![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Marine/Coastal Fuel Storage | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 8631441 | Latitude | 28° 58' 35.2668 | ||||||||
Name |
Hontoon Landing Resort & Marina 2317 RIVER RIDGE RD |
Longitude | 81° 21' 31.6101 | ||||||||
DELAND, FL 32720-4321 | LL Method | DPHO | |||||||||
Contact | Christopher White | LL Status | REVIEWED | ||||||||
Phone | (386) 734-2474 | Status Date | 02/13/2006 | ||||||||
Account Owner Information | |||||||||||
Name | HONTOON LANDING MARINA 2317 RIVER RIDGE RD Deland, FL 32720-4321 |
Effective Date | 06/01/1986 | ||||||||
Contact | Christopher White | ||||||||||
Phone | (386) 734-2474 | ||||||||||
CHRIS@HONTOON.COM | |||||||||||
Placard # / Date | 679542 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | HONTOON LANDING MARINA 2317 RIVER RIDGE RD Deland, FL 32720-4321 |
Effective Date | 06/11/2021 | ||||||||
Contact | Christopher White | ||||||||||
Phone | (386) 734-2474 | ||||||||||
CHRIS@HONTOON.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Unleaded Gas (B) | 07/01/1988 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (K) AST containment |
(F) Double wall (J) Pressurized piping system |
(G) Electronic line leak detector (Z) DEP approved monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 1000 | Leaded Gas (A) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 1000 | Leaded Gas (A) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (D) External protective coating | (H) Mechanical line leak detector | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 500 | Leaded Gas (A) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 06/14/2022 | 06/14/2023 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 06/14/2021 | 06/14/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 07/12/2020 | 07/12/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 07/12/2019 | 07/12/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 07/12/2018 | 07/12/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/12/2015 | 07/12/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/12/2013 | 07/12/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/12/2011 | 07/12/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/12/2010 | 07/12/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/12/2008 | 07/12/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 07/21/2005 | 07/21/2005 | IN-COMPLIANCE | DJ | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes A CHANGE IN REGISTRATION SUBMITTED TO TALLA. REMOVING THE T AND CHANGING TO A U FOR IN SERVICE. | |||||||||||
TCR | 03/28/2005 | 04/04/2005 | IN-COMPLIANCE | TM | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/21/2005 | 03/21/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REPLACING PIPING RESOLVED PREVIOUS N/C ISSUE REFERENCING S/W PIPING. | |||||||||||
TIN | 03/21/2005 | 03/21/2005 | IN-COMPLIANCE | DJ | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING INSTALLATION COMPLETE AT FACILITY. ALL TESTS INDICATED THE D/W LINE IS TIGHT. MEETS THE REQUIREMENT FOR D/W PIPING OVER WATER. | |||||||||||
CALL | 03/18/2005 | 03/22/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED MESSAGE FROM NANCY ROSE @ REMTECH STATING THE PIPING INSTALLED AT FACILITY IS READY FOR FINAL INSPECTION. | |||||||||||
TCI | 07/06/2004 | 07/12/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | MOSER_T | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/09/2003 | 07/09/2003 | IN-COMPLIANCE | DJ | 1/0 | COMPLIANCE ASSURANCE | |||||
TCQA | 08/22/2002 | 08/27/2002 | IN-COMPLIANCE | GT | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/08/2002 | 07/08/2002 | IN-COMPLIANCE | DJ | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/10/2001 | 07/24/2001 | IN-COMPLIANCE | MOSER_T | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/25/2000 | 07/26/2000 | IN-COMPLIANCE | MOSER_T | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/03/1999 | 08/25/1999 | IN-COMPLIANCE | VANDERBLEE_R | 1/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 04/07/2025 | Satisfied | BECKER_GT_1 | Closure | |||||||
Electronic Communication | 04/07/2025 | Satisfied | BECKER_GT_1 | Closure | |||||||
Electronic Communication | 04/04/2025 | Satisfied | BECKER_GT_1 | Closure | |||||||
Electronic Communication | 04/04/2025 | Satisfied | BECKER_GT_1 | Closure | |||||||
Electronic Communication | 03/07/2025 | Satisfied | BECKER_GT_1 | Closure | |||||||
Electronic Communication | 03/06/2025 | Satisfied | BECKER_GT_1 | Closure | |||||||
Electronic Communication | 03/06/2025 | Satisfied | BECKER_GT_1 | Closure | |||||||
Letter | 02/06/2024 | Satisfied | JONES_JEL | Enforcement | |||||||
Enforcement Referral | 04/07/2023 | Accepted | LAFON_AT_2 | Enforcement | |||||||
Electronic Communication | 01/05/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 12/19/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 12/19/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 11/28/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 10/04/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 10/03/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 10/03/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 09/28/2022 | Major Out of Compliance | PIERCE_BN_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 09/07/2022 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Site Inspection | 02/27/2019 | In Compliance | PERRY_JF_2 | 1/0 | Routine Compliance | ||||||
Letter | 02/27/2019 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Electronic Communication | 02/27/2019 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 05/16/2016 | In Compliance | PERRY_JF_2 | 1/0 | Routine Compliance | ||||||
Site Inspection | 09/26/2013 | In Compliance | PERRY_JF_2 | 1/0 | Non-Compliance | ||||||
Site Inspection | 08/20/2013 | Minor Out of Compliance | PERRY_JF_2 | 1/0 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/20/2013 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Letter | 08/20/2013 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 08/10/2011 | In Compliance | CRAFT_TT_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 08/19/2010 | In Compliance | CRAFT_TT_1 | 1/0 | Routine Compliance | ||||||
Record Document | 04/02/2009 | Satisfied | STAFFORD_P_1 | Non-Compliance | |||||||
Record Document | 04/02/2009 | Satisfied | STAFFORD_P_1 | Non-Compliance | |||||||
Letter | 03/24/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 03/11/2009 | Major Out of Compliance | CRAFT_TT_1 | 1/3 | Routine Compliance | ||||||
Site Inspection | 08/23/2007 | In Compliance | MOSER_T | 1/0 | Routine Compliance | ||||||
Site Inspection | 07/19/2006 | In Compliance | MOSER_T | 1/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
09/28/2022 | 7055 | SNC-B | 3.3 Pressurized piping not installed with line leak detectors or does not meet requirements of paragraph 62-762.601(4)(b). | Please arrange for installation & rearrangement of the required valves/line leak detector. The flow of the system components should be: tank pump> manual valve> anti-siphon valve > line leak detector. Please arrange for testing of the line leak detector and supply test results. Please supply pictures of the completed work. | |||||||
No Discharges Found |