![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Local Government | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8840509 | Latitude | 25° 47' 8.2501 | ||||||||
Name |
M-DCPS BOOKER T. WASHINGTON SENIOR HS 1200 NW 6TH AVE |
Longitude | 80° 12' 12.6554 | ||||||||
MIAMI, FL 33136-2409 | LL Method | DPHO | |||||||||
Contact | MR. MICHAEL KRTAUSCH | LL Status | REVIEWED | ||||||||
Phone | (305) 995-4451 | Status Date | 02/11/2025 | ||||||||
Account Owner Information | |||||||||||
Name | MIAMI-DADE CNTY PUBLIC SCHOOLS 12525 NW 28TH AVE Miami, FL 33167-2507 |
Effective Date | 05/20/1994 | ||||||||
Contact | CARLOS J GONZALEZ / PAUL J EVERET 305-572-3935 | ||||||||||
Phone | (305) 995-4067 | ||||||||||
CAGONZALEZ@DADESCHOOLS.NET | |||||||||||
Placard # / Date | 699147 - 07/09/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MIAMI-DADE CNTY PUBLIC SCHOOLS 12525 NW 28TH AVE Miami, FL 33167-2507 |
Effective Date | 08/07/2013 | ||||||||
Contact | CARLOS J GONZALEZ / PAUL J EVERET 305-572-3935 | ||||||||||
Phone | (305) 995-4067 | ||||||||||
CAGONZALEZ@DADESCHOOLS.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1000 | Emerg Generator Diesel (G) | 01/01/1994 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(R) Double wall - tank jacket | (A) Abv, no soil contact | (E) Monitor UST/liner space (L) Automatic tank gauging - USTs (O) Vapor monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 1000 | Emerg Generator Diesel (G) | 07/01/1986 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 07/01/2024 | 06/30/2025 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 06/18/2020 | 06/18/2021 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 06/01/2019 | 06/01/2020 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2018 | 03/15/2019 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2017 | 03/15/2018 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2016 | 03/15/2017 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2015 | 03/15/2016 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2014 | 03/15/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2013 | 03/15/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2012 | 03/15/2013 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/01/2010 | 03/01/2011 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/01/2009 | 03/01/2010 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 09/21/2005 | 10/06/2005 | IN-COMPLIANCE | CAJUSTE, P | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/25/2004 | 09/09/2004 | IN-COMPLIANCE | CAJUSTE, P | 1/0 | COMPLIANCE ASSURANCE | |||||
TCR | 04/14/2004 | 04/20/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | CAJUSTE, P | 1/0 | COMPLIANCE ASSURANCE | |||||
TCR | 02/26/2004 | 03/01/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | CAJUSTE, P | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 01/27/2004 | 02/03/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | CAJUSTE, P | 1/0 | COMPLIANCE ASSURANCE | |||||
TCR | 12/17/2002 | 02/03/2003 | IN-COMPLIANCE | BUSTAMANTE, M | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/06/2002 | 08/30/2002 | MINOR OUT-OF-COMPLIANCE | BUSTAMANTE, M | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/25/2001 | 10/02/2001 | IN-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
TXI | 02/07/2001 | 02/20/2001 | IN-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 09/21/2000 | 10/10/2000 | IN-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 01/07/2000 | 02/04/2000 | IN-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/16/1999 | 04/21/1999 | MINOR OUT-OF-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 02/13/2025 | Major Out of Compliance | SANPEDRO_A_2 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 02/13/2025 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Letter | 02/13/2025 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Electronic Communication | 01/06/2025 | Satisfied | SANPEDRO_A_2 | Routine Compliance | |||||||
Enforcement Tracking | 09/24/2024 | Closed Without Enforcement | CHIRINO_AM_1 | Enforcement | |||||||
Electronic Communication | 08/24/2020 | Satisfied | SANPEDRO_A_2 | Routine Compliance | |||||||
Letter | 08/23/2020 | Satisfied | SANPEDRO_A_2 | Routine Compliance | |||||||
Site Inspection | 08/23/2020 | In Compliance | SANPEDRO_A_2 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 07/29/2020 | Satisfied | SANPEDRO_A_2 | Routine Compliance | |||||||
Enforcement Referral | 04/26/2018 | Accepted | CHIRINO_AM_1 | Enforcement | |||||||
Site Inspection | 04/12/2018 | Major Out of Compliance | CRUZ_I_2 | 1/0 | Compliance Assistance | ||||||
Electronic Communication | 04/12/2018 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Phone Conversation | 04/12/2018 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Site Inspection | 12/20/2017 | Major Out of Compliance | CRUZ_I_2 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 12/20/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Letter | 12/20/2017 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Electronic Communication | 12/11/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Phone Conversation | 11/28/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Electronic Communication | 11/28/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Site Inspection | 06/03/2016 | In Compliance | CABRERA_VE_1 | 1/0 | Non-Compliance | ||||||
Electronic Communication | 06/03/2016 | Satisfied | CABRERA_VE_1 | Non-Compliance | |||||||
Electronic Communication | 11/02/2015 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Letter | 10/30/2015 | Satisfied | CABRERA_VE_1 | Non-Compliance | |||||||
Site Inspection | 10/29/2015 | Minor Out of Compliance | CABRERA_VE_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 10/23/2015 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Site Inspection | 12/23/2014 | In Compliance | LINCHETA_CR_1 | 1/0 | Non-Compliance | ||||||
Electronic Communication | 12/23/2014 | Satisfied | LINCHETA_CR_1 | Non-Compliance | |||||||
Letter | 01/24/2014 | Satisfied | LINCHETA_CR_1 | Non-Compliance | |||||||
Site Inspection | 01/24/2014 | Major Out of Compliance | LINCHETA_CR_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 01/24/2014 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Letter | 06/18/2012 | Satisfied | FERNANDEZBANGO_CE_1 | Non-Compliance | |||||||
Site Inspection | 05/25/2012 | Major Out of Compliance | FERNANDEZBANGO_CE_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 12/03/2010 | In Compliance | SHER_RC_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 10/02/2009 | In Compliance | SHER_RC_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 03/25/2009 | In Compliance | SHER_RC_1 | 1/0 | Non-Compliance | ||||||
Site Inspection | 02/19/2009 | Major Out of Compliance | SHER_RC_1 | 1/0 | Non-Compliance | ||||||
Letter | 01/16/2009 | Satisfied | SHER_RC_1 | Non-Compliance | |||||||
Site Inspection | 01/16/2009 | Major Out of Compliance | SHER_RC_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 05/02/2008 | In Compliance | PADRON_JE_1 | 1/0 | Non-Compliance | ||||||
Site Inspection | 12/20/2007 | Minor Out of Compliance | PADRON_JE_1 | 1/0 | Routine Compliance | ||||||
Letter | 12/20/2007 | Satisfied | PADRON_JE_1 | Non-Compliance | |||||||
Site Inspection | 06/18/2007 | In Compliance | RODRIGUEZ_Y_1 | 1/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/12/2025 | 7102 | SNC-B | 3.13 Storage tank system closure requirements not met. | Properly abandon one (1) monitoring well that was associated with a former UST system and provide documentation to confirm it. | |||||||
02/11/2025 | 7002 | Minor | 1.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Submit a registration form to the Florida Department of Environmental Protection (FDEP) to update: - Add code “C” to construction attributes to reflect that the tank is made of steel. - Add codes “M, P” for overfill protection under construction attributes. - Remove code “E”, “Automatic tank gauging – USTs” and “Vapor monitoring” from monitoring attributes (UST systems code) and add codes “Q, F, 1”. | |||||||
02/11/2025 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Provide a current and passing annual operability test for the overfill protection device (Pneumercator TMS 2000 panel). | |||||||
02/11/2025 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Provide a current and passing annual operability test for the release detection device (Pneumercator TMS 2000 panel). | |||||||
02/11/2025 | 7094 | Minor | 1.13 Permanent records not available within 5 working days notice. | Provide monthly visual and electronic release detection inspection logs. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/01/1988 | COMPLETED | ||||||||||