![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Manatee | Status | OPEN | ||||||||
ID | 8732457 | Latitude | 27° 25' 7.3097 | ||||||||
Name |
GAS EXPRESS 6829 15TH ST E |
Longitude | 82° 32' 47.0273 | ||||||||
SARASOTA, FL 34243 | LL Method | DGPS | |||||||||
Contact | AKBAR BARMANWALLA | LL Status | REVIEWED | ||||||||
Phone | (727) 642-4847 | Status Date | 11/05/2003 | ||||||||
Account Owner Information | |||||||||||
Name | AABAAD & AABAAD CORP 580 LAKE CYPRESS CIR OLDSMAR, FL 34677 |
Effective Date | 07/22/2011 | ||||||||
Contact | AKBAR BARMANWALLA | ||||||||||
Phone | (727) 642-4847 | ||||||||||
AKBARBARMANWALLA@YAHOO.COM | |||||||||||
Placard # / Date | 698240 - 07/01/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | AABAAD & AABAAD CORP 580 LAKE CYPRESS CIR OLDSMAR, FL 34677 |
Effective Date | 07/22/2011 | ||||||||
Contact | AKBAR BARMANWALLA | ||||||||||
Phone | (727) 642-4847 | ||||||||||
AKBARBARMANWALLA@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Unleaded Gas (B) | 05/01/2011 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 12000 | Unleaded Gas (B) | 05/01/2011 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel | (D) External protective coating | (7) Automatically sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 10000 | Vehicular Diesel (D) | 05/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel | (D) External protective coating | (7) Automatically sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 10000 | Unleaded Gas (B) | 05/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Leaded Gas (A) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel | (D) External protective coating | (7) Automatically sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 05/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 07/22/2023 | 07/22/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/22/2021 | 07/22/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/22/2019 | 07/22/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 07/20/2017 | 07/22/2018 | ACE | ||||||||
INSURANCE | 07/22/2016 | 07/22/2017 | ACE | ||||||||
INSURANCE | 07/22/2014 | 07/22/2015 | ACE | ||||||||
INSURANCE | 07/22/2012 | 07/22/2013 | ACE | ||||||||
INSURANCE | 07/21/2011 | 07/21/2012 | ACE | ||||||||
INSURANCE | 10/08/2008 | 10/08/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 12/05/2005 | 12/05/2005 | COMPLIANCE ASSURANCE | ||||||||
NCLI | 11/28/2005 | 11/28/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/22/2005 | 11/28/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | MARK TRETHEWEY | /3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/21/2004 | 12/22/2004 | IN-COMPLIANCE | SEGO | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 07/21/2004 | 08/03/2004 | MINOR OUT-OF-COMPLIANCE | SEGO | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 04/22/2004 | 04/22/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | SEGO | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/04/2003 | 07/11/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 12/19/2002 | 01/08/2003 | MINOR OUT-OF-COMPLIANCE | SEGO | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/19/2002 | 12/22/2004 | IN-COMPLIANCE | FIELDS | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 03/21/2001 | 03/29/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 03/07/2001 | 03/21/2001 | MINOR OUT-OF-COMPLIANCE | FIELDS | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 08/10/1999 | 04/26/2004 | IN-COMPLIANCE | BROWNING | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Phone Conversation | 05/30/2024 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Issue Document | 05/30/2024 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Phone Conversation | 05/30/2024 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Site Inspection | 05/30/2024 | Major Out of Compliance | TRETHEWEY_MB_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 05/30/2024 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Phone Conversation | 05/30/2024 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Letter | 05/30/2024 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Letter | 11/30/2022 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Site Inspection | 11/30/2022 | Minor Out of Compliance | TRETHEWEY_MB_1 | 0/2 | Complaint | ||||||
Phone Conversation | 03/08/2022 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Site Inspection | 03/08/2022 | Minor Out of Compliance | TRETHEWEY_MB_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 03/08/2022 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Letter | 03/08/2022 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Enforcement Referral | 09/08/2020 | Accepted | TRETHEWEY_MB_1 | Enforcement | |||||||
Letter | 02/10/2020 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Issue Document | 02/10/2020 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Phone Conversation | 02/10/2020 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Site Inspection | 02/10/2020 | Major Out of Compliance | TRETHEWEY_MB_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 04/26/2018 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Enforcement Tracking | 04/26/2018 | Closed Without Enforcement | BROWNLEE_S | Enforcement | |||||||
Issue Document | 04/25/2018 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Site Inspection | 04/25/2018 | In Compliance | TRETHEWEY_MB_1 | 0/2 | Compliance Assistance | ||||||
Electronic Communication | 12/20/2017 | Satisfied | BROWNLEE_S | Enforcement | |||||||
Phone Conversation | 12/19/2017 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Phone Conversation | 12/19/2017 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Phone Conversation | 12/19/2017 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Enforcement Referral | 12/18/2017 | Accepted | TRETHEWEY_MB_1 | Enforcement | |||||||
Letter | 12/12/2017 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Site Inspection | 12/12/2017 | Minor Out of Compliance | TRETHEWEY_MB_1 | 0/2 | Compliance Assistance | ||||||
Record Document | 07/18/2017 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Record Document | 07/18/2017 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Letter | 03/29/2017 | Satisfied | TRETHEWEY_MB_1 | Non-Compliance | |||||||
Phone Conversation | 03/29/2017 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Site Inspection | 03/29/2017 | Major Out of Compliance | TRETHEWEY_MB_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 03/29/2017 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Issue Document | 01/22/2015 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Site Inspection | 01/22/2015 | In Compliance | TRETHEWEY_MB_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 04/30/2013 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Site Inspection | 04/30/2013 | In Compliance | TRETHEWEY_MB_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 05/17/2012 | In Compliance | TRETHEWEY_MB_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 07/29/2011 | In Compliance | TRETHEWEY_MB_1 | 0/2 | Installation | ||||||
Site Inspection | 04/27/2011 | Minor Out of Compliance | TRETHEWEY_MB_1 | 0/3 | Closure | ||||||
Letter | 04/27/2011 | Satisfied | TRETHEWEY_MB_1 | Non-Compliance | |||||||
Site Inspection | 12/14/2010 | Minor Out of Compliance | TRETHEWEY_MB_1 | 0/3 | Routine Compliance | ||||||
Letter | 12/14/2010 | Satisfied | TRETHEWEY_MB_1 | Non-Compliance | |||||||
Enforcement Tracking | 03/17/2010 | Closed With Enforcement | MEETZE_A | Enforcement | |||||||
Electronic Communication | 01/26/2010 | Major Out of Compliance | MEETZE_A | Enforcement | |||||||
Record Document | 01/26/2010 | Major Out of Compliance | MEETZE_A | Enforcement | |||||||
Electronic Communication | 01/26/2010 | Major Out of Compliance | MEETZE_A | Enforcement | |||||||
Phone Conversation | 01/22/2010 | Major Out of Compliance | MEETZE_A | Enforcement | |||||||
Phone Conversation | 01/15/2010 | Major Out of Compliance | MEETZE_A | Enforcement | |||||||
Meeting | 01/04/2010 | Satisfied | REEDER_JH_1 | Non-Compliance | |||||||
Enforcement Referral | 11/20/2009 | Accepted | MEETZE_A | Enforcement | |||||||
Site Inspection | 09/09/2009 | Major Out of Compliance | TRETHEWEY_MB_1 | 0/3 | Routine Compliance | ||||||
Letter | 09/09/2009 | Satisfied | TRETHEWEY_MB_1 | Non-Compliance | |||||||
Site Inspection | 11/17/2008 | Minor Out of Compliance | TRETHEWEY_MB_1 | 0/3 | Routine Compliance | ||||||
Letter | 11/17/2008 | Satisfied | TRETHEWEY_MB_1 | Non-Compliance | |||||||
Enforcement Tracking | 01/09/2008 | Closed With Enforcement | MEETZE_A | Enforcement | |||||||
Site Inspection | 11/26/2007 | In Compliance | TRETHEWEY_MB_1 | 0/3 | Routine Compliance | ||||||
Record Document | 08/22/2007 | Satisfied | MEETZE_A | Enforcement | |||||||
Record Document | 08/22/2007 | Satisfied | REEDER_JH_1 | Non-Compliance | |||||||
Enforcement Referral | 08/02/2007 | Accepted | MEETZE_A | Enforcement | |||||||
Enforcement Referral Activity - OLD | 04/06/2007 | Terminated | CULBRETH_L | Enforcement | |||||||
Record Document | 03/01/2007 | Satisfied | REEDER_JH_1 | Non-Compliance | |||||||
Letter | 02/22/2007 | Satisfied | REEDER_JH_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/09/2007 | Satisfied | REEDER_JH_1 | Routine Compliance | |||||||
Letter | 12/15/2006 | Satisfied | TRETHEWEY_MB_1 | Non-Compliance | |||||||
Site Inspection | 12/15/2006 | Major Out of Compliance | TRETHEWEY_MB_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | REEDER_JH_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/30/2024 | 6075 | Minor | 2.9 Records of current training certificates for designated Class A, B, and C operators shall be maintained for as long as the operators are designated for that facility not kept. | No certificates have been provided. | |||||||
05/30/2024 | 6002 | Minor | 2.1 Operator Training records not available. | Provide proof of operator training and designated class. | |||||||
05/30/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Invoice provided for work performed on 5/23/2024, tests not available. provide Manatee County NRD with copies of the results. | |||||||
05/30/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Within 90 days, have the required tests performed and provide Manatee County NRD with copies of the results. | |||||||
05/30/2024 | 6045 | Minor | 4.3 Double-walled spill containment system does not allow for interstitial monitoring. | Repair all spill bucket gauges. | |||||||
05/30/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Within 90 days secure the piping and dispenser. | |||||||
05/30/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Invoice provided for work performed on 5/23/2024, tests not available. Provide Manatee County NRD with copies of test results. | |||||||
05/30/2024 | 6043 | Minor | 4.13 Fillbox covers not marked according to requirements. | Repaint covers in proper code. | |||||||
05/30/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Invoice provided for work performed on 5/23/2024, tests not available. Provide Manatee County NRD with copies of the results. NOTE: spill buckets were tested as single-wall, hydrostatic. Should be vacuum tested. | |||||||
05/30/2024 | 6061 | SNC-B | 4.12 Release detection devices for integral piping do not meet general standards. | Invoice provided for work performed on 5/23/2024, tests not available. Provide Manatee County NRD with copies of the test results. | |||||||
03/08/2022 | 6002 | Minor | 2.1 Operator Training records not available. | Provide Manatee County PNRD with copies of required certificates. | |||||||
03/08/2022 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Ensure that all release detection devices are tested each year and retain results for review. | |||||||
02/10/2020 | 4001 | Minor | 2.2 Operator certification requirements not met. | Provide Manatee County PNRD with copies of the required certificates. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
09/17/1997 | INACTIVE | 30 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
04/17/1990 | INACTIVE | 30 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
12/30/1987 | INACTIVE | 30 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||