Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/17/2025 Last Data Refresh: 05/16/2025 Report Generated from DOPPLER | |||||||
District | Southeast | Type | County Government | ||||
County | Broward | Status | OPEN | ||||
ID | 8732770 | Latitude | 26° 15' 42.7932 | ||||
Name |
BROWARD CNTY-MASS TRANSIT 3201 W COPANS RD |
Longitude | 80° 9' 57.384 | ||||
POMPANO BEACH, FL 33069-5140 | LL Method | DPHO | |||||
Contact | BOB CAMINITI | LL Status | REVIEWED | ||||
Phone | (954) 357-8436 | Status Date | 12/02/2009 | ||||
Account Owner Information | |||||||
Name | BROWARD CNTY MASS TRANSIT AUTH 5440 RAVENSWOOD RD FORT LAUDERDALE, FL 33312 |
Effective Date | 06/02/1992 | ||||
Contact | BOB CAMINITI | ||||||
Phone | (954) 357-8436 | ||||||
RCAMINITI@BROWARD.ORG | |||||||
Placard # / Date | 683941 - 06/06/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
17 | 1500 | Emerg Generator Diesel (G) | 01/01/2008 | ABOVEGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel (I) Double wall |
(A) Abv, no soil contact (I) Suction piping system (Z) DEP approved piping |
(Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
18 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
19 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
20 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
21 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
22 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
23 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
24 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
25 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
26 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
27 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
28 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
29 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
30 | 35000 | Vehicular Diesel (D) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
31 | 35000 | Emerg Generator Diesel (G) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
32 | 12000 | Unleaded Gas (B) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
33 | 12000 | Unleaded Gas (B) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
34 | 12000 | Other Non Regulated (Z) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(B) Steel/galvanized metal (I) Suction piping system (J) Pressurized piping system (M) Double wall - pipe jacket |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
35 | 12000 | Misc Petrol-Based Product (X) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(B) Steel/galvanized metal (I) Suction piping system (J) Pressurized piping system (M) Double wall - pipe jacket |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
36 | 12000 | New/Lube Oil (O) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(B) Steel/galvanized metal (I) Suction piping system (J) Pressurized piping system (M) Double wall - pipe jacket |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
37 | 12000 | Waste Oil (L) | 10/01/2010 | UNDERGROUND | In Service (U) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(B) Steel/galvanized metal (M) Double wall - pipe jacket |
(3) Electronic monitor pipe sumps (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 10000 | Unleaded Gas (B) | 12/01/1983 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
10 | 10000 | New/Lube Oil (O) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall | (2) Visual inspect pipe sumps (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
11 | 10000 | Waste Oil (L) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall | (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
12 | 10000 | Misc Petrol-Based Product (X) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall | (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
13 | 6000 | Fuel Oil - Distribution (N) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall | (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
14 | 500 | Misc Petrol-Based Product (X) | 07/01/1984 | ABOVEGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (Z) DEP approved piping | (I) Not required | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
15 | 300 | Misc Petrol-Based Product (X) | 07/01/1984 | ABOVEGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (Z) DEP approved piping | (I) Not required | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
16 | 1500 | Misc Petrol-Based Product (X) | 07/01/1984 | ABOVEGROUND | Deleted - Data Error (D) | ||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (Z) DEP approved piping | (I) Not required | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 48000 | Vehicular Diesel (D) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
4 | 48000 | Vehicular Diesel (D) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (M) Manual tank gauging - USTs (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
5 | 48000 | Vehicular Diesel (D) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
6 | 48000 | Vehicular Diesel (D) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
7 | 48000 | Vehicular Diesel (D) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
8 | 48000 | Vehicular Diesel (D) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
9 | 48000 | Vehicular Diesel (D) | 07/01/1984 | UNDERGROUND | Removed from Site (B) | ||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 10000 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (8) Manually sampled wells (G) Electronic line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
INSURANCE | 09/28/2019 | 09/28/2021 | INDIAN HARBOR INSURANCE COMPANY | ||||
INSURANCE | 09/28/2015 | 09/28/2019 | INDIAN HARBOR INSURANCE COMPANY | ||||
INSURANCE | 09/28/2014 | 09/28/2015 | LIBERTY SURPLUS INSURANCE CORP | ||||
INSURANCE | 11/12/2012 | 11/12/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||
INSURANCE | 11/04/2010 | 09/28/2011 | LIBERTY SURPLUS INSURANCE CORP | ||||
INSURANCE | 09/28/2010 | 09/28/2011 | LIBERTY MUTUAL | ||||
INSURANCE | 09/28/2010 | 09/28/2011 | LIBERTY SURPLUS INSURANCE CORP | ||||
INSURANCE | 10/08/2009 | 10/09/2010 | LIBERTY SURPLUS INSURANCE CORP | ||||
INSURANCE | 02/28/1994 | 02/28/1997 | PLUS | ||||
INSURANCE | 02/28/1991 | 02/28/1994 | FPLIPA | ||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
DCCR | 10/19/2005 | 11/16/2005 | THEISEN_MM | 0/0 | DISCHARGE PROJECT | ||
Completion Notes CLEANUP NOTIFICATION LETTER ISSUED BASED ON DRF AND SOIL AND GROUNDWATER LABORATORY RESULTS. | |||||||
DRFR | 10/17/2005 | 11/16/2005 | THEISEN_MM | 0/0 | DISCHARGE PROJECT | ||
Completion Notes DRF RECEIVED 10/17/2005 DOCUMENTING SOIL AND GROUNDWATER CONTAMINATION FROM HYDRAULIC OIL LIFT. | |||||||
SCOE | 07/22/2005 | 07/27/2005 | LISTICK_JP | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes SFCO WITH P2 PROJECT; C&E $250 PAID 7-5-05; P2 FINAL REPORT DUE 3-1-06. | |||||||
SCOI | 06/23/2005 | 06/23/2005 | LISTICK_JP | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes SCOI $10,000 P2 PROJECT + $250 C&E = $10,250 SETTLEMENT AGREEMENT | |||||||
TCI | 06/17/2005 | 07/08/2005 | IN-COMPLIANCE | CHOW_Y | 1/13 | COMPLIANCE ASSURANCE | |
Completion Notes TANK 14 DOES NOT EXIST. | |||||||
FR | 06/09/2005 | 06/09/2005 | IN-COMPLIANCE | LISTICK_JP | 0/0 | COMPLIANCE ASSURANCE | |
Completion Notes FILE REVIEW CONDUCTED REGARDING RECONSILIATION FOR USED OIL TANK. | |||||||
TCR | 04/15/2005 | 05/24/2005 | MINOR OUT-OF-COMPLIANCE | RAHRIG_T | 0/13 | COMPLIANCE ASSURANCE | |
Completion Notes NOTE: WASTE OIL TANK CANNOT BE MONITORED FOR INVENTORY INPUTS, DUE TO FREQUENCY AND # OF DELIVERIES VIA MAINTENANCE BAYS. BUT DECREASE IN PRODUCT AND WATER SHOULD BE KEPT VIA DAILY RECORDS. MWS USED FOR RELEASE DETECTION, SITE SUITABILITY EXEMPTION | |||||||
TCI | 05/20/2004 | 06/14/2004 | MINOR OUT-OF-COMPLIANCE | BUSEN_K | 1/13 | COMPLIANCE ASSURANCE | |
DCCR | 01/03/2003 | 11/09/2004 | LOPEZ_B | 0/0 | DISCHARGE PROJECT | ||
Completion Notes BASED ON ANALYTICAL RESULTS FOR SOIL SAMPLES COLLECTED DURING CLOSURE OF HYDRAULIC LIFT, DISCHARGE WAS CONFIRMED. | |||||||
WLI | 12/09/2002 | 12/10/2002 | NICOLE KUEHLE | 0/0 | COMPLIANCE ASSURANCE | ||
EPI | 12/09/2002 | 12/10/2002 | NICOLE KUEHLE | 0/0 | COMPLIANCE ASSURANCE | ||
RRBD | 09/10/2002 | 12/10/2002 | NICOLE KUEHLE | 0/0 | COMPLIANCE ASSURANCE | ||
NCLI | 08/26/2002 | 09/24/2002 | NICOLE KUEHLE | 0/0 | COMPLIANCE ASSURANCE | ||
RRBD | 05/09/2002 | 09/24/2002 | NICOLE KUEHLE | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes INF FOR INVENTORY INCIDENT-CLAIM LINE FEEDING GENERATOR IS NOT MONITORED | |||||||
TCR | 05/07/2002 | 09/24/2002 | MINOR OUT-OF-COMPLIANCE | NICOLE KUEHLE | 0/13 | COMPLIANCE ASSURANCE | |
RRBD | 05/01/2002 | 09/24/2002 | NICOLE KUEHLE | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes HARD COPY OF 4/29/2002 RRBD | |||||||
RRBD | 04/29/2002 | 09/24/2002 | NICOLE KUEHLE | 0/13 | COMPLIANCE ASSURANCE | ||
NCLI | 04/15/2002 | 04/29/2002 | NICOLE KUEHLE | 0/0 | COMPLIANCE ASSURANCE | ||
SRRV | 02/21/2002 | 11/09/2004 | LOPEZ_B | 0/0 | DISCHARGE PROJECT | ||
Completion Notes ANALYTICAL RESULTS OF SOIL SAMPLES COLLECTED BY RON KING DURING CLOSURE/REPAIR OF A HYDRAULIC LIFT IDENTIFY EXCEEDANCE OF PETROLEUM CONSTITUENTS. | |||||||
TCI | 02/07/2002 | 04/29/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | NICOLE KUEHLE | 0/13 | COMPLIANCE ASSURANCE | |
TIN | 03/26/2001 | 03/29/2001 | IN-COMPLIANCE | COOPER_RA | 0/13 | COMPLIANCE ASSURANCE | |
CASV | 08/25/2000 | 09/08/2000 | SINGERS | 0/13 | COMPLIANCE ASSURANCE | ||
TCR | 06/30/2000 | 07/12/2000 | IN-COMPLIANCE | BROWN_SE | 0/0 | COMPLIANCE ASSURANCE | |
Completion Notes BROWN_SE | |||||||
TCI | 03/16/2000 | 03/20/2000 | MINOR OUT-OF-COMPLIANCE | BROWN_SE | 0/13 | COMPLIANCE ASSURANCE | |
UTCI | 08/19/1996 | 08/19/1996 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||
Completion Notes Routine, | |||||||
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Electronic Communication | 12/12/2024 | Satisfied | WILLIAMS_CEW | Routine Compliance | |||
Enforcement Referral | 11/12/2024 | Accepted | WILLIAMS_CEW | Enforcement | |||
Enforcement Referral | 11/12/2024 | Accepted | WILLIAMS_CEW | Enforcement | |||
Electronic Communication | 10/15/2024 | Satisfied | WILLIAMS_CEW | Routine Compliance | |||
Site Inspection | 02/19/2024 | Major Out of Compliance | WILLIAMS_CEW | 1/19 | Routine Compliance | ||
Electronic Communication | 10/19/2021 | Satisfied | WILLIAMS_CEW | Routine Compliance | |||
Letter | 03/11/2021 | Satisfied | WILLIAMS_CEW | Compliance Assistance | |||
Site Inspection | 01/26/2021 | Minor Out of Compliance | WILLIAMS_CEW | 1/19 | Routine Compliance | ||
Letter | 02/01/2018 | Satisfied | MALONEY_D | Routine Compliance | |||
Site Inspection | 01/30/2018 | In Compliance | MALONEY_D | 1/19 | Routine Compliance | ||
Site Inspection | 03/26/2015 | In Compliance | WILLIAMS_CEW | 1/19 | Routine Compliance | ||
Discharge Reporting | 08/09/2013 | Satisfied | DRICE_GK_1 | Discharge | |||
Discharge Reporting | 08/09/2013 | Satisfied | DRICE_GK_1 | Discharge | |||
Discharge Reporting | 08/09/2013 | Satisfied | DRICE_GK_1 | Discharge | |||
Discharge Reporting | 08/09/2013 | Satisfied | DRICE_GK_1 | Discharge | |||
Site Inspection | 04/18/2013 | In Compliance | DOLAN_J | 1/19 | Routine Compliance | ||
Site Inspection | 08/08/2011 | In Compliance | BROWN_KP | 1/19 | Routine Compliance | ||
Discharge Reporting | 02/02/2011 | Satisfied | DOLAN_J | Discharge | |||
Site Inspection | 02/02/2011 | In Compliance | DOLAN_J | 1/0 | Non-Compliance | ||
Record Document | 01/20/2011 | Satisfied | DOLAN_J | Routine Compliance | |||
Site Inspection | 11/01/2010 | In Compliance | SINGER_SD_1 | 1/20 | Installation | ||
Letter | 09/30/2010 | Satisfied | DOLAN_J | Non-Compliance | |||
Site Inspection | 08/10/2010 | Minor Out of Compliance | DOLAN_J | 1/0 | Discharge | ||
Site Inspection | 08/09/2010 | Minor Out of Compliance | DOLAN_J | 1/0 | Routine Compliance | ||
Document Management | 07/20/2010 | Complete | GOMEZ_AE_1 | Discharge | |||
Document Management | 07/20/2010 | Complete | GOMEZ_AE_1 | Discharge | |||
Document Management | 07/20/2010 | Complete | GOMEZ_AE_1 | Discharge | |||
Document Management | 07/20/2010 | Complete | GOMEZ_AE_1 | Discharge | |||
Letter | 07/15/2010 | Satisfied | GOMEZ_AE_1 | Closure | |||
Document Management | 07/15/2010 | Complete | GOMEZ_AE_1 | Closure | |||
TCAR | 07/15/2010 | Satisfied | GOMEZ_AE_1 | Closure | |||
Site Inspection | 07/12/2010 | In Compliance | SINGER_SD_1 | 1/0 | Discharge | ||
Site Inspection | 07/12/2010 | In Compliance | SINGER_SD_1 | 1/0 | Discharge | ||
Site Inspection | 07/12/2010 | In Compliance | SINGER_SD_1 | 1/0 | Discharge | ||
Site Inspection | 07/12/2010 | In Compliance | SINGER_SD_1 | 1/0 | Discharge | ||
Discharge Reporting | 01/15/2010 | Satisfied | RAHRIG_T | Discharge | |||
Site Inspection | 12/22/2009 | In Compliance | SINGER_SD_1 | 4/13 | Closure | ||
Site Inspection | 10/21/2009 | In Compliance | DOLAN_J | 3/0 | Routine Compliance | ||
Record Document | 09/16/2009 | Satisfied | GOMEZ_AE_1 | Routine Compliance | |||
Record Document | 09/14/2009 | Satisfied | GOMEZ_AE_1 | Routine Compliance | |||
Record Document | 01/30/2009 | Satisfied | RAHRIG_T | Routine Compliance | |||
Record Document | 09/12/2008 | Satisfied | GOMEZ_AE_1 | Routine Compliance | |||
Site Inspection | 02/06/2008 | In Compliance | COOPER_RA_1 | 3/13 | Non-Compliance | ||
Letter | 01/28/2008 | Satisfied | COOPER_RA_1 | Non-Compliance | |||
Site Inspection | 01/28/2008 | Minor Out of Compliance | COOPER_RA_1 | 3/13 | Installation | ||
Record Document | 06/04/2007 | Satisfied | DOLAN_J | Non-Compliance | |||
Meeting | 06/04/2007 | Satisfied | DOLAN_J | Routine Compliance | |||
Phone Conversation | 06/01/2007 | Satisfied | RAHRIG_T | Discharge | |||
Site Inspection | 06/01/2007 | Minor Out of Compliance | DOLAN_J | 3/13 | Discharge | ||
Record Document | 05/18/2007 | Satisfied | DRICE_GK_1 | Discharge | |||
Site Inspection | 04/30/2007 | Minor Out of Compliance | CUBINSKI_K | 0/13 | Routine Compliance | ||
Site Inspection | 07/09/2006 | In Compliance | BARATH_J | 3/13 | Routine Compliance | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
02/15/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Please provide the triennial integrity test for the dispenser sumps and the transition sumps. | |||
02/15/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Please repair the Veedor Root release detection system | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
01/22/2010 | COMPLETED | 9 | |||||
01/14/2010 | COMPLETED | 9 | |||||
11/20/2009 | COMPLETED | 9 | |||||
10/12/2009 | COMPLETED | 9 | |||||
05/15/2007 | COMPLETED | ||||||
10/06/2005 | COMPLETED | ||||||
02/21/2002 | COMPLETED | ||||||
04/25/1988 | INACTIVE | 9 | |||||
04/25/1988 | INACTIVE | 9 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-PARTIAL | ||||