Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||
Cover Page Report | |||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||
District | South | Type | Bulk Storage Facility | ||||
County | Collier | Status | OPEN | ||||
ID | 8839176 | Latitude | 26° 25' 5 | ||||
Name |
COMBS OIL CO IMMOKALEE BULK FACILITY 525 E MAIN ST |
Longitude | 81° 24' 40 | ||||
IMMOKALEE, FL 34142 | LL Method | DPHO | |||||
Contact | DENNIS R COMBS | LL Status | REVIEWED | ||||
Phone | (239) 774-2666 | Status Date | 06/30/2015 | ||||
Account Owner Information | |||||||
Name | COMBS OIL CO 76 INDUSTRIAL BLVD NAPLES, FL 34104 |
Effective Date | 02/18/1988 | ||||
Contact | DENNIS COMBS | ||||||
Phone | (239) 774-2666 | ||||||
COMBSOIL@EARTHLINK.NET | |||||||
Placard # / Date | 692965 - 06/21/2024 | ||||||
No Property Owner Information Found | |||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1R1 | 12000 | Vehicular Diesel (D) | 02/01/1988 | UNDERGROUND | Out of Service (T) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (B) Internal lining (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2R1 | 12000 | Ethanol E10 (8) | 02/01/1988 | UNDERGROUND | Out of Service (T) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (B) Internal lining (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3R1 | 10000 | Vehicular Diesel (D) | 02/01/1988 | UNDERGROUND | Out of Service (T) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (B) Internal lining (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
4R1 | 5000 | Unleaded Gas (B) | 02/01/1988 | UNDERGROUND | Out of Service (T) | ||
Constructions | Pipings | Monitorings | |||||
(A) Ball check valve (B) Internal lining (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (S) DEP approved containment |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners (L) Bulk product system |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
1 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
10 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
2 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
3 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
4 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
5 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
6 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
7 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
8 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Tank | Tank Size | Content | Installed | Placement | Status | ||
9 | 4000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||
Constructions | Pipings | Monitorings | |||||
(C) Steel | (D) External protective coating | (Y) Unknown | |||||
Insurance Documents | |||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||
INSURANCE | 09/12/2021 | 09/12/2022 | MT. HAWLEY INSURANCE CO | ||||
INSURANCE | 09/12/2018 | 09/12/2019 | ILLINOIS UNION INSURANCE COMPANY | ||||
INSURANCE | 09/12/2017 | 09/12/2018 | COMMERCE & INDUSTRY | ||||
INSURANCE | 09/12/2016 | 09/12/2017 | COMMERCE & INDUSTRY | ||||
INSURANCE | 09/12/2015 | 09/12/2016 | COMMERCE & INDUSTRY | ||||
INSURANCE | 09/12/2014 | 09/12/2015 | ZURICH-AMERICAN | ||||
INSURANCE | 09/12/2014 | 09/12/2015 | COMMERCE & INDUSTRY | ||||
INSURANCE | 09/12/2013 | 09/12/2014 | ZURICH-AMERICAN | ||||
INSURANCE | 09/12/2010 | 09/12/2011 | ZURICH-AMERICAN | ||||
INSURANCE | 09/12/2009 | 09/12/2010 | ZURICH-AMERICAN | ||||
INSURANCE | 09/12/2008 | 09/12/2009 | ZURICH-AMERICAN | ||||
Legacy Compliance Activity Information | |||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |
CWOE | 10/07/2004 | 10/07/2004 | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | ||
Completion Notes CLOSED #1117 | |||||||
RRBD | 10/07/2004 | 10/07/2004 | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | ||
Completion Notes ANNUAL TESTING RESULTS REC'D | |||||||
TCI | 10/04/2004 | 10/07/2004 | MINOR OUT-OF-COMPLIANCE | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes SUMP SENSORS ARE OVER-DUE FOR ANNUAL OPERABILITY TESTS | |||||||
TCI | 08/21/2003 | 08/21/2003 | IN-COMPLIANCE | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes PIPING: DW FIBERGLASS...BULK...ANNUAL MECHANICAL LINE LEAK DETECTOR TEST NOT REQUIRED | |||||||
TCI | 07/11/2002 | 07/11/2002 | IN-COMPLIANCE | KOLANDA | 4/0 | COMPLIANCE ASSURANCE | |
Completion Notes SUMPS HAVE SENSORS..BUT NOT ABLE TO PRINT MONTHLY STATUS.. | |||||||
TCR | 09/18/2001 | 09/20/2001 | IN-COMPLIANCE | KOLANDA,S | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes OVERFILL PROTECTION->BALL IN CAGE AT PRIMARY FILL PORT...NOT AT REMOTE FILL | |||||||
CWOE | 09/18/2001 | 09/20/2001 | KOLANDA,S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes OVERFILL PROTECTION VERIFIED...BOOTS PULLED BACK TO ALLOW INTERSTITIAL MONITORING FOR DW PIPING...& PROOF OF ANNUAL OPERABILITY TEST FOR SUMP SENSORS | |||||||
NCLI | 08/20/2001 | 08/22/2001 | KOLANDA,S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes ROUTINE NCLI | |||||||
TCI | 08/14/2001 | 08/14/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | KOLANDA,S | 0/4 | COMPLIANCE ASSURANCE | |
Completion Notes PARTIAL RDRL LOGS BEING MAINTAINED (NO PRINT-OUTS FOR SUMP SENSORS) | |||||||
LTR | 07/23/2001 | 07/24/2001 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||
Completion Notes LTR TO FDEP WITH SUPPORTING EVIDENCE FOR A SRCO FOR THE 12/18/92 DISCHARGE (RE-REPORT OT THE 5/30/91 DISCHARGE) | |||||||
TCI | 08/10/2000 | 08/31/2000 | IN-COMPLIANCE | SILLERY_W | 0/4 | COMPLIANCE ASSURANCE | |
TCI | 08/25/1999 | 08/27/1999 | IN-COMPLIANCE | SILLERY_W | 0/4 | COMPLIANCE ASSURANCE | |
Compliance Activity Information | |||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||
Enforcement Referral | 11/20/2024 | Rejected | WINKLER_MG_2 | Enforcement | |||
Enforcement Referral | 11/12/2024 | Accepted | STANDIFORD_JA | Enforcement | |||
Site Inspection | 10/25/2023 | Major Out of Compliance | STANDIFORD_JA | 0/4 | Routine Compliance | ||
Electronic Communication | 08/29/2022 | Satisfied | WINKLER_MG_2 | Compliance Assistance | |||
Site Inspection | 10/29/2021 | Major Out of Compliance | WINKLER_MG_2 | 0/4 | Routine Compliance | ||
Letter | 10/29/2021 | Satisfied | WINKLER_MG_2 | Compliance Assistance | |||
Incident | 01/05/2021 | Has not led to Discharge | HERNANDEZ_N_5 | Incident | |||
Electronic Communication | 12/18/2020 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||
Electronic Communication | 12/08/2020 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||
Record Document | 08/28/2019 | Satisfied | BATES_TD_1 | Compliance Assistance | |||
Letter | 08/13/2019 | Satisfied | BATES_TD_1 | Compliance Assistance | |||
Site Inspection | 08/13/2019 | Major Out of Compliance | BATES_TD_1 | 0/4 | Routine Compliance | ||
Document Management | 08/02/2019 | Satisfied | BATES_TD_1 | Incident | |||
Letter | 07/20/2017 | Satisfied | STANDIFORD_JA_2 | Compliance Assistance | |||
Site Inspection | 07/18/2017 | In Compliance | STANDIFORD_JA_2 | 0/4 | Compliance Assistance | ||
Letter | 02/28/2017 | Satisfied | STANDIFORD_JA_2 | Non-Compliance | |||
Site Inspection | 01/31/2017 | Minor Out of Compliance | STANDIFORD_JA_2 | 0/4 | Routine Compliance | ||
Site Inspection | 05/28/2015 | Major Out of Compliance | SNYDERBURN_PJ_2 | 0/4 | Routine Compliance | ||
Letter | 05/28/2015 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Site Inspection | 01/20/2015 | In Compliance | SPARKS_JD_1 | 0/4 | Non-Compliance | ||
Record Document | 01/20/2015 | Satisfied | SPARKS_JD_1 | Non-Compliance | |||
Site Inspection | 12/21/2013 | Minor Out of Compliance | SPARKS_JD_1 | 0/4 | Routine Compliance | ||
Letter | 12/21/2013 | Satisfied | SPARKS_JD_1 | Non-Compliance | |||
Emergency Preparedness Information | 09/19/2013 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Emergency Preparedness Information | 08/26/2012 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Record Document | 08/08/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||
Emergency Preparedness Information | 07/22/2011 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Site Inspection | 07/22/2011 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/4 | Routine Compliance | ||
Letter | 05/13/2010 | Satisfied | OWEN_JA | Non-Compliance | |||
Site Inspection | 02/05/2010 | In Compliance | SNYDERBURN_PJ_2 | 0/4 | Installation | ||
Site Inspection | 06/18/2009 | In Compliance | NOVAK_KM_1 | 0/4 | Routine Compliance | ||
Site Inspection | 05/27/2007 | In Compliance | POTTS_CR | 0/4 | Routine Compliance | ||
Emergency Preparedness Information | 05/24/2007 | Satisfied | POTTS_CR | Routine Compliance | |||
Emergency Preparedness Information | 02/09/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||
Site Inspection | 05/26/2006 | Major Out of Compliance | OWEN_JA | 0/4 | Routine Compliance | ||
No Open AOCs Found | |||||||
Open Violations | |||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||
10/18/2023 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Please obtain financial responsibility (storage tank pollution liability insurance or other mechanism) and associated FDEP CFR Forms and email all associated documents to the Inspector within 90 days of the inspection date. | |||
10/16/2023 | 6077 | Minor | 4.8 Out of service storage tank systems not tested annually for operability or interstice and liquid level not monitored annually. | Within 90 days of the inspection date: -Perform the first annual visual/release detection inspection of the OOS UST system (visual inspection of STP sumps, sensor, and stick each primary compartment sumps then record liquid level) and then verify UST's are under vacuum. This must then be performed annually thereafter for the entire time the facility is registered as OOS. -Submit an INF for both UST's that have >1 inch liquid in them. -Remove excess liquid in DSL & PUL UST's to less than 1 inch and provide associated record documenting liquid was removed and properly disposed of if determined to be PCW. -Verify all UST's are under vacuum as they are required to be per FDEP EQ. If they are not under vacuum, then an INF must be completed and an investigation performed. The same INF can be completed for both liquid in the UST's and the UST's not holding vacuum (only if vacuum is not maintained) for interstitial monitoring. Please submit all associated documentation to the Inspector via email within 90 days of the inspection date. | |||
10/26/2021 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | Submit an Incident Notification Form to Michael.Winkler@CollierCountyFL.gov and investigate, repairing or replacing the gauge as necessary. | |||
10/26/2021 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | All release detection devices shall be tested annually at intervals not exceeding 12 months to ensure proper operation. The test must either simulate an actual alarm condition or shall be conducted according to manufacturer’s specifications, and shall include, at a minimum, a determination of whether the device operates as designed. | |||
10/26/2021 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair or replace diesel and premium probes at this time. | |||
08/13/2019 | 4055 | SNC-B | 4.29 Overfill protection not provided as required. This violation may lead to Placard Revocation and Delivery Prohibition. | Install a high level alarm that alerts the transfer operator when the tank is no more than 90 percent full. The alarm should be located so that is can be heard by the delivery person filling the tank(s). Or provide test records of another device (overfill valves, etc). Send documentation to the County. | |||
Discharge Information | |||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||
12/18/1992 | INACTIVE | 70 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||
05/30/1991 | COMPLETED | 55 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||