Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Nassau | Status | OPEN | ||||||||
ID | 8735798 | Latitude | 30° 37' 10.1482 | ||||||||
Name |
R&S Gas Mart Inc 3331 S FLETCHER AVE |
Longitude | 81° 26' 29.4857 | ||||||||
FERNANDINA BEACH, FL 32034-4307 | LL Method | DGPS | |||||||||
Contact | Wissam Ajjan | LL Status | REVIEWED | ||||||||
Phone | (904) 310-6163 | Status Date | 11/18/2003 | ||||||||
Account Owner Information | |||||||||||
Name | A1A EXPRESS DISCOUNT INC 3331 S FLETCHER AVE Fernandina Beach, FL 32034 |
Effective Date | 04/23/2012 | ||||||||
Contact | Wissam Ajjan | ||||||||||
Phone | (904) 343-3024 | ||||||||||
WESSAMAJJAN@YAHOO.COM | |||||||||||
Placard # / Date | 695622 - 06/26/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | A1A EXPRESS DISCOUNT INC 3331 S FLETCHER AVE Fernandina Beach, FL 32034 |
Effective Date | 04/23/2012 | ||||||||
Contact | Wissam Ajjan | ||||||||||
Phone | (904) 343-3024 | ||||||||||
WESSAMAJJAN@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 8000 | Unleaded Gas (B) | 12/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 8000 | Unleaded Gas (B) | 12/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Vehicular Diesel (D) | 10/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 10/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 10/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 10/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 04/10/2024 | 04/10/2025 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/10/2023 | 04/10/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/10/2022 | 04/10/2023 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/10/2021 | 04/10/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/10/2020 | 04/10/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/10/2019 | 04/10/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/10/2018 | 04/10/2019 | ACE | ||||||||
INSURANCE | 04/10/2017 | 04/10/2018 | ACE | ||||||||
INSURANCE | 04/10/2015 | 04/10/2017 | ACE | ||||||||
INSURANCE | 06/10/2014 | 06/10/2015 | ACE | ||||||||
INSURANCE | 04/10/2012 | 04/10/2013 | ACE | ||||||||
INSURANCE | 11/01/2010 | 11/01/2011 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2009 | 11/01/2010 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
INSURANCE | 11/01/2008 | 11/01/2009 | ENDURANCE AMERICAN SPECIALTY INS CO | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 03/21/2006 | 03/21/2006 | IN-COMPLIANCE | MCNEIL | 0/4 | COMPLIANCE ASSURANCE | |||||
CWOE | 03/21/2006 | 03/21/2006 | MCNEIL | 0/4 | COMPLIANCE ASSURANCE | ||||||
NCLI | 12/19/2005 | 12/19/2005 | MCNEIL | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/08/2005 | MINOR OUT-OF-COMPLIANCE | MCNEIL | 0/4 | COMPLIANCE ASSURANCE | ||||||
RRBD | 10/12/2004 | 10/15/2004 | COMPLIANCE ASSURANCE | ||||||||
TCI | 09/21/2004 | 09/29/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | VELEZ | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 09/24/2003 | 10/02/2003 | IN-COMPLIANCE | GODWINMD | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/26/2002 | 10/01/2002 | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/22/2002 | 08/26/2002 | MINOR OUT-OF-COMPLIANCE | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/23/2001 | 12/10/2001 | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ALL VIOLATIONS CORRECTED | |||||||||||
NCLI | 08/08/2001 | 09/04/2001 | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/27/2001 | 08/06/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 11/07/2000 | 12/20/2000 | IN-COMPLIANCE | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 10/22/1999 | 11/05/1999 | IN-COMPLIANCE | TURNER_MS | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 03/06/2025 | Major Out of Compliance | VILLEGASAVILA_OE_1 | 0/2 | Routine Compliance | ||||||
Letter | 03/06/2025 | Satisfied | VILLEGASAVILA_OE_1 | Compliance Assistance | |||||||
Electronic Communication | 02/18/2025 | Satisfied | VILLEGASAVILA_OE_1 | Compliance Assistance | |||||||
Letter | 06/12/2023 | Satisfied | MCKINLEY_D | Enforcement | |||||||
Enforcement Tracking | 06/12/2023 | Closed Without Enforcement | MCKINLEY_D | Enforcement | |||||||
Electronic Communication | 05/09/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 05/05/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 04/14/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 03/15/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Site Inspection | 02/21/2023 | Major Out of Compliance | ROBBINS_JL_1 | 0/2 | Routine Compliance | ||||||
Letter | 02/21/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Letter | 02/20/2023 | Satisfied | MCKINLEY_D | Enforcement | |||||||
Electronic Communication | 01/20/2023 | Satisfied | ROBBINS_JL_1 | Compliance Assistance | |||||||
Electronic Communication | 12/20/2022 | Satisfied | MCKINLEY_D | Enforcement | |||||||
Electronic Communication | 12/19/2022 | Satisfied | MCKINLEY_D | Enforcement | |||||||
Phone Conversation | 11/15/2022 | Satisfied | MCKINLEY_D | Enforcement | |||||||
Enforcement Referral | 08/30/2021 | Accepted | GAINEY_H_1 | Enforcement | |||||||
Electronic Communication | 08/05/2021 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Electronic Communication | 06/25/2021 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Letter | 05/21/2021 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Site Inspection | 05/21/2021 | Major Out of Compliance | BRANCH_BL_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 05/05/2021 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Electronic Communication | 05/05/2021 | Satisfied | BRANCH_BL_1 | Compliance Assistance | |||||||
Letter | 09/18/2018 | Satisfied | MONDO_PW_1 | Compliance Assistance | |||||||
Electronic Communication | 08/29/2018 | Satisfied | MONDO_PW_1 | Routine Compliance | |||||||
Letter | 08/29/2018 | Satisfied | MONDO_PW_1 | Compliance Assistance | |||||||
Site Inspection | 08/27/2018 | Major Out of Compliance | MONDO_PW_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/09/2018 | Satisfied | MONDO_PW_1 | Routine Compliance | |||||||
Site Inspection | 08/08/2016 | In Compliance | GREGORY_HM_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 08/08/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Phone Conversation | 08/01/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Electronic Communication | 07/22/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Electronic Communication | 07/22/2016 | Satisfied | GREGORY_HM_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 12/27/2014 | Satisfied | SHULAW_BJ_1 | Routine Compliance | |||||||
Site Inspection | 12/27/2014 | In Compliance | SHULAW_BJ_1 | 0/2 | Routine Compliance | ||||||
Record Document | 04/11/2013 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Issue Document | 03/14/2013 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Letter | 03/13/2013 | Satisfied | KASSEES_RP_1 | Non-Compliance | |||||||
Site Inspection | 03/13/2013 | Minor Out of Compliance | KASSEES_RP_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/06/2013 | Satisfied | KASSEES_RP_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 04/29/2011 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
Issue Document | 04/29/2011 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
Site Inspection | 04/29/2011 | In Compliance | MCNEIL_AP_1 | 0/2 | Routine Compliance | ||||||
TCAR | 07/15/2010 | Satisfied | MCNEIL_AP_1 | Closure | |||||||
Letter | 07/15/2010 | Satisfied | MCNEIL_AP_1 | Closure | |||||||
Site Inspection | 04/21/2010 | In Compliance | MCNEIL_AP_1 | 0/2 | Routine Compliance | ||||||
Letter | 04/15/2010 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Record Document | 03/30/2010 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Letter | 03/11/2010 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 03/11/2010 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
TCAR | 01/13/2010 | Incomplete | MCNEIL_AP_1 | Closure | |||||||
Letter | 01/13/2010 | Major Out of Compliance | MCNEIL_AP_1 | Closure | |||||||
Letter | 01/11/2010 | Major Out of Compliance | MCNEIL_AP_1 | Non-Compliance | |||||||
Site Inspection | 01/07/2010 | In Compliance | MCNEIL_AP_1 | 0/2 | Installation | ||||||
Issue Document | 12/16/2009 | Satisfied | MCNEIL_AP_1 | Closure | |||||||
Site Inspection | 12/14/2009 | In Compliance | MCNEIL_AP_1 | 0/4 | Closure | ||||||
Site Inspection | 04/09/2009 | In Compliance | MCNEIL_AP_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 02/20/2009 | In Compliance | TOWLE_M | 0/4 | Non-Compliance | ||||||
Site Inspection | 03/14/2008 | In Compliance | MCNEIL_AP_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 04/18/2007 | In Compliance | MCNEIL_AP_1 | 0/4 | Non-Compliance | ||||||
Letter | 03/07/2007 | Satisfied | MCNEIL_AP_1 | Non-Compliance | |||||||
Site Inspection | 03/07/2007 | Minor Out of Compliance | MCNEIL_AP_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | MCNEIL_AP_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/06/2025 | 6014 | SNC-B | 4.2 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | The facility must submit an Incident Notification Form (INF). The responsible party must determine if a discharge to the environment occurred or not. Incident investigation and resolution documentation must be provided. | |||||||
03/06/2025 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | The facility must provide the EQD inspector with Part P from 2023 to 2025. | |||||||
03/06/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | The facility must remove liquid from the regular STP Sump and dispose it properly. The responsible party must determine the source of the liquid. Ensure to return sensor status to normal. Post-liquid removal integrity testing may be required. Sampling may be required. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/27/1988 | COMPLETED | 50 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||