![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8841075 | Latitude | 30° 13' 50.2609 | ||||||||
Name |
TEXACO FOOD MART-PCB 16930 PANAMA CITY BEACH PKWY |
Longitude | 85° 53' 13.8913 | ||||||||
PANAMA CITY BEACH, FL 32413-2239 | LL Method | DPHO | |||||||||
Contact | PAUL PAISCH | LL Status | REVIEWED | ||||||||
Phone | (850) 774-5172 | Status Date | 06/15/2023 | ||||||||
Account Owner Information | |||||||||||
Name | PCB PKWY 16930 CENTER LLC PO BOX 1565 LAWRENCEVILLE, GA 30046 |
Effective Date | 06/10/2011 | ||||||||
Contact | SCOTT A MOON | ||||||||||
Phone | (770) 338-2620 | ||||||||||
PENNY@MAJORSMGMT.COM | |||||||||||
Placard # / Date | 700051 - 07/24/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | PCB PKWY 16930 CENTER LLC PO BOX 1565 LAWRENCEVILLE, GA 30046 |
Effective Date | 06/10/2011 | ||||||||
Contact | SCOTT A MOON | ||||||||||
Phone | (770) 338-2620 | ||||||||||
PENNY@MAJORSMGMT.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 20000 | Unleaded Gas (B) | 12/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 12000 | Unleaded Gas (B) | 12/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 06/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 06/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 06/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (H) Impressed current CP (M) Spill containment bucket (P) Level gauges/alarms |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 12/31/2023 | 12/31/2024 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2022 | 12/31/2023 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2020 | 12/31/2021 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2018 | 12/31/2019 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2016 | 12/31/2017 | TOKIO MARINE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 12/31/2013 | 12/31/2014 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 04/15/2012 | 04/15/2013 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 05/24/2011 | 04/15/2012 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
INSURANCE | 11/11/2009 | 11/11/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/11/2009 | 11/11/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 07/20/2009 | 01/01/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 07/20/2009 | 07/20/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/11/2008 | 11/11/2009 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/11/2007 | 11/11/2008 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/31/1993 | 12/31/1995 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
DRFR | 01/04/2006 | 01/06/2006 | BRAZILE_D | 0/1 | DISCHARGE PROJECT | ||||||
TDI | 12/20/2005 | MINOR OUT-OF-COMPLIANCE | BRAZILE | 0/3 | DISCHARGE PROJECT | ||||||
TCI | 11/08/2005 | 11/29/2005 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 11/10/2004 | 12/03/2004 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS AND AMERON DW (MANIFOLDED LINE) | |||||||||||
TCI | 11/04/2004 | 11/08/2004 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS AND AMERON DW (MANIFOLDED LINE) | |||||||||||
RRBD | 12/08/2003 | 12/09/2003 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
IRFR | 11/24/2003 | 11/25/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF FOR TANK T-2 ATG FAILS. | |||||||||||
DSNR | 11/24/2003 | 11/25/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DSNR-NO INVENTORY INDICATION OF A RELEASE-PROBLEM SOLVED BY COMPUTER REPROGRAMMING. | |||||||||||
DSNR | 11/24/2003 | 11/25/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DSNR FOR PROBE PROBLEMS-NO RELEASE INDICATED. | |||||||||||
IRFR | 11/24/2003 | 11/25/2003 | PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF FOR TANK T-1 ATG FAILS. | |||||||||||
RRBD | 11/24/2003 | 12/02/2003 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INF RECEIVED | |||||||||||
TCI | 11/05/2003 | 11/12/2003 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: UNKNOWN FIBERGLASS AND AMERON DW (MANIFOLDED LINE) | |||||||||||
RRBD | 07/15/2003 | 07/16/2003 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TIN | 07/11/2003 | 07/11/2003 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: SINGLE WALLED FIBERGLASS; DOUBLEWALLED AMERON FIBERGLASS MANIFOLD LINE) | |||||||||||
TXI | 07/02/2003 | 07/07/2003 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLOSING MIDGRADE LINE IN PLACE AND CLOSING/REMOVING 4 OLD DISPENSERS | |||||||||||
TCR | 11/26/2002 | 11/27/2002 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/06/2002 | 11/08/2002 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/06/2001 | 11/09/2001 | IN-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 02/15/2001 | 02/15/2001 | IN-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/18/2001 | 01/22/2001 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
RRBD | 01/03/2001 | 01/05/2001 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
RRBD | 11/27/2000 | 11/28/2000 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/07/2000 | 11/09/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/01/1999 | 12/07/1999 | PINKOVKSY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/12/1999 | 11/15/1999 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
TCAR | 01/10/2025 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
Letter | 01/10/2025 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
Document Management | 01/10/2025 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
TCAR | 11/19/2024 | Satisfied | GARTIN_D | Component Closure | |||||||
Electronic Communication | 11/13/2024 | Satisfied | PROFFITT_B | Enforcement | |||||||
Enforcement Referral | 08/20/2024 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Record Document | 07/23/2024 | Satisfied | MERRITT_S | Compliance Assistance | |||||||
Electronic Communication | 07/23/2024 | Satisfied | MERRITT_S | Enforcement | |||||||
Electronic Communication | 07/23/2024 | Satisfied | MERRITT_S | Enforcement | |||||||
Document Management | 07/23/2024 | Satisfied | MERRITT_S | Compliance Assistance | |||||||
Electronic Communication | 07/23/2024 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Tracking | 07/23/2024 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 06/26/2024 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 05/15/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Site Inspection | 05/14/2024 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 04/25/2024 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 02/27/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 02/23/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Letter | 02/23/2024 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Document Management | 11/21/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
TCAR | 11/21/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Letter | 11/21/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Enforcement Tracking | 10/06/2023 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Enforcement Tracking | 10/06/2023 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Enforcement Referral | 07/31/2023 | Accepted | WILSON_ML_1 | Enforcement | |||||||
Letter | 07/11/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 06/30/2023 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Component Installation | ||||||
Enforcement Referral | 05/23/2023 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Letter | 04/10/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 04/07/2023 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 04/07/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 02/20/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 02/17/2023 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Component Installation | ||||||
TCAR | 03/04/2022 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Issue Document | 03/03/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 03/03/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 02/25/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 02/01/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 02/01/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 01/04/2022 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 12/22/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 10/06/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 10/06/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 10/06/2021 | Major Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 09/23/2021 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Enforcement Tracking | 06/09/2020 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Enforcement Tracking | 06/09/2020 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Enforcement Referral | 05/19/2020 | Accepted | BRISTOL_S | Enforcement | |||||||
Enforcement Referral | 02/24/2020 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Record Document | 02/10/2020 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Record Document | 02/10/2020 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Letter | 01/14/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
TCAR | 01/14/2020 | Satisfied | PAYNE_CL_1 | Closure | |||||||
Issue Document | 01/14/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 01/10/2020 | Satisfied | WILSON_ML_1 | Closure | |||||||
Document Management | 12/30/2019 | Satisfied | PAYNE_CL_1 | Discharge | |||||||
Discharge Reporting | 12/30/2019 | Satisfied | PAYNE_CL_1 | Discharge | |||||||
Letter | 12/30/2019 | Satisfied | WILSON_ML_1 | Discharge | |||||||
Letter | 11/27/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 11/27/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 11/26/2019 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 11/15/2019 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 10/19/2018 | In Compliance | BROCK_SN_1 | 0/2 | Complaint | ||||||
Letter | 09/19/2017 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 09/19/2017 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 08/30/2017 | In Compliance | KHAN_MR_1 | 0/2 | Compliance Assistance | ||||||
Phone Conversation | 08/24/2017 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Letter | 03/02/2017 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 02/28/2017 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Record Document | 10/20/2014 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 08/26/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 08/25/2014 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/22/2014 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 05/15/2012 | In Compliance | KHAN_MR_1 | 0/2 | Non-Compliance | ||||||
Letter | 03/30/2012 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 03/28/2012 | Minor Out of Compliance | KHAN_MR_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/27/2012 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 09/27/2010 | In Compliance | BRAZILE_DO_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 06/14/2010 | In Compliance | KHAN_MR_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 12/30/2009 | In Compliance | BRAZILE_DO_1 | 0/3 | Installation | ||||||
TCAR | 12/24/2009 | Satisfied | BRAZILE_DO_1 | Closure | |||||||
Site Inspection | 12/10/2009 | In Compliance | BRAZILE_DO_1 | 0/3 | Closure | ||||||
Letter | 11/20/2009 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 11/07/2009 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 11/06/2009 | Minor Out of Compliance | BRAZILE_DO_1 | 0/3 | Routine Compliance | ||||||
Record Document | 01/06/2009 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 09/05/2008 | In Compliance | BRAZILE_DO_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/04/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 04/14/2008 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Site Inspection | 11/10/2007 | In Compliance | BRAZILE_DO_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 04/24/2007 | In Compliance | BRAZILE_DO_1 | 0/3 | Non-Compliance | ||||||
Record Document | 04/12/2007 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Record Document | 04/12/2007 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Site Inspection | 04/06/2007 | Minor Out of Compliance | KHAN_MR_1 | 0/3 | Non-Compliance | ||||||
Letter | 04/06/2007 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 03/23/2007 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 03/21/2007 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Letter | 03/21/2007 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Letter | 10/31/2006 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 10/31/2006 | Major Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/15/2019 | COMPLETED | ||||||||||
12/20/2005 | INACTIVE | 10 | Bristol, Susan M. | 8505958360 | |||||||
06/08/1993 | ACTIVE | 10 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||