![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Santa Rosa | Status | OPEN | ||||||||
ID | 8734093 | Latitude | 30° 37' 58.6371 | ||||||||
Name |
CIRCLE K #2704968 5462 STEWART ST |
Longitude | 87° 2' 33.6601 | ||||||||
MILTON, FL 32570-4279 | LL Method | DGPS | |||||||||
Contact | CHRIS BAVUSO | LL Status | REVIEWED | ||||||||
Phone | (850) 316-6673 | Status Date | 10/27/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 25 W CEDAR ST STE M Pensacola, FL 32502 |
Effective Date | 01/13/2010 | ||||||||
Contact | IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON | ||||||||||
Phone | (850) 454-1070 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697408 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CIRCLE K STORES INC 25 W CEDAR ST STE M Pensacola, FL 32502 |
Effective Date | 01/13/2010 | ||||||||
Contact | IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON | ||||||||||
Phone | (850) 454-1070 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 16000 | Unleaded Gas (B) | 08/01/2005 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Unleaded Gas (B) | 05/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 8000 | Unleaded Gas (B) | 05/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 8000 | Unleaded Gas (B) | 05/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Vehicular Diesel (D) | 05/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 12000 | Vehicular Diesel (D) | 08/01/2005 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/30/2023 | 08/28/2024 | |||||||||
GUARANTEE | 04/25/2021 | 08/27/2022 | |||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2016 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2011 | 12/01/2013 | CHUBB | ||||||||
INSURANCE | 12/17/2009 | 12/01/2011 | CHUBB | ||||||||
INSURANCE | 12/16/2007 | 12/16/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 12/15/2005 | 12/16/2005 | IN-COMPLIANCE | JOSEPH D. THAYER | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO VIOLATIONS FOUND THIS INSPECTION | |||||||||||
TIN | 08/23/2005 | 09/09/2005 | IN-COMPLIANCE | JOHN S.S TEVENSON | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes INSTALLATION OF TWO (2) NEWBERRY STI ACT-100 UST'S WITH AMERON DW RIGID FRP PIPE TO EXISTING ENVIRON MPD LINERS. LAURITZ SPANN PCC045053. CLOSURE ASSESSMENT DUE IN 60 DAYS. SYSTEM APPROVED. | |||||||||||
TCI | 11/09/2004 | 11/10/2004 | IN-COMPLIANCE | JOSEPH D. THAYER | 0/4 | COMPLIANCE ASSURANCE | |||||
TIN | 11/03/2004 | 11/05/2004 | IN-COMPLIANCE | JOSEPH D. THAYER | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes MONTIE ROBERTS EXPLAINED A TREE FELL DIRECTLY ON DIESEL DISPENSER. GROOVIN NOOVIN REPLACED DISPENSER AND TESTED LINES. THE LINES WERE NOT DAMAGED. | |||||||||||
TCI | 12/18/2003 | 12/29/2003 | IN-COMPLIANCE | JOSEPH D. THAYER | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 02/11/2003 | 02/26/2003 | IN-COMPLIANCE | REGINALD W. BRADLEY | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 06/06/2002 | 06/13/2002 | IN-COMPLIANCE | REGINALD W. BRADLEY | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 12/07/2001 | 01/07/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | REGINALD W. BRADLEY | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/25/2001 | 04/12/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 01/23/2001 | 01/29/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | THAYER_JD | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 08/18/1999 | 09/01/1999 | IN-COMPLIANCE | THAYER_JD | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 06/26/2024 | Accepted | PAYNE_CL_1 | Enforcement | |||||||
Letter | 06/25/2024 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Record Document | 06/25/2024 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Record Document | 06/24/2024 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Record Document | 06/24/2024 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Letter | 03/11/2024 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Site Inspection | 03/11/2024 | Major Out of Compliance | PAYNE_CL_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 03/08/2024 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Electronic Communication | 03/05/2024 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Electronic Communication | 03/05/2024 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Electronic Communication | 03/05/2024 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Document Management | 10/20/2023 | Satisfied | PAYNE_CL_1 | Incident | |||||||
Letter | 11/28/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
TCAR | 11/28/2022 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Letter | 11/28/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 11/28/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Record Document | 11/08/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 11/08/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Document Management | 08/17/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 08/17/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 07/29/2022 | Satisfied | WILSON_ML_1 | Component Installation | |||||||
Site Inspection | 07/22/2022 | In Compliance | PAYNE_CL_1 | 0/2 | Component Installation | ||||||
Letter | 01/05/2022 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Tracking | 01/05/2022 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 01/03/2022 | Accepted | WILSON_ML_1 | Enforcement | |||||||
Electronic Communication | 12/28/2021 | Satisfied | MERRITT_S | Compliance Assistance | |||||||
Record Document | 12/22/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 12/13/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 12/13/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 12/10/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
TCAR | 12/10/2021 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Letter | 12/10/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 12/10/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 10/28/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 10/28/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 10/28/2021 | Major Out of Compliance | WILSON_ML_1 | 0/2 | Component Installation | ||||||
Site Inspection | 10/28/2021 | Major Out of Compliance | WILSON_ML_1 | 0/2 | Component Closure | ||||||
Letter | 10/28/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 10/28/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 10/21/2021 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Letter | 10/05/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 10/05/2021 | Major Out of Compliance | PAYNE_CL_1 | 0/2 | Routine Compliance | ||||||
Issue Document | 10/05/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 10/04/2021 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Issue Document | 10/16/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 10/16/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 10/14/2019 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Issue Document | 09/09/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 09/09/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 09/09/2019 | Minor Out of Compliance | PAYNE_CL_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 09/04/2019 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 03/02/2017 | In Compliance | PAYNE_CL_1 | 0/2 | Installation | ||||||
Site Inspection | 03/02/2017 | In Compliance | PAYNE_CL_1 | 0/2 | Closure | ||||||
Site Inspection | 02/27/2017 | In Compliance | PAYNE_CL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/13/2015 | Satisfied | FOXWORTH_S_1 | Routine Compliance | |||||||
Site Inspection | 01/13/2015 | In Compliance | FOXWORTH_S_1 | 0/2 | Routine Compliance | ||||||
Document Management | 10/06/2014 | Complete | FOXWORTH_S_1 | Incident | |||||||
Incident | 10/06/2014 | Has not led to Discharge | FOXWORTH_S_1 | Incident | |||||||
Emergency Preparedness Information | 01/23/2013 | Satisfied | FOXWORTH_S_1 | Routine Compliance | |||||||
Record Document | 01/23/2013 | Satisfied | FOXWORTH_S_1 | Routine Compliance | |||||||
Site Inspection | 01/23/2013 | In Compliance | FOXWORTH_S_1 | 0/2 | Routine Compliance | ||||||
Record Document | 02/15/2012 | Satisfied | PORTER_AJ_1 | Non-Compliance | |||||||
Record Document | 10/31/2011 | Satisfied | PORTER_AJ_1 | Non-Compliance | |||||||
Letter | 09/20/2011 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/14/2011 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Site Inspection | 09/14/2011 | Major Out of Compliance | PORTER_AJ_1 | 0/2 | Routine Compliance | ||||||
Incident | 11/16/2010 | Has not led to Discharge | THAYER_JD_1 | Incident | |||||||
Site Inspection | 11/02/2010 | In Compliance | THAYER_JD_1 | 0/2 | Non-Compliance | ||||||
Document Management | 09/30/2010 | Complete | THAYER_JD_1 | Incident | |||||||
Letter | 09/22/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/21/2010 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
Site Inspection | 09/21/2010 | Minor Out of Compliance | THAYER_JD_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/20/2010 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
Discharge Reporting | 03/16/2010 | Satisfied | THAYER_JD_1 | Discharge | |||||||
Document Management | 02/08/2010 | Complete | THAYER_JD_1 | Discharge | |||||||
Meeting | 01/26/2010 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Site Inspection | 07/20/2009 | Minor Out of Compliance | THAYER_JD_1 | 0/2 | Routine Compliance | ||||||
Record Document | 07/02/2009 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
Record Document | 10/10/2008 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Site Inspection | 10/09/2008 | Minor Out of Compliance | THAYER_JD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/30/2008 | In Compliance | STEVENSON_JS | 0/2 | Non-Compliance | ||||||
Site Inspection | 05/16/2008 | In Compliance | STEVENSON_JS | 0/2 | Routine Compliance | ||||||
Record Document | 05/08/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Letter | 04/11/2008 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
Site Inspection | 03/21/2008 | Minor Out of Compliance | STEVENSON_JS | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/07/2007 | In Compliance | THAYER_JD_1 | 0/6 | Routine Compliance | ||||||
Record Document | 04/25/2007 | Satisfied | THAYER_JD_1 | Closure | |||||||
TCAR | 04/25/2007 | Complete | THAYER_JD_1 | Closure | |||||||
TCAR | 04/09/2007 | Rejected | THAYER_JD_1 | Closure | |||||||
Record Document | 02/22/2007 | Satisfied | THAYER_JD_1 | Discharge | |||||||
Site Inspection | 02/22/2007 | In Compliance | THAYER_JD_1 | 0/6 | Discharge | ||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Phone Conversation | 02/05/2007 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
Record Document | 10/12/2006 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | THAYER_JD_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/25/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Provide Superior Service's post repair report, pictures post repair, primary and secondary tank testing results post repair. Email: Charles.Payne@flhealth.gov | |||||||
06/25/2024 | 6015 | Minor | 4.3 Incident investigation not completed within 14 days, and/or no DRF or written confirmation received at the end of the 14-day investigation period. | Conduct an incident investigation to determine if a discharge has occurred. Provide the primary and secondary tank testing no more than 30 days prior to repair. If primary and secondary tank testing for the premium tank was not performed no more than 30 days prior to tank repair, sampling will be required to determine if a discharge occurred. Email: Charles.Payne@flhealth.gov | |||||||
03/11/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have a technician replace or adjust the overfill device to the correct height. Email a copy of the invoice and passing test results to the inspector. Email: Charles.Payne@flhealth.gov | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/21/2007 | COMPLETED | ||||||||||
06/27/1989 | COMPLETED | 72 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||