![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/11/2025 Last Data Refresh: 05/10/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Fuel user/Non-retail | ||||||||
County | Pasco | Status | OPEN | ||||||||
ID | 8736806 | Latitude | 28° 11' 26.641 | ||||||||
Name |
AJAX PAVING INDUSTRIES PLT #5 11603 STATE ROAD 54 |
Longitude | 82° 37' 22.4175 | ||||||||
ODESSA, FL 33556-3461 | LL Method | DPHO | |||||||||
Contact | GREG HOGUE | LL Status | REVIEWED | ||||||||
Phone | (727) 375-5780 | Status Date | 08/25/2003 | ||||||||
Account Owner Information | |||||||||||
Name | AJAX PAVING INDUSTRIES OF FL LLC ONE AJAX DR Nokomis, FL 34275-3624 |
Effective Date | 05/23/2001 | ||||||||
Contact | VINCE HAFELI | ||||||||||
Phone | (941) 486-3600 | ||||||||||
VHAFELI@AJAXPAVING.COM | |||||||||||
Placard # / Date | 680849 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | AJAX PAVING INDUSTRIES OF FL LLC ONE AJAX DR Nokomis, FL 34275-3624 |
Effective Date | 05/23/2001 | ||||||||
Contact | VINCE HAFELI | ||||||||||
Phone | (941) 486-3600 | ||||||||||
VHAFELI@AJAXPAVING.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Other Non Regulated (Z) | 01/01/1999 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Ultra Low Sulfur Diesel (I) | 08/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (D) External protective coating (I) Suction piping system (J) Pressurized piping system |
(6) External piping monitoring (D) SPCC Plan (F) Monitor dbl wall tank space (G) Electronic line leak detector (Q) Visual inspection of ASTs (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 30000 | Other Non Regulated (Z) | 09/01/2008 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 30000 | Other Non Regulated (Z) | 09/01/2008 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 8000 | Vehicular Diesel (D) | 08/01/1988 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4468 | Vehicular Diesel (D) | 02/01/1994 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(Q) Visual inspection of ASTs | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 20000 | Fuel Oil - Onsite Heat (M) | 08/01/1988 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 20000 | Other Non Regulated (Z) | 08/01/1988 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 2000 | Fuel Oil - Onsite Heat (M) | 08/01/1988 | ABOVEGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(I) Not required | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 06/25/2024 | 06/25/2025 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 06/25/2020 | 06/25/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 06/25/2019 | 06/25/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 06/25/2018 | 06/25/2019 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/25/2017 | 06/25/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/25/2016 | 06/25/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/25/2015 | 06/25/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/25/2014 | 06/25/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/25/2012 | 06/25/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/25/2011 | 06/25/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/25/2010 | 06/25/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/25/2009 | 06/25/2010 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 09/13/2005 | 09/23/2005 | IN-COMPLIANCE | CONDOLEON, GEORGE | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/08/2004 | 09/09/2004 | IN-COMPLIANCE | RODRIGUEZ, IVAN | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/04/2003 | 09/26/2003 | MINOR OUT-OF-COMPLIANCE | RODRIGUEZ, IVAN | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 08/01/2002 | 09/09/2002 | IN-COMPLIANCE | RODRIGUEZ, IVAN | 2/0 | COMPLIANCE ASSURANCE | |||||
TCR | 05/04/2001 | 05/16/2001 | IN-COMPLIANCE | HARRIS | 2/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 04/30/2001 | 04/30/2001 | HARRIS | 2/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/24/2001 | 04/30/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | HARRIS | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 04/26/2000 | 04/27/2000 | IN-COMPLIANCE | PETERSON | 2/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 06/08/1999 | 06/08/1999 | PETERSON_JE | 2/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 06/04/1999 | 06/08/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | PETERSON_JE | 2/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 05/06/2025 | Accepted | TUCKER_SX_1 | Enforcement | |||||||
Meeting | 04/22/2025 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||||||
Site Inspection | 04/19/2025 | Major Out of Compliance | TUCKER_SX_1 | 1/0 | Routine Compliance | ||||||
Letter | 04/19/2025 | Satisfied | TUCKER_SX_1 | Compliance Assistance | |||||||
Electronic Communication | 03/31/2025 | Satisfied | TUCKER_SX_1 | Routine Compliance | |||||||
Record Document | 04/06/2021 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 04/06/2021 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Record Document | 04/06/2021 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 04/02/2021 | Major Out of Compliance | JUARISTIC_GK_1 | 1/0 | Routine Compliance | ||||||
Letter | 04/02/2021 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Electronic Communication | 03/25/2021 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Record Document | 07/31/2018 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 07/31/2018 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Letter | 05/03/2018 | Satisfied | JUARISTIC_GK_1 | Compliance Assistance | |||||||
Site Inspection | 05/03/2018 | Major Out of Compliance | JUARISTIC_GK_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 04/24/2018 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Electronic Communication | 07/31/2015 | Satisfied | JUARISTIC_GK_1 | Routine Compliance | |||||||
Site Inspection | 07/31/2015 | In Compliance | JUARISTIC_GK_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 12/03/2013 | In Compliance | JUARISTIC_GK_1 | 1/0 | Non-Compliance | ||||||
Site Inspection | 07/12/2013 | Major Out of Compliance | LONGEN_JL_1 | 1/0 | Routine Compliance | ||||||
Letter | 07/12/2013 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Site Inspection | 07/14/2011 | In Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Record Document | 08/02/2010 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 07/23/2010 | Minor Out of Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Letter | 07/23/2010 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Record Document | 10/19/2009 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Letter | 09/17/2009 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 09/17/2009 | Minor Out of Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 09/02/2008 | In Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 10/09/2007 | In Compliance | CONDOLEON_GJ_1 | 1/0 | Closure | ||||||
Site Inspection | 09/14/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 1/0 | Installation | ||||||
Letter | 09/14/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 09/14/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 03/26/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 1/0 | Closure | ||||||
Site Inspection | 03/09/2007 | Minor Out of Compliance | CONDOLEON_GJ_1 | 1/0 | Installation | ||||||
Letter | 03/09/2007 | Satisfied | CONDOLEON_GJ_1 | Non-Compliance | |||||||
Site Inspection | 09/06/2006 | In Compliance | CONDOLEON_GJ_1 | 2/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
04/22/2025 | 6020 | SNC-A | 4.9 Actions not taken immediately to contain, remove, and abate the discharge. | The storage tank system component that is discharging shall be isolated from the system within three days of discovery of the discharge. If the component cannot be isolated from the system, within three days of determining that the component is discharging, the storage tank system shall not operate, dispense, nor accept deliveries, or shall be placed out-of-service in accordance with Rule 62-761.800, F.A.C., until the component can be repaired or replaced. | |||||||
04/19/2025 | 7011 | Minor | 1.9 Appropriate paperwork for financial responsibility improperly completed or maintained. | Submit financial responsibility forms from 9/1/21 -6/25/24 to this program office. Additionally submit Part D for 2024-2025. | |||||||
04/19/2025 | 7075 | SNC-B | 3.1 Not repaired component or piping which has not caused a discharge or release. | Repair/place audible alarm panel and submit invoice/work order for completed repair along with operability test to this program office. | |||||||
04/19/2025 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Submit test results for Krueger gauge for 2024 and 2025. Additionally, submit passing Krueger gauge testing for 2022 or submit work order for repair/replacement and operability test for new gauge installed. | |||||||
04/19/2025 | 7012 | SNC-B | 3.3 Incident investigation not initiated within 24-hours (or by next business day) to determine if discharge occurred. | Submit results of investigation (INF) along with invoice/work order for correction to this program office. | |||||||
04/19/2025 | 7040 | SNC-B | 3.8 Overfill protection not provided. Fuel transfer not monitored. Alarms not installed. | Ensure annual operability testing does not exceed 12 months. This violation will be resolved with a non-compliance letter. | |||||||
04/19/2025 | 7040 | SNC-B | 3.8 Overfill protection not provided. Fuel transfer not monitored. Alarms not installed. | Submit results for overfill protection device testing for 2024. If records are not available, acknowledge such and the program office will accept the test results conducted on 1/2/25. Once acknowledged, the violation will be resolved with a non-compliance letter. | |||||||
04/19/2025 | 7065 | SNC-B | 1.6 Storage tank system not visually inspected once a month. | Submit monthly visual inspections from April 2021 through March 2025. Additionally, ensure the date is written on each monthly visual inspection. Observed the (3) monthly visuals submitted only showing month and year. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/15/2000 | COMPLETED | 29 | |||||||||
06/14/2000 | COMPLETED | 29 | |||||||||