Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Polk | Status | OPEN | ||||||||
ID | 8839781 | Latitude | 28° 1' .5694 | ||||||||
Name |
STRIKE A DEAL 2141 CRYSTAL GROVE DR |
Longitude | 81° 54' 52.7649 | ||||||||
LAKELAND, FL 33801-6875 | LL Method | DPHO | |||||||||
Contact | TUYET THI VO | LL Status | REVIEWED | ||||||||
Phone | (863) 606-5252 | Status Date | 06/09/2003 | ||||||||
Account Owner Information | |||||||||||
Name | JOHNNY PO BOY 2141 CRYSTAL GROVE DR LAKELAND, FL 33801 |
Effective Date | 12/18/2017 | ||||||||
Contact | TUYET THI VO | ||||||||||
Phone | (601) 307-0809 | ||||||||||
TUYETV38@GMAIL.COM | |||||||||||
Placard # / Date | 703689 - 12/03/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | JOHNNY PO BOY 2141 CRYSTAL GROVE DR LAKELAND, FL 33801 |
Effective Date | 01/11/2018 | ||||||||
Contact | TUYET THI VO | ||||||||||
Phone | (601) 307-0809 | ||||||||||
TUYETV38@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 16000 | Ethanol E10 (8) | 07/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Unleaded Gas (B) | 02/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 02/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Unleaded Gas (B) | 02/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 6000 | Vehicular Diesel (D) | 02/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel | (C) Fiberglass | (S) Statistical Inventory Reconcile | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | ACE | ||||||||||
INSURANCE | 05/13/2020 | 05/13/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 05/13/2019 | 05/13/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/25/2017 | 08/25/2018 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 01/22/2016 | 01/22/2017 | ADMIRAL INSURANCE COMPANY | ||||||||
INSURANCE | 10/02/2013 | 10/02/2014 | ACE | ||||||||
INSURANCE | 10/02/2012 | 10/02/2013 | ACE | ||||||||
INSURANCE | 10/02/2011 | 10/02/2012 | ACE | ||||||||
INSURANCE | 10/02/2009 | 10/02/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 10/02/2008 | 10/02/2009 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/18/2007 | 01/18/2008 | ACE | ||||||||
INSURANCE | 04/21/2002 | 04/21/2004 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 04/21/1999 | 04/22/2002 | COLONY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
NCLI | 05/04/2006 | 05/04/2006 | CASSELS_C | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED: CLOSURE MATERIALS, STRF, TEST RESULTS, SIR REPORTS (12/03-04/06), VISUAL INSPECTIONS, WRITTEN RELEASE DETECTION RESPONSE LEVEL, MAY & JUNE INVENTORY CONTROL/SIR, LINE TIGHTNESS TEST RESULTS, LEAK DETECTOR RESULTS, SIR REPORTS (12/03-04/06). | |||||||||||
TCI | 04/25/2006 | 05/04/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | CASSELS_C | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes FOUR PHOTOS. PIPING: SINGLE WALL FIBERGLASS PRESSURIZED. VIOLATIONS RESOLVED: 1004. | |||||||||||
CRDE | 06/27/2005 | 08/19/2005 | JENKINS_N | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 06/20/2005 | 06/20/2005 | CROWELL_M | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 04/15/2005 | 06/20/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | CROWELL_M | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: UNDERGROUND SINGLE-WALL FIBERGLASS | |||||||||||
NCLI | 04/04/2004 | 08/06/2004 | RANDOLPH_L | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 03/23/2004 | 04/06/2004 | COMPLIANCE ASSURANCE | ||||||||
Completion Notes RECEIVED COPY OF PLACARD, TANK TIGHTNESS TEST AND CFR. | |||||||||||
RRBD | 01/28/2004 | 02/02/2004 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SIR REPORTS FOR 2003 RECEIVED. RESOLVES VIOLATION #86 & 170. | |||||||||||
TCQA | 01/23/2004 | 02/10/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | RANDOLPH_L | 0/0 | COMPLIANCE ASSURANCE | |||||
NCLI | 01/06/2004 | 01/08/2004 | HUGHES_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REQUESTED SIR REPORTS FOR ALL MONTHS IN 2003. | |||||||||||
TCI | 12/24/2003 | 01/08/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | HUGHES_J | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes NO PHOTOS TAKEN. PIPING: UNDERGROUND SINGLE-WALL FIBERGLASS. RESOLVES VIOLATION #142. | |||||||||||
RRBD | 05/21/2003 | 05/23/2003 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RESOLVES VIOLATION #103. | |||||||||||
REX | 05/02/2003 | 06/16/2003 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes EXTENSION UNTIL 5/31/03 | |||||||||||
NCLI | 01/31/2003 | 02/06/2003 | HAUSCHILD_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/31/2003 | 02/06/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | HAUSCHILD_T | 0/4 | COMPLIANCE ASSURANCE | |||||
CWOE | 12/28/2001 | 01/07/2002 | NEWBERG | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 12/28/2001 | 01/07/2002 | NEWBERG | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED PAPERWORK REQUESTED | |||||||||||
NCLI | 07/27/2001 | 08/06/2001 | NEWBERG | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/26/2001 | 08/06/2001 | MINOR OUT-OF-COMPLIANCE | NEWBERG | 0/4 | COMPLIANCE ASSURANCE | |||||
CALL | 07/11/2001 | 08/06/2001 | NEWBERG | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 02/21/2000 | 02/23/2000 | RONEY_B | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/16/2000 | 02/23/2000 | MINOR OUT-OF-COMPLIANCE | RONEY_B | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 06/15/1999 | 07/14/1999 | MINOR OUT-OF-COMPLIANCE | HUGHES_J | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/18/2022 | Accepted | CASSELS_CR_2 | Enforcement | |||||||
Site Inspection | 06/07/2022 | Major Out of Compliance | CASSELS_CR_2 | 0/1 | Compliance Assistance | ||||||
Letter | 06/07/2022 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Letter | 06/01/2022 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Site Inspection | 05/31/2022 | Major Out of Compliance | CASSELS_CR_2 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 06/03/2019 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Site Inspection | 06/03/2019 | Major Out of Compliance | JARRETT_SE_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 06/03/2019 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Letter | 06/03/2019 | Satisfied | JARRETT_SE_1 | Compliance Assistance | |||||||
Phone Conversation | 05/03/2019 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Meeting | 05/03/2019 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 05/03/2019 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Phone Conversation | 05/03/2019 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Phone Conversation | 05/03/2019 | Satisfied | JARRETT_SE_1 | Routine Compliance | |||||||
Electronic Communication | 01/16/2018 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Letter | 01/16/2018 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Electronic Communication | 12/29/2017 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Meeting | 12/15/2017 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Meeting | 12/15/2017 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Phone Conversation | 12/15/2017 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Electronic Communication | 12/15/2017 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Electronic Communication | 12/15/2017 | Satisfied | CASSELS_CR_2 | Compliance Assistance | |||||||
Letter | 09/12/2016 | Satisfied | CASSELS_CR_2 | Non-Compliance | |||||||
Electronic Communication | 09/12/2016 | Satisfied | CASSELS_CR_2 | Non-Compliance | |||||||
Site Inspection | 09/12/2016 | Minor Out of Compliance | CASSELS_CR_2 | 0/1 | Routine Compliance | ||||||
Site Inspection | 04/11/2014 | Minor Out of Compliance | NEWBERG_DR_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 04/11/2014 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Letter | 04/11/2014 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Site Inspection | 04/11/2012 | In Compliance | NEWBERG_DR_1 | 0/1 | Non-Compliance | ||||||
Site Inspection | 04/05/2012 | Minor Out of Compliance | NEWBERG_DR_1 | 0/1 | Routine Compliance | ||||||
Letter | 04/05/2012 | Satisfied | NEWBERG_DR_1 | Non-Compliance | |||||||
Electronic Communication | 08/01/2011 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
Site Inspection | 07/09/2010 | In Compliance | CASSELS_CR_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 07/24/2009 | In Compliance | CASSELS_CR_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 07/08/2009 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
Issue Document | 12/17/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 10/20/2008 | In Compliance | CASSELS_CR_1 | 0/1 | Non-Compliance | ||||||
Issue Document | 09/10/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 08/29/2008 | Minor Out of Compliance | CASSELS_CR_1 | 0/1 | Routine Compliance | ||||||
Letter | 08/29/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Phone Conversation | 08/11/2008 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
Issue Document | 05/19/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 03/21/2008 | Minor Out of Compliance | CASSELS_CR_1 | 0/1 | Installation | ||||||
Letter | 03/21/2008 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Site Inspection | 07/13/2007 | In Compliance | CASSELS_CR_1 | 0/4 | Closure | ||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | NEWBERG_DR_1 | Routine Compliance | |||||||
Issue Document | 12/11/2006 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Record Document | 12/08/2006 | Satisfied | CASSELS_CR_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/26/2006 | Satisfied | CASSELS_CR_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
06/01/2022 | 6082 | Minor | 4.13 Closure Integrity Report and Evaluation not completed and submitted in a timely fashion. | Closure assessment sampling must be performed at time of component closure. As there is no Corrective Action possible, the violation will be closed with issuance of the Compliance Assistance Offer Letter. | |||||||
05/31/2022 | 6076 | Minor | 4.7 Requirements not met for out-of-service systems. | The tank must be registered as In-service, after all required testing is completed immediately, or the fuel must be removed from the tank. Copies of all required test reports must be submitted to the Department, or a copy of the pump out manifest must be submitted and the Department contacted for re-inspection. | |||||||
05/31/2022 | 6013 | Minor | 2.10 Appropriate paperwork for financial responsibility improperly completed or maintained. | The DEP CFR Form Part P for the 2020-2021 policy must be completed and a copy submitted to the Department. | |||||||
05/31/2022 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | A completed Storage Tank Registration Form must be submitted to the Department will all corrections and updates made, or the information can be updated using the DEP's self-service application portal (ESSA) at: https://floridadep.gov/waste/permitting-compliance-assistance/content/storage-tank-facility-registration. | |||||||
05/31/2022 | 6024 | Minor | 2.2 Integrity test not performed on storage tank, integral piping, single-walled spill containment system, double-walled spill containment system, or doubled-walled sump prior to placing into service. | A 48 to 72 hour notification must be provided to the Department for when a technician will return to the site with the proper apparatus to perform the proper test, for an inspection to observe the required post-construction installation testing. | |||||||
05/31/2022 | 6077 | Minor | 4.8 Out of service storage tank systems not tested annually for operability or interstice and liquid level not monitored annually. | All required testing must be performed immediately and the tank registered In-service, or the fuel must be removed from the tank immediately, and the Department notified. | |||||||
05/31/2022 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Financial Responsibility must be demonstrated until the tank is permanently closed, including when it is out-of-service. Financial Responsibility must be demonstrated by getting the insurance re-instated with a retroactive date back to 05/13/2021, or by acquiring gap insurance for the period between 05/13/2021 and date of any new insurance policy, or the tank must be closed per 62-761.800(2)(a)3., Florida Administrative Code (FAC). | |||||||
05/31/2022 | 6076 | Minor | 4.7 Requirements not met for out-of-service systems. | An out-of-service tank cannot contain more than one inch of liquid. The PCW must be removed so that no more than one inch is present and the Department notified. | |||||||
05/31/2022 | 6051 | SNC-B | 4.5 Overfill prevention not provided or properly functioning. | The overfill protection equipment (drop tube overfill prevention valves) must be repaired or replaced and re-tested immediately, with a copy of the work order and test reports submitted to the Department. No fuel should be added to the tank without proper functioning overfill protection. | |||||||
05/31/2022 | 6009 | Minor | 4.1 Incident Notification Form (INF) not received in a timely manner. | As the INF has now been submitted, the violation will be closed with issuance of the Compliance Assistance Offer Letter. | |||||||
05/31/2022 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Access must be provided to the tank interstitial port and the Department notified. | |||||||
05/31/2022 | 6008 | Minor | 2.7 For installation, closure, or change in service status, notification not received in a timely manner. | As there is no Corrective Action possible, the violation will be closed with issuance of the Compliance Assistance Offer Letter. | |||||||
05/31/2022 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | All requested Financial Responsibility documentation must be submitted to the Department. The 05/13/2020 - 05/13/2021 ACE policy was sent after the inspection; however, the current 2021-2022 policy has not been submitted. | |||||||
06/03/2019 | 4059 | SNC-B | 4.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days.) For electronically monitored sumps, visual inspections not conducted every 6 months. This violation may lead to Placard Revocation and Delivery Prohibition. | A release detection inspection must be performed immediately with a copy of the inspection record submitted to the Department. - Inspection records must include visual inspection of the UST and piping interstices, including visual inspection of the STP sumps, dispensing systems (liners, nozzles, hoses, and breakaway devices) and double-walled, spill containment buckets (including interstices). | |||||||
06/03/2019 | 4077 | Minor | 4.12 Spill containment, sumps, and interstices not accessible. Water/regulated substances not timely removed. Petroleum contact water not properly managed. | Access must be provided to the spill bucket interstices (bolts opened) and the Department contacted for inspection. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
10/07/1998 | COMPLETED | 10 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||