Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8841204 | Latitude | 25° 42' 8.9226 | ||||||||
Name |
SUNSHINE #348 8781 SW 72ND ST |
Longitude | 80° 20' 8.598 | ||||||||
MIAMI, FL 33173-3580 | LL Method | DPHO | |||||||||
Contact | MIGUEL SHIHADEH | LL Status | REVIEWED | ||||||||
Phone | (954) 444-7103 | Status Date | 02/21/2024 | ||||||||
Account Owner Information | |||||||||||
Name | SUNSHINE GASOLINE DISTRIBUTORS INC 1650 NW 87TH AVE DORAL, FL 33172-2614 |
Effective Date | 06/08/2016 | ||||||||
Contact | MARIO ZAMORA / VANESSA PALACIOS | ||||||||||
Phone | (786) 606-0917 | ||||||||||
MZAMORA@SUNSHINEGASOLINE.COM | |||||||||||
Placard # / Date | 694604 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SHIHADEH, NIDAL & MIGUEL 8200 NW 41ST ST #155 Miami, FL 33166 |
Effective Date | 05/09/2012 | ||||||||
Contact | MIGUEL SHIHADEH | ||||||||||
Phone | (786) 542-0593 | ||||||||||
MIDLALA@GETITDOWNSTAIRS.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 12000 | Vehicular Diesel (D) | 08/01/2018 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 12000 | Ethanol E10 (8) | 08/01/2018 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 12000 | Vehicular Diesel (D) | 08/01/2018 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 2000 | Vehicular Diesel (D) | 07/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (E) Cathodic protection | (7) Automatically sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 10000 | Unleaded Gas (B) | 06/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket |
(C) Fiberglass (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners |
(7) Automatically sampled wells (H) Mechanical line leak detector (N) Groundwater monitoring (W) Fiber-optic Technologies |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Leaded Gas (A) | 07/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (E) Cathodic protection | (7) Automatically sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 10000 | Unleaded Gas (B) | 06/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket |
(C) Fiberglass (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(7) Automatically sampled wells (H) Mechanical line leak detector (N) Groundwater monitoring (W) Fiber-optic Technologies |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 07/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (E) Cathodic protection | (7) Automatically sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 06/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket |
(C) Fiberglass (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(7) Automatically sampled wells (H) Mechanical line leak detector (N) Groundwater monitoring (W) Fiber-optic Technologies |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 07/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (E) Cathodic protection | (7) Automatically sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4R1 | 4000 | Vehicular Diesel (D) | 06/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (I) Double wall (M) Spill containment bucket |
(C) Fiberglass (G) Pipe trench liner (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(7) Automatically sampled wells (H) Mechanical line leak detector (N) Groundwater monitoring (W) Fiber-optic Technologies |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 07/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve | (E) Cathodic protection | (7) Automatically sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 6000 | Vehicular Diesel (D) | 07/01/1979 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
INSURANCE | |||||||||||
INSURANCE | 09/25/2022 | 09/25/2023 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2021 | 09/25/2022 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2018 | 09/25/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2016 | 09/25/2017 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 05/19/2014 | 05/19/2015 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 02/22/2013 | 02/21/2014 | LLOYDS OF LONDON | ||||||||
INSURANCE | 02/01/2012 | 02/01/2013 | LLOYDS OF LONDON | ||||||||
INSURANCE | 05/19/2010 | 05/19/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/19/2009 | 05/19/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 05/19/2009 | 05/19/2010 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 02/24/2006 | 03/03/2006 | MINOR OUT-OF-COMPLIANCE | HARRIS, J | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/11/2006 | 02/01/2006 | MINOR OUT-OF-COMPLIANCE | HARRIS, J | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 07/27/2005 | 07/29/2005 | IN-COMPLIANCE | HARRIS, J | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 06/17/2005 | 06/30/2005 | MINOR OUT-OF-COMPLIANCE | HARRIS, J | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/21/2004 | 06/22/2004 | ROMAN, A | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCR | 11/17/2003 | 12/02/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | ROMAN, A | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 09/25/2003 | 09/26/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | ROMAN, A | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 04/14/2003 | 05/02/2003 | MINOR OUT-OF-COMPLIANCE | ROMAN, A | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 01/08/2002 | 01/15/2002 | IN-COMPLIANCE | ROMAN, A | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 12/27/2001 | 01/04/2002 | MINOR OUT-OF-COMPLIANCE | ROMAN_A | 0/4 | COMPLIANCE ASSURANCE | |||||
PDNE | 12/27/2001 | 01/04/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 07/16/2001 | 08/03/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | ROMAN, A | 0/4 | COMPLIANCE ASSURANCE | |||||
WLI | 03/30/2001 | 04/09/2001 | LAMOAL_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TICKET ISSUED BY SCOTT LAMOLA | |||||||||||
TIN | 04/20/2000 | 05/10/2000 | IN-COMPLIANCE | ROBERTS, A | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 04/11/2000 | 05/22/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | LAMOLA, S | 0/4 | COMPLIANCE ASSURANCE | |||||
TIN | 04/06/2000 | 04/27/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | ROBERTS, A | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 06/25/1999 | 07/07/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | LAMOLA, S | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 09/29/2023 | Major Out of Compliance | MATUTERODRIGUEZ_MA_1 | 0/3 | Routine Compliance | ||||||
Letter | 09/29/2023 | Satisfied | MATUTERODRIGUEZ_MA_1 | Compliance Assistance | |||||||
Electronic Communication | 09/25/2023 | Satisfied | MATUTERODRIGUEZ_MA_1 | Routine Compliance | |||||||
Site Inspection | 06/01/2022 | In Compliance | SANPEDRO_A_2 | 0/3 | Component Installation | ||||||
Electronic Communication | 06/01/2022 | Satisfied | SANPEDRO_A_2 | Component Installation | |||||||
Electronic Communication | 06/01/2022 | Satisfied | SANPEDRO_A_2 | Component Closure | |||||||
Site Inspection | 05/23/2022 | In Compliance | SANPEDRO_A_2 | 0/3 | Component Closure | ||||||
Letter | 11/29/2021 | Satisfied | GRIMALDO_JN_1 | Routine Compliance | |||||||
Site Inspection | 11/29/2021 | In Compliance | GRIMALDO_JN_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 11/15/2021 | Satisfied | GRIMALDO_JN_1 | Routine Compliance | |||||||
Letter | 04/15/2019 | Satisfied | DELEON_S_1 | Compliance Assistance | |||||||
Electronic Communication | 04/11/2019 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Letter | 04/11/2019 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Electronic Communication | 04/11/2019 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Electronic Communication | 03/20/2019 | Satisfied | DELEON_S_1 | Routine Compliance | |||||||
Site Inspection | 03/20/2019 | Minor Out of Compliance | DELEON_S_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 11/29/2018 | In Compliance | DELEON_S_1 | 0/3 | Installation | ||||||
Phone Conversation | 10/26/2018 | Satisfied | DELEON_S_1 | Installation | |||||||
Phone Conversation | 10/24/2018 | Satisfied | DELEON_S_1 | Installation | |||||||
Electronic Communication | 10/24/2018 | Satisfied | DELEON_S_1 | Installation | |||||||
Phone Conversation | 10/18/2018 | Satisfied | DELEON_S_1 | Installation | |||||||
Electronic Communication | 10/16/2018 | Satisfied | CRUZ_I_2 | Installation | |||||||
Phone Conversation | 10/16/2018 | Satisfied | CRUZ_I_2 | Installation | |||||||
Site Inspection | 08/15/2018 | In Compliance | DELEON_S_1 | 0/4 | Closure | ||||||
Phone Conversation | 08/06/2018 | Satisfied | DELEON_S_1 | Closure | |||||||
Site Inspection | 11/30/2016 | In Compliance | FERNANDEZBANGO_CE_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 01/09/2015 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Electronic Communication | 01/07/2015 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 12/30/2014 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Site Inspection | 12/30/2014 | In Compliance | FERNANDEZBANGO_CE_1 | 0/4 | Routine Compliance | ||||||
Phone Conversation | 12/26/2014 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Enforcement Tracking | 04/30/2014 | Closed Without Enforcement | SYKORA_JJ_1 | Enforcement | |||||||
Electronic Communication | 08/08/2013 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Site Inspection | 08/08/2013 | Minor Out of Compliance | LINCHETA_CR_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/07/2013 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Electronic Communication | 08/07/2013 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Electronic Communication | 07/24/2013 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Phone Conversation | 07/24/2013 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Site Inspection | 04/26/2013 | Major Out of Compliance | LINCHETA_CR_1 | 0/4 | Non-Compliance | ||||||
Discharge Reporting | 03/14/2013 | Satisfied | KONG_TE_1 | Discharge | |||||||
Document Management | 01/23/2013 | Complete | KONG_TE_1 | Discharge | |||||||
Letter | 12/24/2012 | Satisfied | LINCHETA_CR_1 | Non-Compliance | |||||||
Site Inspection | 12/24/2012 | Major Out of Compliance | LINCHETA_CR_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 12/24/2012 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Letter | 12/11/2012 | Satisfied | KONG_TE_1 | Discharge | |||||||
Site Inspection | 03/08/2011 | Minor Out of Compliance | RUNTE_C_3 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/08/2011 | Satisfied | RUNTE_C_3 | Routine Compliance | |||||||
Letter | 03/08/2011 | Satisfied | RUNTE_C_3 | Non-Compliance | |||||||
Site Inspection | 06/07/2010 | Major Out of Compliance | RUNTE_C_3 | 0/4 | Non-Compliance | ||||||
Site Inspection | 05/03/2010 | Minor Out of Compliance | RUNTE_C_3 | 0/4 | Routine Compliance | ||||||
Letter | 05/03/2010 | Satisfied | RUNTE_C_3 | Non-Compliance | |||||||
Site Inspection | 06/15/2009 | Minor Out of Compliance | SYKORA_JJ_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 05/28/2009 | Major Out of Compliance | SYKORA_JJ_1 | 0/4 | Routine Compliance | ||||||
Letter | 05/28/2009 | Satisfied | SYKORA_JJ_1 | Non-Compliance | |||||||
Enforcement Referral | 05/28/2009 | Accepted | SYKORA_JJ_1 | Enforcement | |||||||
Issue Document | 05/28/2009 | Satisfied | SYKORA_JJ_1 | Enforcement | |||||||
Record Document | 05/14/2008 | Satisfied | SYKORA_JJ_1 | Non-Compliance | |||||||
Site Inspection | 05/08/2008 | Major Out of Compliance | CAJUSTE_PJ_1 | 0/4 | Installation | ||||||
Letter | 05/08/2008 | Satisfied | SYKORA_JJ_1 | Non-Compliance | |||||||
Site Inspection | 05/08/2008 | Minor Out of Compliance | SYKORA_JJ_1 | 0/4 | Installation | ||||||
Site Inspection | 05/06/2008 | Major Out of Compliance | PADRON_JE_1 | 0/10 | Installation | ||||||
Site Inspection | 05/05/2008 | Major Out of Compliance | GONZALEZ_EX | 0/4 | Installation | ||||||
Record Document | 03/21/2008 | Satisfied | SYKORA_JJ_1 | Non-Compliance | |||||||
Site Inspection | 03/19/2008 | Major Out of Compliance | SYKORA_JJ_1 | 0/4 | Non-Compliance | ||||||
Letter | 03/07/2008 | Satisfied | GONZALEZ_EX | Non-Compliance | |||||||
Site Inspection | 03/07/2008 | Major Out of Compliance | GONZALEZ_EX | 0/4 | Routine Compliance | ||||||
Record Document | 09/12/2007 | Satisfied | CAMACHO_D | Non-Compliance | |||||||
Record Document | 08/28/2007 | Satisfied | CAMACHO_D | Non-Compliance | |||||||
Site Inspection | 06/12/2007 | Major Out of Compliance | CAMACHO_D | 0/4 | Non-Compliance | ||||||
Letter | 06/12/2007 | Satisfied | CAMACHO_D | Non-Compliance | |||||||
Letter | 05/03/2007 | Satisfied | CAMACHO_D | Non-Compliance | |||||||
Site Inspection | 05/03/2007 | Major Out of Compliance | CAMACHO_D | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/15/2007 | Satisfied | PADRON_JE_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | SIRMAN_C | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
09/28/2023 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | 1. Provide a current certificate of financial responsibility. | |||||||
09/25/2023 | 6057 | SNC-B | 4.7 Release detection not installed, operated, and maintained per manufacturer's instructions and standards. | Make appropriate repairs to clear fuel alarm from STP sump sensor on the Veeder Root TLS-350. Provide a liquid status report with all sensors normal when complete. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
11/01/2012 | ACTIVE | ||||||||||
06/07/1989 | INACTIVE | 96 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||