Cover Page Report
Report Run Date: 05/09/2025        Last Data Refresh: 05/08/2025        Report Generated from DOPPLER
 
District Southeast   Type    County Government
 
County Miami-Dade   Status    OPEN
 
ID 8731649   Latitude    25° 44' 47.0431
 
Name DADE CNTY METROBUS-CORAL WAY
2775 SW 74TH AVE
Longitude    80° 18' 54.4769
  MIAMI, FL 33155-2811 LL Method    DPHO
 
Contact SATYEN THAKAR, P.E.   LL Status    REVIEWED
 
Phone (786) 469-5269   Status Date    12/01/2003
 
Account Owner Information
 
Name MIAMI DADE TRANSIT (MDT)
701 NW 1ST CT #1700
MIAMI, FL 33136-791
Effective Date    05/20/1994
 
Contact SATYEN THAKAR
 
Phone (786) 469-5269
 
Email SATYEN.THAKAR@MIAMIDADE.GOV
  Placard # / Date    698369 - 07/01/2024
No Property Owner Information Found
 
 
Tank Tank Size Content Installed Placement Status
27 500 Emerg Generator Diesel (G) 04/01/1996 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
28 1000 Emerg Generator Diesel (G) 07/01/2003 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(6) External piping monitoring
(D) SPCC Plan
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
29 15000 Vehicular Diesel (D) 07/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
30 15000 Vehicular Diesel (D) 07/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
31 6000 Unleaded Gas (B) 07/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
32 1900 Emerg Generator Diesel (G) 07/01/2020 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
33 1000 New/Lube Oil (O) 09/01/2022 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
34 1000 New/Lube Oil (O) 09/01/2022 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
1 20000 Vehicular Diesel (D) 07/01/1981 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
10 1000 Misc Petrol-Based Product (X) 07/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
11 10000 New/Lube Oil (O) 07/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
12 6000 Waste Oil (L) 07/01/1980 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
13 1000 Waste Oil (L) 07/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
14 550 Other Non Regulated (Z) 07/01/1980 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
15 550 Vehicular Diesel (D) 07/01/1980 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
16 550 Vehicular Diesel (D) 07/01/1980 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
17 550 Vehicular Diesel (D) 07/01/1980 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
18 550 Vehicular Diesel (D) 07/01/1980 UNDERGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (E) Cathodic protection (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
19 12000 Vehicular Diesel (D) 04/01/1998 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(K) AST containment
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
2 20000 Vehicular Diesel (D) 07/01/1981 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
20 12000 Vehicular Diesel (D) 04/01/1998 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(K) AST containment
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
21 12000 Vehicular Diesel (D) 04/01/1998 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(K) AST containment
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(D) SPCC Plan
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
22 12000 Vehicular Diesel (D) 04/01/1998 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(K) AST containment
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
23 12000 Vehicular Diesel (D) 04/01/1998 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(K) AST containment
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(D) SPCC Plan
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
24 12000 New/Lube Oil (O) 04/01/1998 ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(K) AST containment
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(D) SPCC Plan
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
25 500 New/Lube Oil (O) 04/01/1998 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
26 7000 Unleaded Gas (B) 04/01/1998 ABOVEGROUND Deleted - Data Error (D)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
3 20000 Vehicular Diesel (D) 07/01/1981 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
4 20000 Vehicular Diesel (D) 07/01/1981 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
5 6000 Unleaded Gas (B) 07/01/1981 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(N) Flow shut-Off
(P) Level gauges/alarms
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(M) Double wall - pipe jacket
(D) SPCC Plan
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
6 2000 New/Lube Oil (O) 07/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel   (B) Steel/galvanized metal (Y) Unknown
 
 
Tank Tank Size Content Installed Placement Status
7 10000 New/Lube Oil (O) 07/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
8 1000 New/Lube Oil (O) 07/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Tank Tank Size Content Installed Placement Status
9 6000 Waste Oil (L) 07/01/1980 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(E) Fiberglass
(M) Spill containment bucket
  (B) Steel/galvanized metal (8) Manually sampled wells
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2023 01/31/2024
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2022 01/31/2023
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2021 01/31/2022
LOCAL GOVERNMENTS - BOND RATING TEST   01/31/2020 01/31/2021
LOCAL GOVERNMENTS - BOND RATING TEST   01/31/2019 01/31/2020
LOCAL GOVERNMENTS - BOND RATING TEST   01/31/2018 01/31/2019
LOCAL GOVERNMENTS - BOND RATING TEST   02/01/2017 01/31/2018
LOCAL GOVERNMENTS - BOND RATING TEST   05/05/2015 03/18/2017
LOCAL GOVERNMENTS - BOND RATING TEST   02/05/2013 02/05/2014
LOCAL GOVERNMENTS - BOND RATING TEST   09/26/2011 09/26/2012
LOCAL GOVERNMENTS - BOND RATING TEST   02/03/2010 02/03/2011
LOCAL GOVERNMENTS - BOND RATING TEST   11/21/2006 11/20/2007
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
CALL 09/01/2005 09/01/2005 SUAREZ_J 8/0 COMPLIANCE ASSURANCE
 
 Completion Notes THEY WILL SUBMIT PICTURES TO THE DEPARTMENT BY 9/2/05
 
RRBD 09/01/2005 09/22/2005 SUAREZ_J 8/0 COMPLIANCE ASSURANCE
 
 Completion Notes THEY SENT PICTURES DEMONTRATING THEY TOOK CARE OF ALL THE VIOLATIONS
 
NCLI 04/28/2005 04/29/2005 SUAREZ_J 7/0 COMPLIANCE ASSURANCE
 
TCI 12/16/2004 01/25/2005 MINOR OUT-OF-COMPLIANCE BUSEN_K 8/0 COMPLIANCE ASSURANCE
 
 Completion Notes ON TANK 28, FILL PORT NEEDS TO BE MARKED YELLOW FOR DIESEL
 
PDNE 03/05/2004 03/05/2004 COMPLIANCE ASSURANCE
 
UTII 03/16/1995 03/16/1995 MINOR OUT-OF-COMPLIANCE COMPLIANCE ASSURANCE
 
 Completion Notes Routine,Discharge (DRF),
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Engineering Request 01/14/2025 Satisfied DOLAN_J Routine Compliance
 
Electronic Communication 01/14/2025 Satisfied DOLAN_J Routine Compliance
 
Electronic Communication 01/14/2025 Satisfied DOLAN_J Routine Compliance
 
Electronic Communication 01/14/2025 Satisfied DOLAN_J Routine Compliance
 
Record Document 01/14/2025 Satisfied DOLAN_J Routine Compliance
 
Electronic Communication 01/14/2025 Satisfied DOLAN_J Routine Compliance
 
Electronic Communication 01/14/2025 Satisfied DOLAN_J Routine Compliance
 
Electronic Communication 01/14/2025 Satisfied DOLAN_J Routine Compliance
 
Electronic Communication 01/14/2025 Satisfied DOLAN_J Routine Compliance
 
Letter 12/04/2024 Satisfied DOLAN_J Enforcement
 
Letter 12/04/2024 Satisfied DOLAN_J Enforcement
 
Letter 11/19/2024 Satisfied DOLAN_J Compliance Assistance
 
Letter 11/19/2024 Satisfied DOLAN_J Enforcement
 
Letter 11/19/2024 Satisfied DOLAN_J Enforcement
 
Letter 11/19/2024 Satisfied DOLAN_J Enforcement
 
Letter 11/19/2024 Satisfied DOLAN_J Compliance Assistance
 
Site Inspection 11/14/2024 Major Out of Compliance BORGESPADRO_A 2/0 Installation
 
Letter 07/29/2024 Satisfied DOLAN_J Closure
 
TCAR 07/29/2024 Satisfied DOLAN_J Closure
 
Discharge Reporting 02/20/2024 Satisfied DOLAN_J Discharge
 
Letter 02/20/2024 Satisfied DOLAN_J Closure
 
TCAR 02/20/2024 Incomplete DOLAN_J Closure
 
TCAR 01/17/2024 Satisfied DOLAN_J Closure
 
TCAR 01/17/2024 Satisfied DOLAN_J Closure
 
TCAR 01/17/2024 Incomplete DOLAN_J Closure
 
Document Management 09/01/2023 Satisfied KAUFMAN_A Enforcement
 
TCAR 07/19/2023 Satisfied KAUFMAN_A Closure
 
Letter 06/26/2023 Satisfied WILLIAMS_CEW Routine Compliance
 
Document Management 06/22/2023 Satisfied KAUFMAN_A Enforcement
 
Letter 02/06/2023 Satisfied BORGESPADRO_A Routine Compliance
 
Enforcement Referral 02/06/2023 Accepted BORGESPADRO_A Enforcement
 
Site Inspection 01/30/2023 Major Out of Compliance BORGESPADRO_A 8/0 Routine Compliance
 
Letter 01/19/2023 Satisfied KAUFMAN_A Enforcement
 
Enforcement Referral 01/18/2023 Accepted DOLAN_J Enforcement
 
Site Inspection 08/04/2022 Major Out of Compliance KAUFMAN_A 5/0 Closure
 
Letter 08/03/2022 Satisfied KAUFMAN_A Closure
 
TCAR 07/20/2022 Satisfied KAUFMAN_A Closure
 
Site Inspection 07/20/2022 In Compliance KAUFMAN_A 1/0 Closure
 
Letter 03/08/2022 Satisfied SUAREZ_J Routine Compliance
 
Letter 03/01/2022 Satisfied SUAREZ_J Compliance Assistance
 
Site Inspection 10/22/2021 Minor Out of Compliance SUAREZ_J 4/0 Installation
 
Electronic Communication 04/10/2020 Satisfied SUAREZ_J Routine Compliance
 
Letter 01/07/2020 Satisfied SUAREZ_J Compliance Assistance
 
Site Inspection 12/12/2019 Major Out of Compliance SUAREZ_J 7/0 Routine Compliance
 
Record Document 01/05/2018 Satisfied MALONEY_D Compliance Assistance
 
Site Inspection 11/09/2017 In Compliance MALONEY_D 8/0 Compliance Assistance
 
Electronic Communication 11/09/2017 Satisfied MALONEY_D Compliance Assistance
 
Site Inspection 02/23/2017 Major Out of Compliance MALONEY_D 8/0 Routine Compliance
 
Site Inspection 02/20/2014 In Compliance BROWN_SE 7/0 Routine Compliance
 
Phone Conversation 02/18/2014 Satisfied BROWN_SE Routine Compliance
 
Site Inspection 05/02/2013 Minor Out of Compliance BROWN_SE 7/0 Routine Compliance
 
Electronic Communication 05/01/2013 Satisfied BROWN_SE Routine Compliance
 
Site Inspection 10/04/2011 In Compliance WILLIAMS_CEW 7/0 Routine Compliance
 
Electronic Communication 07/21/2010 Satisfied BROWN_SE Non-Compliance
 
Letter 06/24/2010 Satisfied BROWN_SE Non-Compliance
 
Site Inspection 06/24/2010 Minor Out of Compliance BROWN_SE 7/0 Routine Compliance
 
Issue Document 04/25/2007 Satisfied WHITE_CM Routine Compliance
 
Site Inspection 04/20/2007 Minor Out of Compliance WHITE_CM 8/0 Routine Compliance
 
Site Inspection 07/09/2006 In Compliance BARATH_J 10/18 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
07/24/2023 7072 Minor 1.8 Annual operability testing of release detection systems not completed. Provide missing 2022 annual operability test for the Krueger Leak Gauges for Motor Oil tank.
 
01/18/2023 7041 Minor 1.10 Failure to designate, register, or annually test primary overfill protection device, Provide missing annual operability tests for Overfill Protection devices or methods on FDEP tanks 29, 30, 31, and 32 for 2020 through 2022. (RI)
 
07/27/2022 7096 Minor 1.15 Records not kept until closure of system. Provide Department with all records for Tanks #19, #20, #21, #22, #23.
 
07/27/2022 7094 Minor 1.13 Permanent records not available within 5 working days notice. Provide Department with records for Tanks #19, #20, #21, #22, #23.
 
07/27/2022 7005 Minor 1.5 Notification of installation, closure, or change in service status not received in required timeframes. Provide documentation that Department was notified prior to tank removal for Tanks #19, #20, #21, #22, #23.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
09/24/2021   COMPLETED
 
08/05/1997   COMPLETED 9
 
06/08/1987   COMPLETED