District Southeast   Type    Retail Station
 
County Miami-Dade   Status    OPEN
 
ID 8733527   Latitude    25° 51' 59.0437
 
Name MEDLEY U-GAS
10100 NW 89TH AVE
Longitude    80° 20' 32.4352
  MIAMI, FL 33178-1320 LL Method    DPHO
 
Contact FREDDY LAVERDE   LL Status    REVIEWED
 
Phone (305) 888-4611   Status Date    09/19/2016
 
Account Owner Information
 
Name TROPIC OIL CO
10002 NW 89th Ave
Medley, FL 33178-1409
Effective Date    12/17/2021
 
Contact FREDDY LAVERDE / MARK BUMGARDNER
 
Phone (305) 888-4611
 
Email FREDDY.LAVERDE@PARKLANDUSA.COM
  Placard # / Date    680794 - 06/05/2024
Property Owner Information
 
Name TROPIC OIL CO
10002 NW 89th Ave
Medley, FL 33178-1409
Effective Date    12/17/2021
 
Contact FREDDY LAVERDE / MARK BUMGARDNER
 
Phone (305) 888-4611
 
Email FREDDY.LAVERDE@PARKLANDUSA.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
5 18000 Vehicular Diesel (D) 10/01/2011 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(M) Spill containment bucket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
 
 
Tank Tank Size Content Installed Placement Status
6 18000 Unleaded Gas (B) 10/01/2011 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(I) Double wall
(L) Compartmented
(M) Spill containment bucket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
 
 
Tank Tank Size Content Installed Placement Status
1 12000 Unleaded Gas (B) 08/01/1979 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
2 12000 Vehicular Diesel (D) 08/01/1979 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(E) Fiberglass
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
4 12000 Vehicular Diesel (D) 01/01/1991 UNDERGROUND Closed In Place (A)
 
Constructions   Pipings Monitorings
(F) Fiberglass clad steel
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Vehicular Diesel (D) ABOVEGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (A) Abv, no soil contact (D) SPCC Plan
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   01/01/2023 01/01/2024 SCOTTSDALE INSURANCE COMPANY
INSURANCE   03/01/2021 03/01/2022 ASPEN SPECIALTY INSURANCE COMPANY
INSURANCE   02/28/2018 03/01/2019 ASPEN SPECIALTY INSURANCE COMPANY
INSURANCE   02/23/2017 12/24/2018 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   02/23/2016 02/23/2017 LIBERTY SURPLUS INSURANCE CORP
INSURANCE   02/23/2015 02/23/2016 ILLINOIS UNION
INSURANCE   02/23/2014 02/23/2015 ILLINOIS UNION
INSURANCE   02/23/2013 02/23/2014 ILLINOIS UNION
INSURANCE   02/23/2012 02/23/2013 ILLINOIS UNION
INSURANCE   02/23/2009 02/23/2010 ACE
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCR 04/19/2006 04/24/2006 MINOR OUT-OF-COMPLIANCE PADRON, J 0/3 COMPLIANCE ASSURANCE
 
TCI 01/30/2006 02/01/2006 MINOR OUT-OF-COMPLIANCE PADRON, J 0/3 COMPLIANCE ASSURANCE
 
RRBD 04/11/2005 04/19/2005 COMPLIANCE ASSURANCE
 
TCR 03/22/2005 03/31/2005 SIGNIFICANT OUT-OF-COMPLIANCE PADRON, J 0/3 COMPLIANCE ASSURANCE
 
RRBD 03/10/2005 03/31/2005 COMPLIANCE ASSURANCE
 
TCI 01/07/2005 01/18/2005 SIGNIFICANT OUT-OF-COMPLIANCE PADRON, J 0/3 COMPLIANCE ASSURANCE
 
RRBD 10/21/2004 10/25/2004 MINOR OUT-OF-COMPLIANCE PADRON, J 0/3 COMPLIANCE ASSURANCE
 
TCI 06/25/2004 06/30/2004 SIGNIFICANT OUT-OF-COMPLIANCE DASHTAKI, K /3 COMPLIANCE ASSURANCE
 
TIN 05/26/2004 05/28/2004 IN-COMPLIANCE PADRON, J 0/1 COMPLIANCE ASSURANCE
 
TIN 11/20/2003 12/02/2003 IN-COMPLIANCE PADRON, J 0/3 COMPLIANCE ASSURANCE
 
TCR 05/19/2003 05/21/2003 IN-COMPLIANCE PADRON, J 0/1 COMPLIANCE ASSURANCE
 
TCI 04/14/2003 04/22/2003 MINOR OUT-OF-COMPLIANCE PADRON, J 0/3 COMPLIANCE ASSURANCE
 
TCR 08/20/2002 08/23/2002 IN-COMPLIANCE PADRON, J 0/3 COMPLIANCE ASSURANCE
 
TCI 06/28/2002 07/05/2002 MINOR OUT-OF-COMPLIANCE PADRON_J 0/3 COMPLIANCE ASSURANCE
 
TCI 05/21/2001 06/12/2001 IN-COMPLIANCE DASHTAKI, K 0/3 COMPLIANCE ASSURANCE
 
RRBD 01/31/2000 02/17/2000 SANTANA, E 0/0 COMPLIANCE ASSURANCE
 
TCI 09/29/1999 10/01/1999 SIGNIFICANT OUT-OF-COMPLIANCE SANTANA, E 0/3 COMPLIANCE ASSURANCE
 
TCR 05/13/1999 05/27/1999 IN-COMPLIANCE SANTANA, E 0/3 COMPLIANCE ASSURANCE
 
TIN 05/06/1999 05/27/1999 MINOR OUT-OF-COMPLIANCE RONDON, K 0/3 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 11/30/2023 Satisfied PAAN_GE_1 Compliance Assistance
 
Electronic Communication 11/30/2023 Satisfied PAAN_GE_1 Routine Compliance
 
Site Inspection 11/30/2023 Major Out of Compliance PAAN_GE_1 0/2 Routine Compliance
 
Letter 02/15/2022 Satisfied RODRIGUEZ_F Compliance Assistance
 
Site Inspection 02/11/2022 In Compliance RODRIGUEZ_F 0/2 Compliance Assistance
 
Letter 08/31/2021 Satisfied RODRIGUEZ_F Compliance Assistance
 
Site Inspection 08/30/2021 Major Out of Compliance RODRIGUEZ_F 0/2 Routine Compliance
 
Electronic Communication 08/26/2021 Satisfied RODRIGUEZ_F Routine Compliance
 
Electronic Communication 01/22/2019 Satisfied CABRERA_VE_1 Compliance Assistance
 
Letter 01/22/2019 Satisfied CABRERA_VE_1 Compliance Assistance
 
Letter 01/22/2019 Satisfied CABRERA_VE_1 Compliance Assistance
 
Enforcement Tracking 01/22/2019 Closed Without Enforcement CHIRINO_AM_1 Enforcement
 
Site Inspection 12/31/2018 Major Out of Compliance CABRERA_VE_1 0/2 Routine Compliance
 
Electronic Communication 12/20/2018 Satisfied CABRERA_VE_1 Routine Compliance
 
Site Inspection 09/28/2016 In Compliance CRUZ_I_2 0/2 Non-Compliance
 
Site Inspection 09/23/2016 Minor Out of Compliance CRUZ_I_2 0/2 Routine Compliance
 
Letter 09/23/2016 Satisfied CRUZ_I_2 Non-Compliance
 
Phone Conversation 09/12/2016 Satisfied CRUZ_I_2 Routine Compliance
 
Electronic Communication 09/12/2016 Satisfied CRUZ_I_2 Routine Compliance
 
Phone Conversation 11/18/2014 Satisfied RUNTE_C_3 Routine Compliance
 
Site Inspection 10/21/2014 In Compliance RUNTE_C_3 0/2 Routine Compliance
 
Emergency Preparedness Information 10/21/2014 Satisfied RUNTE_C_3 Routine Compliance
 
Letter 04/21/2014 Satisfied MAS_JR_1 Closure
 
TCAR 01/27/2014 Satisfied MAS_JR_1 Closure
 
TCAR 07/16/2013 Satisfied MAS_JR_1 Closure
 
TCAR 03/28/2013 Incomplete MAS_JR_1 Closure
 
TCAR 03/26/2013 Incomplete MAS_JR_1 Closure
 
Site Inspection 03/14/2013 In Compliance RUNTE_C_3 0/2 Non-Compliance
 
Emergency Preparedness Information 01/25/2013 Satisfied RUNTE_C_3 Routine Compliance
 
Letter 01/25/2013 Satisfied RUNTE_C_3 Non-Compliance
 
Site Inspection 01/25/2013 Minor Out of Compliance RUNTE_C_3 0/2 Routine Compliance
 
Phone Conversation 01/14/2013 Satisfied RUNTE_C_3 Routine Compliance
 
TCAR 12/26/2012 Incomplete MAS_JR_1 Closure
 
Document Management 09/26/2012 Complete CHIRINO_AM_1 Enforcement
 
Enforcement Referral 09/24/2012 Accepted CHIRINO_AM_1 Enforcement
 
Document Management 09/24/2012 Complete CHIRINO_AM_1 Enforcement
 
Record Document 07/18/2012 Satisfied CHIRINO_AM_1 Non-Compliance
 
Enforcement Tracking 07/18/2012 Closed With Enforcement CHIRINO_AM_1 Enforcement
 
Site Inspection 05/23/2012 In Compliance PADRON_JE_1 0/2 Non-Compliance
 
Site Inspection 11/29/2011 Major Out of Compliance PADRON_JE_1 0/2 Closure
 
Site Inspection 11/29/2011 Major Out of Compliance PADRON_JE_1 0/2 Installation
 
Site Inspection 11/02/2011 Major Out of Compliance PADRON_JE_1 0/3 Installation
 
Site Inspection 10/28/2011 Major Out of Compliance PADRON_JE_1 0/1 Installation
 
Site Inspection 10/25/2011 Major Out of Compliance PADRON_JE_1 0/1 Installation
 
Site Inspection 10/07/2011 Major Out of Compliance CAJUSTE_PJ_1 0/1 Installation
 
Site Inspection 09/26/2011 Major Out of Compliance PADRON_JE_1 0/3 Closure
 
Site Inspection 09/19/2011 Major Out of Compliance PADRON_JE_1 0/3 Non-Compliance
 
Letter 08/19/2011 Satisfied PADRON_JE_1 Non-Compliance
 
Site Inspection 08/18/2011 Major Out of Compliance PADRON_JE_1 0/3 Non-Compliance
 
Emergency Preparedness Information 07/26/2011 Satisfied PADRON_JE_1 Routine Compliance
 
Site Inspection 07/26/2011 Major Out of Compliance PADRON_JE_1 0/3 Routine Compliance
 
Letter 07/26/2011 Satisfied PADRON_JE_1 Non-Compliance
 
Site Inspection 09/10/2010 Major Out of Compliance PADRON_JE_1 0/3 Routine Compliance
 
Document Management 07/21/2010 Complete CHIRINO_AM_1 Enforcement
 
Enforcement Referral 07/19/2010 Accepted CHIRINO_AM_1 Enforcement
 
Site Inspection 02/17/2010 In Compliance PADRON_JE_1 0/3 Routine Compliance
 
Document Management 02/08/2010 Complete CORREA_LI_1 Routine Compliance
 
Site Inspection 01/08/2010 Minor Out of Compliance CORREA_LI_1 0/3 Non-Compliance
 
Meeting 01/04/2010 Satisfied PADRON_JE_1 Routine Compliance
 
Site Inspection 03/12/2009 Minor Out of Compliance PADRON_JE_1 0/3 Routine Compliance
 
Letter 03/12/2009 Satisfied PADRON_JE_1 Non-Compliance
 
Letter 03/12/2007 Satisfied PADRON_JE_1 Non-Compliance
 
Site Inspection 03/12/2007 Minor Out of Compliance PADRON_JE_1 0/3 Non-Compliance
 
Site Inspection 02/22/2007 Minor Out of Compliance PADRON_JE_1 0/3 Non-Compliance
 
Letter 02/22/2007 Satisfied PADRON_JE_1 Non-Compliance
 
Emergency Preparedness Information 02/15/2007 Satisfied PADRON_JE_1 Routine Compliance
 
Letter 01/29/2007 Satisfied PADRON_JE_1 Non-Compliance
 
Site Inspection 01/29/2007 Major Out of Compliance PADRON_JE_1 0/3 Routine Compliance
 
Emergency Preparedness Information 09/22/2006 Satisfied PADRON_JE_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
11/29/2023 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Repair or replace Diesel and Premium Fill Port Spill Buckets.
 
11/29/2023 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Provide current and passing Integrity Testing for Spill Buckets.
 
11/29/2023 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Provide current and passing Integrity Testing for Dispenser Liners.
 
11/29/2023 6073 Minor 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. Pump out or remove liquid from Dispenser Liners and Spill Buckets, such that they are emptied.
 
11/29/2023 6072 Minor 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. Provide current and passing Integrity Testing for STP Sumps.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
01/07/2005   COMPLETED 9
 
01/10/1994   COMPLETED 10 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE
 
06/06/1991   COMPLETED 9 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE