![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Retail Station | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 8840964 | Latitude | 28° 56' 38.5246 | ||||||||
Name |
CIRCLE K #2708616 2885 HOWLAND BLVD |
Longitude | 81° 13' 34.1654 | ||||||||
DELTONA, FL 32725-9620 | LL Method | DPHO | |||||||||
Contact | GRAHAM BIGGS | LL Status | REVIEWED | ||||||||
Phone | (919) 774-6700 | Status Date | 07/15/2005 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 05/20/1994 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697868 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 07/14/2009 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Vehicular Diesel (D) | 02/19/2019 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 20000 | Unleaded Gas (B) | 02/19/2019 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 06/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 06/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 06/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/28/2024 | 08/26/2025 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2023 | 08/28/2024 | |||||||||
INSURANCE | 12/01/2021 | 12/01/2022 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2020 | 12/01/2021 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2019 | 12/01/2020 | NAVIGATORS SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 11/03/2018 | 11/03/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2017 | 12/01/2018 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2013 | 12/01/2014 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
INSURANCE | 12/01/2011 | 12/01/2012 | CHUBB | ||||||||
INSURANCE | 12/17/2010 | 12/17/2011 | CHUBB | ||||||||
INSURANCE | 12/17/2009 | 12/17/2010 | CHUBB | ||||||||
INSURANCE | 12/17/2008 | 12/17/2009 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 11/17/2005 | 11/22/2005 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PRODUCT IN MIDGRADE PIPING SUMP | |||||||||||
IRFR | 05/19/2005 | 05/23/2005 | EJ | 0/0 | DISCHARGE PROJECT | ||||||
TCI | 12/17/2004 | 12/21/2004 | MINOR OUT-OF-COMPLIANCE | TM | 0/3 | COMPLIANCE ASSURANCE | |||||
CWOE | 02/06/2004 | 02/06/2004 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NFA CONCERNING THE LATEST TCI. | |||||||||||
RRBD | 02/06/2004 | 02/06/2004 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED FAX INDICATING ALL ISSUES ADDRESSED. | |||||||||||
CALL | 02/05/2004 | 02/06/2004 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED A MESSAGE FROM DARYL GOTTILLA INDICATING THE NONCOMPLIANCE ISSUES ARE BEING CORRECTED. | |||||||||||
LTR | 02/05/2004 | 02/05/2004 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SENT FAX REQUESTING ADDITIONAL INFO. CONCERNING THE LATEST NCLI. | |||||||||||
CALL | 01/16/2004 | 01/22/2004 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes EJ RECEIVED A CALL INDICATING THE NONCOMPLIANCE ISSUES WILL BE RESOLVED.L | |||||||||||
RRBD | 12/31/2003 | 12/31/2003 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED FAX FROM CIRCLE K INDICATING THE NONCOMPLIANCE ISSUES ARE BEING ADDRESSED. COMPLETION BY 1/15/04. | |||||||||||
NCLI | 12/10/2003 | 12/11/2003 | DJ | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO R3ESPONSE FRO THE FACILITY. | |||||||||||
TCI | 10/06/2003 | 10/07/2003 | MINOR OUT-OF-COMPLIANCE | DJ | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes STP PIPING SUMP (PREM) HAS ACCUMULATION OF PRODUCT. COULD NOT DETERMINE SOURCE OF PRODUCT LEAK. | |||||||||||
TCI | 09/06/2002 | 09/13/2002 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/10/2001 | 10/11/2001 | IN-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/13/2000 | 11/30/2000 | IN-COMPLIANCE | MOSER_T | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/16/2000 | 03/16/2000 | IN-COMPLIANCE | LLW | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 01/21/1999 | 03/05/1999 | IN-COMPLIANCE | VANDERBLEE_R | 0/0 | COMPLIANCE ASSURANCE | |||||
UTCR | 03/05/1998 | 03/18/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 04/30/2025 | Satisfied | KIDDER_MS_1 | Compliance Assistance | |||||||
Site Inspection | 04/30/2025 | Major Out of Compliance | KIDDER_MS_1 | 0/2 | Compliance Assistance | ||||||
Electronic Communication | 04/21/2025 | Satisfied | PIERCE_BN_1 | Component Installation | |||||||
Electronic Communication | 03/24/2025 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 03/07/2025 | Satisfied | HALL_DK | Enforcement | |||||||
Electronic Communication | 01/28/2025 | Satisfied | KIDDER_MS_1 | Incident | |||||||
Enforcement Referral | 06/11/2024 | Accepted | GREGORY_JW_1 | Enforcement | |||||||
Electronic Communication | 03/12/2024 | Satisfied | GREGORY_JW_1 | Compliance Assistance | |||||||
Letter | 12/04/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 11/28/2023 | Major Out of Compliance | PIERCE_BN_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 11/27/2023 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Letter | 01/23/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 10/11/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 04/12/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 12/02/2021 | Minor Out of Compliance | PIERCE_BN_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/02/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 11/18/2021 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Incident | 06/07/2021 | Has not led to Discharge | PIERCE_BN_1 | Incident | |||||||
Document Management | 02/26/2021 | Satisfied | PIERCE_BN_1 | Incident | |||||||
Letter | 07/01/2020 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 06/05/2020 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 11/17/2019 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Letter | 11/13/2019 | Satisfied | PERRY_JF_2 | Compliance Assistance | |||||||
Site Inspection | 11/13/2019 | Minor Out of Compliance | PERRY_JF_2 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 06/03/2019 | Satisfied | RAUENZAHN_RA_1 | Installation | |||||||
Letter | 06/03/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Letter | 06/03/2019 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 06/03/2019 | Satisfied | RAUENZAHN_RA_1 | Installation | |||||||
Site Inspection | 06/03/2019 | Minor Out of Compliance | BECKER_GT_1 | 0/2 | Installation | ||||||
Electronic Communication | 06/03/2019 | Satisfied | RAUENZAHN_RA_1 | Installation | |||||||
Site Inspection | 05/31/2019 | In Compliance | RAUENZAHN_RA_1 | 0/3 | Closure | ||||||
Electronic Communication | 05/31/2019 | Satisfied | RAUENZAHN_RA_1 | Installation | |||||||
Electronic Communication | 02/21/2019 | Satisfied | RAUENZAHN_RA_1 | Installation | |||||||
Incident | 02/06/2019 | Has not led to Discharge | RAUENZAHN_RA_1 | Incident | |||||||
Electronic Communication | 02/06/2019 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Letter | 02/06/2019 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
TCAR | 02/06/2019 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Incident | 02/06/2019 | Has not led to Discharge | BECKER_GT_1 | Incident | |||||||
Electronic Communication | 02/06/2019 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Document Management | 01/24/2019 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Phone Conversation | 12/20/2018 | Satisfied | BECKER_GT_1 | Installation | |||||||
Phone Conversation | 12/20/2018 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 12/20/2018 | Satisfied | BECKER_GT_1 | Installation | |||||||
Phone Conversation | 12/20/2018 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 12/20/2018 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 12/07/2018 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Electronic Communication | 12/07/2018 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Electronic Communication | 11/29/2018 | Satisfied | RAUENZAHN_RA_1 | Installation | |||||||
Electronic Communication | 11/29/2018 | Satisfied | RAUENZAHN_RA_1 | Closure | |||||||
Document Management | 11/21/2018 | Satisfied | BECKER_GT_1 | Incident | |||||||
Document Management | 11/21/2018 | Satisfied | RAUENZAHN_RA_1 | Incident | |||||||
Document Management | 11/21/2018 | Satisfied | RAUENZAHN_RA_1 | Incident | |||||||
Electronic Communication | 11/19/2018 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 11/13/2018 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Phone Conversation | 08/23/2018 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 08/23/2018 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Electronic Communication | 08/23/2018 | Satisfied | RAUENZAHN_RA_1 | Compliance Assistance | |||||||
Document Management | 04/06/2017 | Satisfied | BECKER_GT_1 | Incident | |||||||
Site Inspection | 04/05/2017 | In Compliance | PERRY_JF_2 | 0/3 | Routine Compliance | ||||||
Site Inspection | 12/31/2014 | In Compliance | PERRY_JF_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/29/2014 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 12/19/2014 | Minor Out of Compliance | BECKER_GT_1 | 0/2 | Installation | ||||||
Site Inspection | 12/19/2014 | Minor Out of Compliance | BECKER_GT_1 | 0/2 | Closure | ||||||
Letter | 12/19/2014 | Satisfied | BECKER_GT_1 | Non-Compliance | |||||||
Enforcement Tracking | 01/30/2014 | Closed Without Enforcement | MARTIN_G | Enforcement | |||||||
Site Inspection | 11/09/2012 | In Compliance | PERRY_JF_2 | 0/3 | Non-Compliance | ||||||
Letter | 10/26/2012 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Site Inspection | 10/26/2012 | Minor Out of Compliance | PERRY_JF_2 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/15/2012 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 08/03/2011 | Minor Out of Compliance | STAFFORD_P_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 08/02/2010 | Minor Out of Compliance | COIL_JM_1 | 0/3 | Routine Compliance | ||||||
Enforcement Referral | 11/16/2009 | Accepted | MARTIN_G | Enforcement | |||||||
Record Document | 07/27/2009 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 03/03/2009 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Site Inspection | 02/13/2009 | Minor Out of Compliance | COIL_JM_1 | 0/3 | Installation | ||||||
Phone Conversation | 01/20/2009 | Satisfied | LEIGH_MM_1 | Installation | |||||||
Issue Document | 01/20/2009 | Satisfied | LEIGH_MM_1 | Installation | |||||||
Record Document | 01/20/2009 | Satisfied | LEIGH_MM_1 | Installation | |||||||
Phone Conversation | 01/16/2009 | Satisfied | LEIGH_MM_1 | Installation | |||||||
Phone Conversation | 01/16/2009 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Site Inspection | 01/16/2009 | In Compliance | COIL_JM_1 | 0/3 | Closure | ||||||
Phone Conversation | 01/16/2009 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Record Document | 01/13/2009 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Site Inspection | 12/01/2008 | In Compliance | COIL_JM_1 | 0/3 | Routine Compliance | ||||||
Record Document | 05/21/2008 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Letter | 05/14/2008 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Site Inspection | 04/03/2008 | In Compliance | MOSER_T | 0/3 | Installation | ||||||
Record Document | 12/04/2007 | Satisfied | LEIGH_MM_1 | Closure | |||||||
Site Inspection | 11/30/2007 | In Compliance | MOSER_T | 0/3 | Routine Compliance | ||||||
Record Document | 08/20/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | LEIGH_MM_1 | Routine Compliance | |||||||
Site Inspection | 12/07/2006 | In Compliance | MOSER_T | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | MOSER_T | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/28/2023 | 6051 | SNC-B | 4.5 Overfill prevention not provided or properly functioning. | Please have the flapper valves repaired & retested. Please supply a work order & test results once available. | |||||||
11/28/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | 1) Please have the liquid removed from the secondary space of the spill bucket. Please have a vacuum test performed to ensure the integrity of the spill bucket is still intact. Please supply a work order & vacuum testing for review once complete. 2) Please have the PCW removed from the STP sumps. Please supply a manifest for disposal and pictures/work order showing the liquid was removed. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
06/03/1997 | COMPLETED | 60 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||