longitude | 82° 43' 33.2344 | ||||||||
SAINT PETERSBURG, FL 33710 | LL Method | DPHO | |||||||||
Contact | EDWARD WRIGHTSON | LL Status | REVIEWED | ||||||||
Phone | (727) 341-4080 | Status Date | 08/26/2013 | ||||||||
Account Owner Information | |||||||||||
Name | HCA FLORIDA ST PETERSBURG HOSPITAL 6500 38TH AVE N SAINT PETERSBURG, FL 33710 |
Effective Date | 04/09/1993 | ||||||||
Contact | ED WRIGHTSON | ||||||||||
Phone | (727) 341-4080 | ||||||||||
EDWARD.WRIGHTSON@HCAHEALTHCARE.COM | |||||||||||
Placard # / Date | 675320 - 06/03/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | GALEN OF FLORIDA INC ONE PARK PLAZA NASHVILLE, TN 37203 |
Effective Date | 07/12/2021 | ||||||||
Contact | EDWARD WRIGHTSON | ||||||||||
Phone | (727) 341-4080 | ||||||||||
EDWARD.WRIGHTSON@HCAHEALTHCARE.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Emerg Generator Diesel (G) | 01/01/1999 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Emerg Generator Diesel (G) | 01/01/2003 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (I) Suction piping system (N) Approved synthetic material |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 3448 | Emerg Generator Diesel (G) | 07/01/2019 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (Z) DEP approved piping |
(6) External piping monitoring (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Emerg Generator Diesel (G) | 01/01/1985 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (F) Monitor dbl wall tank space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 2000 | Emerg Generator Diesel (G) | 01/01/1985 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (F) Monitor dbl wall tank space | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 2000 | Emerg Generator Diesel (G) | 01/01/1999 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 09/01/2020 | 09/01/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2019 | 09/01/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2018 | 09/01/2019 | ACE AMER INS CO | ||||||||
INSURANCE | 09/01/2017 | 09/01/2018 | ACE AMER INS CO | ||||||||
INSURANCE | 09/01/2016 | 09/01/2017 | ACE AMER INS CO | ||||||||
INSURANCE | 09/01/2015 | 09/01/2016 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2014 | 09/01/2015 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 09/01/2013 | 09/01/2014 | ACE | ||||||||
INSURANCE | 09/01/2011 | 09/01/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/01/2010 | 09/01/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/01/2009 | 09/01/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 09/01/2008 | 09/01/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
NCLI | 12/02/2005 | 12/06/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/02/2005 | 12/06/2005 | FRAZIER | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/02/2005 | 12/06/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | FRAZIER | 2/0 | COMPLIANCE ASSURANCE | |||||
LTR | 11/05/2004 | 11/08/2004 | BARNETT | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/04/2004 | 11/08/2004 | IN-COMPLIANCE | BARNETT | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 03/12/2004 | 03/22/2004 | IN-COMPLIANCE | PINK | 2/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 04/30/2003 | 05/01/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TXI | 02/28/2003 | 05/01/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 2/0 | COMPLIANCE ASSURANCE | |||||
LTR | 02/24/2003 | 02/24/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 02/21/2003 | 02/24/2003 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 02/14/2003 | 02/24/2003 | IN-COMPLIANCE | STRAUSS | 2/0 | COMPLIANCE ASSURANCE | |||||
TCR | 02/14/2003 | 02/27/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 2/0 | COMPLIANCE ASSURANCE | |||||
LTR | 12/26/2002 | 01/03/2003 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 12/16/2002 | 12/17/2002 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/02/2002 | 12/17/2002 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/20/2002 | 12/17/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 2/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 10/28/2002 | 10/29/2002 | ROGGELIN | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 03/07/2002 | 03/18/2002 | COMPLIANCE ASSURANCE | ||||||||
RRBD | 01/28/2002 | 03/07/2002 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 12/18/2001 | 01/03/2002 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/17/2001 | 12/28/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | TAM | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 10/12/2000 | 10/17/2000 | IN-COMPLIANCE | CASTOR | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 01/06/2000 | 01/29/2000 | IN-COMPLIANCE | CASTOR | 2/0 | COMPLIANCE ASSURANCE | |||||
TIN | 03/02/1999 | 03/12/1999 | MINOR OUT-OF-COMPLIANCE | ROGGELIN | 2/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 03/21/2025 | Accepted | PUHR_NM_1 | Enforcement | |||||||
Enforcement Tracking | 03/21/2025 | Closed Without Enforcement | REIS_A | Enforcement | |||||||
Site Inspection | 02/21/2025 | Major Out of Compliance | PUHR_NM_1 | 3/0 | Routine Compliance | ||||||
Electronic Communication | 02/20/2025 | Satisfied | PUHR_NM_1 | Routine Compliance | |||||||
Letter | 07/22/2024 | Satisfied | REIS_A | Enforcement | |||||||
Enforcement Referral | 06/02/2023 | Accepted | COLSON_NJ_1 | Enforcement | |||||||
Electronic Communication | 03/03/2023 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 03/03/2023 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 05/24/2021 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 05/24/2021 | Major Out of Compliance | COLSON_NJ_1 | 3/0 | Routine Compliance | ||||||
Electronic Communication | 04/15/2021 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Record Document | 10/03/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Letter | 10/03/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 10/01/2019 | Major Out of Compliance | COLSON_NJ_1 | 1/0 | Installation | ||||||
Letter | 10/01/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Enforcement Tracking | 05/31/2019 | Closed With Enforcement | SELLERS_R | Enforcement | |||||||
Electronic Communication | 05/31/2019 | Satisfied | SELLERS_R | Enforcement | |||||||
Enforcement Referral | 03/07/2019 | Accepted | COLSON_NJ_1 | Enforcement | |||||||
Electronic Communication | 02/26/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 02/26/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 02/26/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 02/26/2019 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 11/20/2018 | Major Out of Compliance | COLSON_NJ_1 | 2/0 | Routine Compliance | ||||||
Letter | 11/20/2018 | Satisfied | COLSON_NJ_1 | Compliance Assistance | |||||||
Electronic Communication | 11/06/2018 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Issue Document | 05/19/2016 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Site Inspection | 05/19/2016 | In Compliance | COLSON_NJ_1 | 2/0 | Routine Compliance | ||||||
Phone Conversation | 05/10/2016 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||||||
Issue Document | 03/07/2014 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 03/07/2014 | In Compliance | STRAUSS_RH_1 | 2/0 | Non-Compliance | ||||||
Letter | 02/05/2014 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 02/05/2014 | Minor Out of Compliance | STRAUSS_RH_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 05/24/2012 | In Compliance | STRAUSS_RH_1 | 2/0 | Routine Compliance | ||||||
Record Document | 05/12/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 05/09/2011 | Major Out of Compliance | STRAUSS_RH_1 | 2/0 | Routine Compliance | ||||||
Letter | 05/09/2011 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 06/28/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 05/19/2010 | Minor Out of Compliance | STRAUSS_RH_1 | 2/0 | Routine Compliance | ||||||
Letter | 05/19/2010 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 02/02/2009 | In Compliance | BARNETT_JX | 2/0 | Routine Compliance | ||||||
Site Inspection | 06/25/2008 | In Compliance | LONGEN_JL_1 | 2/0 | Non-Compliance | ||||||
Record Document | 05/23/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Letter | 04/14/2008 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 04/14/2008 | Minor Out of Compliance | LONGEN_JL_1 | 2/0 | Routine Compliance | ||||||
Letter | 06/04/2007 | Satisfied | ZWISSLER_JF | Non-Compliance | |||||||
Site Inspection | 06/04/2007 | Minor Out of Compliance | ZWISSLER_JF | 2/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/20/2025 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | *Submit the missing testing if found; otherwise, have testing performed and submit new documentation to this office for review. | |||||||
02/20/2025 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | *Submit the missing testing if found; otherwise, have testing performed and submit new documentation to this office for review. | |||||||
02/20/2025 | 7010 | SNC-A | 1.8 No financial responsibility instrument or expired instrument for > 180 days. | *Submit the missing documentation from 09/01/2021 to current. | |||||||
02/20/2025 | 7065 | SNC-B | 1.6 Storage tank system not visually inspected once a month. | *Submit the missing records including an alarm history to this office for review. | |||||||
05/24/2021 | 5042 | SNC-B | 3.22 Failure to provide approved overfill protection for shop fabricated tank systems. | Be sure to have the required testing performed within 12 months of the last test date. Maintain records on file for at least 36 months. Submit copies of current test results for the primary overfill protection device on T6 to this office for review. | |||||||
05/24/2021 | 5102 | Minor | 3.3 Shop fabricated storage tank system release detection devices not tested annually. | Be sure to have the required testing performed within 12 months of the last test date. Maintain records on file for at least 36 months. Submit copies of current operability test results for the T6 rupture basin alarm system to this office for review. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/03/1998 | COMPLETED | ||||||||||