![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 03/19/2025 Last Data Refresh: 03/18/2025 Report Generated from DOPPLER | |||||||
District | Southwest | Type | Retail Station | ||||
County | Citrus | Status | OPEN | ||||
ID | 8731642 | Latitude | 28° 53' 34.1799 | ||||
Name |
CIRCLE K #2705995 2025 N LECANTO HWY |
Longitude | 82° 29' 1.3654 | ||||
LECANTO, FL 34461-9675 | LL Method | DPHO | |||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||
Phone | (919) 774-6700 | Status Date | 02/07/2003 | ||||
Account Owner Information | |||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 05/12/2008 | ||||
Contact | IRA LEWIS | ||||||
Phone | (423) 400-2480 | ||||||
ILEWIS@CIRCLEK.COM | |||||||
Placard # / Date | 697792 - 06/28/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
4 | 30000 | Unleaded Gas (B) | 12/01/2007 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 8000 | Unleaded Gas (B) | 12/01/1985 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 8000 | Unleaded Gas (B) | 12/01/1985 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 6000 | Unleaded Gas (B) | 12/01/1985 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
INSURANCE | 04/30/2023 | 08/28/2024 | |||||
GUARANTEE | 04/24/2022 | 08/21/2023 | |||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2015 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2013 | 12/01/2014 | IRONSHORE SPECIALTY INSURANCE CO | ||||
INSURANCE | 12/01/2011 | 12/01/2013 | CHUBB | ||||
INSURANCE | 12/17/2010 | 12/16/2011 | CHUBB | ||||
INSURANCE | 12/17/2009 | 12/17/2010 | CHUBB | ||||
INSURANCE | 12/17/2007 | 12/17/2008 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||
INSURANCE | 02/15/1990 | 09/23/1991 | FPLIPA | ||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
TCI | 05/01/2006 | 05/03/2006 | IN-COMPLIANCE | HARMAN_GR | 0/3 | COMPLIANCE ASSURANCE | |
TCI | 06/07/2005 | 06/07/2005 | IN-COMPLIANCE | MOLLI_SA | 0/3 | COMPLIANCE ASSURANCE | |
TCI | 05/11/2004 | 05/18/2004 | IN-COMPLIANCE | MOLLI_SA | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes PIPING IS SW FIBERGLASS YELLOW | |||||||
TCI | 01/28/2003 | 01/28/2003 | IN-COMPLIANCE | SUMNER_C | 0/3 | COMPLIANCE ASSURANCE | |
Completion Notes SINGLE WALLED FIBERGLASS PIPING (YELLOW) | |||||||
RRBD | 02/11/2002 | 02/11/2002 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||
CWOE | 02/11/2002 | 02/11/2002 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||
NCLI | 12/18/2001 | 12/26/2001 | SUMNER_C | 0/0 | COMPLIANCE ASSURANCE | ||
TCI | 12/18/2001 | 12/26/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | SUMNER_C | 0/3 | COMPLIANCE ASSURANCE | |
TCI | 03/07/2001 | 03/08/2001 | IN-COMPLIANCE | SUMNER_C | 0/3 | COMPLIANCE ASSURANCE | |
TCI | 05/24/2000 | 05/25/2000 | IN-COMPLIANCE | SUMNER_C | 0/3 | COMPLIANCE ASSURANCE | |
RRBD | 02/08/1999 | 03/05/1999 | CHRONISTER_D | 0/3 | COMPLIANCE ASSURANCE | ||
TCI | 01/14/1999 | 03/05/1999 | MINOR OUT-OF-COMPLIANCE | CHRONISTER_D | 0/3 | COMPLIANCE ASSURANCE | |
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Letter | 11/13/2024 | Satisfied | LEE_MC_1 | Compliance Assistance | |||
Site Inspection | 09/25/2024 | Major Out of Compliance | LEE_MC_1 | 0/1 | Routine Compliance | ||
Letter | 09/25/2024 | Satisfied | LEE_MC_1 | Compliance Assistance | |||
Enforcement Referral | 07/21/2023 | Accepted | MULLIGAN_PC_1 | Enforcement | |||
Letter | 03/16/2023 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Site Inspection | 03/16/2023 | Major Out of Compliance | MULLIGAN_PC_1 | 0/1 | Routine Compliance | ||
Record Document | 10/22/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Letter | 10/22/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Incident | 09/22/2020 | Has not led to Discharge | MULLIGAN_PC_1 | Incident | |||
Site Inspection | 08/03/2020 | Major Out of Compliance | MULLIGAN_PC_1 | 0/1 | Routine Compliance | ||
Letter | 08/03/2020 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Document Management | 07/07/2020 | Satisfied | MULLIGAN_PC_1 | Incident | |||
Letter | 01/29/2019 | Satisfied | BROWNLEE_S | Enforcement | |||
Electronic Communication | 01/29/2019 | Satisfied | BROWNLEE_S | Enforcement | |||
Enforcement Tracking | 01/29/2019 | Closed Without Enforcement | BROWNLEE_S | Enforcement | |||
Letter | 01/28/2019 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Site Inspection | 01/28/2019 | In Compliance | MULLIGAN_PC_1 | 0/1 | Compliance Assistance | ||
Enforcement Referral | 01/07/2019 | Accepted | MULLIGAN_PC_1 | Enforcement | |||
Electronic Communication | 12/21/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Electronic Communication | 12/21/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Electronic Communication | 12/20/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Electronic Communication | 12/20/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Site Inspection | 12/10/2018 | Minor Out of Compliance | MULLIGAN_PC_1 | 0/1 | Compliance Assistance | ||
Letter | 12/10/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Document Management | 09/18/2018 | Satisfied | MULLIGAN_PC_1 | Incident | |||
Incident | 09/18/2018 | Has not led to Discharge | MULLIGAN_PC_1 | Incident | |||
Record Document | 09/17/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Site Inspection | 08/02/2018 | Minor Out of Compliance | MULLIGAN_PC_1 | 0/1 | Routine Compliance | ||
Letter | 08/02/2018 | Satisfied | MULLIGAN_PC_1 | Compliance Assistance | |||
Electronic Communication | 07/31/2018 | Satisfied | MULLIGAN_PC_1 | Routine Compliance | |||
Electronic Communication | 12/14/2017 | Satisfied | ANTON_TM_1 | Compliance Assistance | |||
Electronic Communication | 12/11/2017 | Satisfied | ANTON_TM_1 | Compliance Assistance | |||
Electronic Communication | 12/04/2017 | Satisfied | ANTON_TM_1 | Routine Compliance | |||
Record Document | 07/07/2017 | Satisfied | ANTON_TM_1 | Compliance Assistance | |||
Letter | 06/29/2017 | Satisfied | ANTON_TM_1 | Compliance Assistance | |||
Site Inspection | 04/25/2017 | Minor Out of Compliance | ANTON_TM_1 | 0/1 | Routine Compliance | ||
Letter | 04/25/2017 | Satisfied | ANTON_TM_1 | Non-Compliance | |||
Record Document | 12/18/2014 | Satisfied | HECKMAN_DA_1 | Non-Compliance | |||
Letter | 12/16/2014 | Satisfied | HECKMAN_DA_1 | Non-Compliance | |||
Site Inspection | 12/16/2014 | Minor Out of Compliance | HECKMAN_DA_1 | 0/1 | Routine Compliance | ||
Record Document | 08/29/2011 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Letter | 07/18/2011 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Site Inspection | 07/18/2011 | Minor Out of Compliance | COLSON_NJ_1 | 0/1 | Routine Compliance | ||
Site Inspection | 08/13/2010 | In Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||
Site Inspection | 04/29/2010 | Minor Out of Compliance | JUARISTIC_GK_1 | 0/1 | Non-Compliance | ||
Letter | 04/29/2010 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||
Site Inspection | 04/20/2010 | Minor Out of Compliance | JUARISTIC_GK_1 | 0/1 | Routine Compliance | ||
Emergency Preparedness Information | 04/20/2010 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||
Letter | 04/20/2010 | Satisfied | JUARISTIC_GK_1 | Non-Compliance | |||
Record Document | 05/11/2009 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||
Record Document | 09/30/2008 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Letter | 09/30/2008 | Satisfied | COLSON_NJ_1 | Closure | |||
TCAR | 09/30/2008 | Satisfied | COLSON_NJ_1 | Closure | |||
Letter | 09/03/2008 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Site Inspection | 09/03/2008 | Minor Out of Compliance | COLSON_NJ_1 | 0/1 | Non-Compliance | ||
TCAR | 07/14/2008 | Incomplete | COLSON_NJ_1 | Closure | |||
Phone Conversation | 07/09/2008 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Site Inspection | 07/02/2008 | Minor Out of Compliance | COLSON_NJ_1 | 0/1 | Routine Compliance | ||
Letter | 07/02/2008 | Satisfied | COLSON_NJ_1 | Non-Compliance | |||
Emergency Preparedness Information | 06/30/2008 | Satisfied | COLSON_NJ_1 | Routine Compliance | |||
Site Inspection | 06/20/2008 | Major Out of Compliance | BAUER_DR_1 | 0/1 | Installation | ||
Letter | 06/20/2008 | Satisfied | BAUER_DR_1 | Non-Compliance | |||
Letter | 12/26/2007 | Satisfied | OSTENSEN_SA_1 | Non-Compliance | |||
Site Inspection | 12/26/2007 | Major Out of Compliance | OSTENSEN_SA_1 | 0/3 | Closure | ||
Site Inspection | 06/19/2007 | In Compliance | OSTENSEN_SA_1 | 0/3 | Routine Compliance | ||
Emergency Preparedness Information | 02/07/2007 | Satisfied | OSTENSEN_SA_1 | Routine Compliance | |||
Emergency Preparedness Information | 09/26/2006 | Satisfied | HARMAN_GR | Routine Compliance | |||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
03/16/2023 | 6051 | SNC-B | 4.5 Overfill prevention not provided or properly functioning. | Flow shutoff valves should be set at 95% or lower. Repair/replace and retest the diesel flow shutoff valve and submit repair/testing documentation to Citrus County Environmental Health. | |||
03/16/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Scrape/sand/recoat all corroded areas of the PUL STP head and associated piping and submit pictures or a work order to Citrus County Environmental Health. | |||
No Discharges Found |