![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||
District | Southeast | Type | County Government | ||||
County | Miami-Dade | Status | OPEN | ||||
ID | 8731649 | Latitude | 25° 44' 47.0431 | ||||
Name |
DADE CNTY METROBUS-CORAL WAY 2775 SW 74TH AVE |
Longitude | 80° 18' 54.4769 | ||||
MIAMI, FL 33155-2811 | LL Method | DPHO | |||||
Contact | SATYEN THAKAR, P.E. | LL Status | REVIEWED | ||||
Phone | (786) 469-5269 | Status Date | 12/01/2003 | ||||
Account Owner Information | |||||||
Name | MIAMI DADE TRANSIT (MDT) 701 NW 1ST CT #1700 MIAMI, FL 33136-791 |
Effective Date | 05/20/1994 | ||||
Contact | SATYEN THAKAR | ||||||
Phone | (786) 469-5269 | ||||||
SATYEN.THAKAR@MIAMIDADE.GOV | |||||||
Placard # / Date | 698369 - 07/01/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
27 | 500 | Emerg Generator Diesel (G) | 04/01/1996 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
28 | 1000 | Emerg Generator Diesel (G) | 07/01/2003 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(6) External piping monitoring (D) SPCC Plan (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
29 | 15000 | Vehicular Diesel (D) | 07/01/2020 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
30 | 15000 | Vehicular Diesel (D) | 07/01/2020 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
31 | 6000 | Unleaded Gas (B) | 07/01/2020 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
32 | 1900 | Emerg Generator Diesel (G) | 07/01/2020 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
33 | 1000 | New/Lube Oil (O) | 09/01/2022 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
34 | 1000 | New/Lube Oil (O) | 09/01/2022 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 20000 | Vehicular Diesel (D) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
10 | 1000 | Misc Petrol-Based Product (X) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
11 | 10000 | New/Lube Oil (O) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel | (E) Cathodic protection | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
12 | 6000 | Waste Oil (L) | 07/01/1980 | UNDERGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel | (E) Cathodic protection | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
13 | 1000 | Waste Oil (L) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel | (E) Cathodic protection | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
14 | 550 | Other Non Regulated (Z) | 07/01/1980 | UNDERGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel | (E) Cathodic protection | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
15 | 550 | Vehicular Diesel (D) | 07/01/1980 | UNDERGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel | (E) Cathodic protection | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
16 | 550 | Vehicular Diesel (D) | 07/01/1980 | UNDERGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel | (E) Cathodic protection | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
17 | 550 | Vehicular Diesel (D) | 07/01/1980 | UNDERGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel | (E) Cathodic protection | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
18 | 550 | Vehicular Diesel (D) | 07/01/1980 | UNDERGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel | (E) Cathodic protection | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
19 | 12000 | Vehicular Diesel (D) | 04/01/1998 | ABOVEGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (K) AST containment (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 20000 | Vehicular Diesel (D) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
20 | 12000 | Vehicular Diesel (D) | 04/01/1998 | ABOVEGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (K) AST containment (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
21 | 12000 | Vehicular Diesel (D) | 04/01/1998 | ABOVEGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (K) AST containment (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (D) SPCC Plan (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
22 | 12000 | Vehicular Diesel (D) | 04/01/1998 | ABOVEGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (K) AST containment (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
23 | 12000 | Vehicular Diesel (D) | 04/01/1998 | ABOVEGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (K) AST containment (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (D) SPCC Plan (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
24 | 12000 | New/Lube Oil (O) | 04/01/1998 | ABOVEGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (K) AST containment (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (D) SPCC Plan (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (Q) Visual inspection of ASTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
25 | 500 | New/Lube Oil (O) | 04/01/1998 | ABOVEGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
26 | 7000 | Unleaded Gas (B) | 04/01/1998 | ABOVEGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 20000 | Vehicular Diesel (D) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
4 | 20000 | Vehicular Diesel (D) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
5 | 6000 | Unleaded Gas (B) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (M) Double wall - pipe jacket |
(D) SPCC Plan (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
6 | 2000 | New/Lube Oil (O) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(F) Fiberglass clad steel | (B) Steel/galvanized metal | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
7 | 10000 | New/Lube Oil (O) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
8 | 1000 | New/Lube Oil (O) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
9 | 6000 | Waste Oil (L) | 07/01/1980 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(B) Steel/galvanized metal | (8) Manually sampled wells | |||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2023 | 01/31/2024 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2022 | 01/31/2023 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2021 | 01/31/2022 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 01/31/2020 | 01/31/2021 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 01/31/2019 | 01/31/2020 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 01/31/2018 | 01/31/2019 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/01/2017 | 01/31/2018 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 05/05/2015 | 03/18/2017 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/05/2013 | 02/05/2014 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 09/26/2011 | 09/26/2012 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 02/03/2010 | 02/03/2011 | |||||
LOCAL GOVERNMENTS - BOND RATING TEST | 11/21/2006 | 11/20/2007 | |||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
CALL | 09/01/2005 | 09/01/2005 | SUAREZ_J | 8/0 | COMPLIANCE ASSURANCE | ||
Completion Notes THEY WILL SUBMIT PICTURES TO THE DEPARTMENT BY 9/2/05 | |||||||
RRBD | 09/01/2005 | 09/22/2005 | SUAREZ_J | 8/0 | COMPLIANCE ASSURANCE | ||
Completion Notes THEY SENT PICTURES DEMONTRATING THEY TOOK CARE OF ALL THE VIOLATIONS | |||||||
NCLI | 04/28/2005 | 04/29/2005 | SUAREZ_J | 7/0 | COMPLIANCE ASSURANCE | ||
TCI | 12/16/2004 | 01/25/2005 | MINOR OUT-OF-COMPLIANCE | BUSEN_K | 8/0 | COMPLIANCE ASSURANCE | |
Completion Notes ON TANK 28, FILL PORT NEEDS TO BE MARKED YELLOW FOR DIESEL | |||||||
PDNE | 03/05/2004 | 03/05/2004 | COMPLIANCE ASSURANCE | ||||
UTII | 03/16/1995 | 03/16/1995 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||
Completion Notes Routine,Discharge (DRF), | |||||||
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Engineering Request | 01/14/2025 | Satisfied | DOLAN_J | Routine Compliance | |||
Electronic Communication | 01/14/2025 | Satisfied | DOLAN_J | Routine Compliance | |||
Electronic Communication | 01/14/2025 | Satisfied | DOLAN_J | Routine Compliance | |||
Electronic Communication | 01/14/2025 | Satisfied | DOLAN_J | Routine Compliance | |||
Record Document | 01/14/2025 | Satisfied | DOLAN_J | Routine Compliance | |||
Electronic Communication | 01/14/2025 | Satisfied | DOLAN_J | Routine Compliance | |||
Electronic Communication | 01/14/2025 | Satisfied | DOLAN_J | Routine Compliance | |||
Electronic Communication | 01/14/2025 | Satisfied | DOLAN_J | Routine Compliance | |||
Electronic Communication | 01/14/2025 | Satisfied | DOLAN_J | Routine Compliance | |||
Letter | 12/04/2024 | Satisfied | DOLAN_J | Enforcement | |||
Letter | 12/04/2024 | Satisfied | DOLAN_J | Enforcement | |||
Letter | 11/19/2024 | Satisfied | DOLAN_J | Compliance Assistance | |||
Letter | 11/19/2024 | Satisfied | DOLAN_J | Enforcement | |||
Letter | 11/19/2024 | Satisfied | DOLAN_J | Enforcement | |||
Letter | 11/19/2024 | Satisfied | DOLAN_J | Enforcement | |||
Letter | 11/19/2024 | Satisfied | DOLAN_J | Compliance Assistance | |||
Site Inspection | 11/14/2024 | Major Out of Compliance | BORGESPADRO_A | 2/0 | Installation | ||
Letter | 07/29/2024 | Satisfied | DOLAN_J | Closure | |||
TCAR | 07/29/2024 | Satisfied | DOLAN_J | Closure | |||
Discharge Reporting | 02/20/2024 | Satisfied | DOLAN_J | Discharge | |||
Letter | 02/20/2024 | Satisfied | DOLAN_J | Closure | |||
TCAR | 02/20/2024 | Incomplete | DOLAN_J | Closure | |||
TCAR | 01/17/2024 | Satisfied | DOLAN_J | Closure | |||
TCAR | 01/17/2024 | Satisfied | DOLAN_J | Closure | |||
TCAR | 01/17/2024 | Incomplete | DOLAN_J | Closure | |||
Document Management | 09/01/2023 | Satisfied | KAUFMAN_A | Enforcement | |||
TCAR | 07/19/2023 | Satisfied | KAUFMAN_A | Closure | |||
Letter | 06/26/2023 | Satisfied | WILLIAMS_CEW | Routine Compliance | |||
Document Management | 06/22/2023 | Satisfied | KAUFMAN_A | Enforcement | |||
Letter | 02/06/2023 | Satisfied | BORGESPADRO_A | Routine Compliance | |||
Enforcement Referral | 02/06/2023 | Accepted | BORGESPADRO_A | Enforcement | |||
Site Inspection | 01/30/2023 | Major Out of Compliance | BORGESPADRO_A | 8/0 | Routine Compliance | ||
Letter | 01/19/2023 | Satisfied | KAUFMAN_A | Enforcement | |||
Enforcement Referral | 01/18/2023 | Accepted | DOLAN_J | Enforcement | |||
Site Inspection | 08/04/2022 | Major Out of Compliance | KAUFMAN_A | 5/0 | Closure | ||
Letter | 08/03/2022 | Satisfied | KAUFMAN_A | Closure | |||
TCAR | 07/20/2022 | Satisfied | KAUFMAN_A | Closure | |||
Site Inspection | 07/20/2022 | In Compliance | KAUFMAN_A | 1/0 | Closure | ||
Letter | 03/08/2022 | Satisfied | SUAREZ_J | Routine Compliance | |||
Letter | 03/01/2022 | Satisfied | SUAREZ_J | Compliance Assistance | |||
Site Inspection | 10/22/2021 | Minor Out of Compliance | SUAREZ_J | 4/0 | Installation | ||
Electronic Communication | 04/10/2020 | Satisfied | SUAREZ_J | Routine Compliance | |||
Letter | 01/07/2020 | Satisfied | SUAREZ_J | Compliance Assistance | |||
Site Inspection | 12/12/2019 | Major Out of Compliance | SUAREZ_J | 7/0 | Routine Compliance | ||
Record Document | 01/05/2018 | Satisfied | MALONEY_D | Compliance Assistance | |||
Site Inspection | 11/09/2017 | In Compliance | MALONEY_D | 8/0 | Compliance Assistance | ||
Electronic Communication | 11/09/2017 | Satisfied | MALONEY_D | Compliance Assistance | |||
Site Inspection | 02/23/2017 | Major Out of Compliance | MALONEY_D | 8/0 | Routine Compliance | ||
Site Inspection | 02/20/2014 | In Compliance | BROWN_SE | 7/0 | Routine Compliance | ||
Phone Conversation | 02/18/2014 | Satisfied | BROWN_SE | Routine Compliance | |||
Site Inspection | 05/02/2013 | Minor Out of Compliance | BROWN_SE | 7/0 | Routine Compliance | ||
Electronic Communication | 05/01/2013 | Satisfied | BROWN_SE | Routine Compliance | |||
Site Inspection | 10/04/2011 | In Compliance | WILLIAMS_CEW | 7/0 | Routine Compliance | ||
Electronic Communication | 07/21/2010 | Satisfied | BROWN_SE | Non-Compliance | |||
Letter | 06/24/2010 | Satisfied | BROWN_SE | Non-Compliance | |||
Site Inspection | 06/24/2010 | Minor Out of Compliance | BROWN_SE | 7/0 | Routine Compliance | ||
Issue Document | 04/25/2007 | Satisfied | WHITE_CM | Routine Compliance | |||
Site Inspection | 04/20/2007 | Minor Out of Compliance | WHITE_CM | 8/0 | Routine Compliance | ||
Site Inspection | 07/09/2006 | In Compliance | BARATH_J | 10/18 | Routine Compliance | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
07/24/2023 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Provide missing 2022 annual operability test for the Krueger Leak Gauges for Motor Oil tank. | |||
01/18/2023 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Provide missing annual operability tests for Overfill Protection devices or methods on FDEP tanks 29, 30, 31, and 32 for 2020 through 2022. (RI) | |||
07/27/2022 | 7096 | Minor | 1.15 Records not kept until closure of system. | Provide Department with all records for Tanks #19, #20, #21, #22, #23. | |||
07/27/2022 | 7094 | Minor | 1.13 Permanent records not available within 5 working days notice. | Provide Department with records for Tanks #19, #20, #21, #22, #23. | |||
07/27/2022 | 7005 | Minor | 1.5 Notification of installation, closure, or change in service status not received in required timeframes. | Provide documentation that Department was notified prior to tank removal for Tanks #19, #20, #21, #22, #23. | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
09/24/2021 | COMPLETED | ||||||
08/05/1997 | COMPLETED | 9 | |||||
06/08/1987 | COMPLETED | ||||||