![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/20/2025 Last Data Refresh: 04/19/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Local Government | ||||||||
County | Palm Beach | Status | OPEN | ||||||||
ID | 8841217 | Latitude | 26° 46' 58.28 | ||||||||
Name |
RIVIERA BEACH CITY UTILITY DISTRICT-WTP 800 W BLUE HERON BLVD |
Longitude | 80° 3' 59.41 | ||||||||
RIVIERA BEACH, FL 33404-4311 | LL Method | AGPS | |||||||||
Contact | DAVID DANFORD | LL Status | REVIEWED | ||||||||
Phone | (561) 845-4185 | Status Date | 12/01/2001 | ||||||||
Account Owner Information | |||||||||||
Name | RIVIERA BCH CITY-UTILITY DIST WTP 800 W BLUE HERON BLVD West Palm Beach, FL 33404 |
Effective Date | 05/11/2010 | ||||||||
Contact | ALLEN DAVIS | ||||||||||
Phone | (561) 845-4185 | ||||||||||
DDANFORD@RIVIERABCH.COM | |||||||||||
Placard # / Date | 700490 - 08/07/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | RIVIERA BCH CITY 800 W BLUE HERON BLVD RIVIERA BEACH, FL 33419 |
Effective Date | 05/18/2007 | ||||||||
Contact | |||||||||||
Phone | (561) 845-4185 | ||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Emerg Generator Diesel (G) | 07/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(B) Steel/galvanized metal (C) Fiberglass (I) Suction piping system (M) Double wall - pipe jacket |
(8) Manually sampled wells (F) Monitor dbl wall tank space (I) Not required (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 1000 | Hazardous Substance (T) | ABOVEGROUND | In Service (U) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 1000 | Emerg Generator Diesel (G) | 04/01/2007 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact | (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Emerg Generator Diesel (G) | 07/01/1981 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass | (B) Steel/galvanized metal (I) Suction piping system |
(8) Manually sampled wells (Y) Unknown |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 12/15/2024 | 12/15/2025 | ILLINOIS UNION INSURANCE COMPANY | ||||||||
INSURANCE | 12/15/2022 | 12/15/2023 | ILLINOIS UNION INSURANCE COMPANY | ||||||||
INSURANCE | 12/15/2020 | 12/15/2021 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 12/15/2019 | 12/15/2020 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 12/15/2018 | 12/15/2019 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 12/15/2017 | 12/15/2018 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2016 | 12/15/2017 | INDIAN HARBOR INSURANCE COMPANY | ||||||||
INSURANCE | 10/01/2014 | 10/01/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/01/2013 | 10/01/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/01/2011 | 10/01/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/01/2010 | 10/01/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/01/2009 | 10/01/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/01/2008 | 10/01/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 03/06/2006 | 03/29/2006 | MINOR OUT-OF-COMPLIANCE | NORTON | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 05/04/2005 | 05/18/2005 | IN-COMPLIANCE | NORTON | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 02/12/2004 | 02/19/2004 | IN-COMPLIANCE | ARLINE | 1/1 | COMPLIANCE ASSURANCE | |||||
TCI | 05/02/2003 | 05/15/2003 | IN-COMPLIANCE | ARLINE | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 12/14/2001 | 12/20/2001 | IN-COMPLIANCE | ARLINE | 1/1 | COMPLIANCE ASSURANCE | |||||
CALL | 12/12/2000 | 12/13/2000 | IN-COMPLIANCE | ARLINE | 1/1 | COMPLIANCE ASSURANCE | |||||
TCI | 02/03/2000 | 02/07/2000 | IN-COMPLIANCE | ARLINE | 1/1 | COMPLIANCE ASSURANCE | |||||
TCI | 03/01/1999 | 03/24/1999 | IN-COMPLIANCE | WILLE | 1/1 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 04/14/2025 | Satisfied | EDWARDS_D_7 | Compliance Assistance | |||||||
Site Inspection | 03/18/2025 | Major Out of Compliance | EDWARDS_D_7 | 2/1 | Routine Compliance | ||||||
Enforcement Tracking | 03/04/2025 | Closed Without Enforcement | DUSKY_RL_2 | Enforcement | |||||||
Electronic Communication | 03/04/2025 | Satisfied | EDWARDS_D_7 | Compliance Assistance | |||||||
Electronic Communication | 01/24/2025 | Satisfied | FIORITO_AM_1 | Compliance Assistance | |||||||
Electronic Communication | 03/08/2024 | Satisfied | FIORITO_AM_1 | Compliance Assistance | |||||||
Electronic Communication | 12/28/2023 | Satisfied | FIORITO_AM_1 | Compliance Assistance | |||||||
Electronic Communication | 10/13/2023 | Satisfied | FIORITO_AM_1 | Compliance Assistance | |||||||
Electronic Communication | 05/19/2023 | Satisfied | FIORITO_AM_1 | Compliance Assistance | |||||||
Electronic Communication | 05/19/2023 | Satisfied | FIORITO_AM_1 | Compliance Assistance | |||||||
Enforcement Referral | 04/24/2023 | Accepted | DUSKY_RL_2 | Enforcement | |||||||
Electronic Communication | 02/27/2023 | Satisfied | FIORITO_AM_1 | Compliance Assistance | |||||||
Letter | 02/07/2023 | Satisfied | ESAU_KL_1 | Compliance Assistance | |||||||
Electronic Communication | 02/01/2023 | Satisfied | JENSEN_AS_2 | Routine Compliance | |||||||
Site Inspection | 02/01/2023 | Minor Out of Compliance | JENSEN_AS_2 | 0/1 | Routine Compliance | ||||||
TCAR | 12/14/2021 | Satisfied | DUSKY_RL_2 | Closure | |||||||
Letter | 12/14/2021 | Satisfied | DUSKY_RL_2 | Closure | |||||||
Site Inspection | 08/09/2021 | In Compliance | ARLINE_JD_1 | 0/1 | Component Closure | ||||||
Letter | 10/15/2020 | Satisfied | JENSEN_AS_2 | Compliance Assistance | |||||||
Site Inspection | 10/09/2020 | Major Out of Compliance | JENSEN_AS_2 | 1/1 | Routine Compliance | ||||||
Electronic Communication | 09/25/2020 | Satisfied | JENSEN_AS_2 | Routine Compliance | |||||||
Letter | 01/04/2019 | Satisfied | ESAU_KL_1 | Compliance Assistance | |||||||
Site Inspection | 11/29/2018 | In Compliance | MORRISON_CY_1 | 1/1 | Routine Compliance | ||||||
Electronic Communication | 02/17/2017 | Satisfied | ARDELEAN_AR_1 | Non-Compliance | |||||||
Electronic Communication | 02/10/2017 | Satisfied | ARDELEAN_AR_1 | Non-Compliance | |||||||
Electronic Communication | 02/10/2017 | Satisfied | ARDELEAN_AR_1 | Routine Compliance | |||||||
Electronic Communication | 01/12/2017 | Satisfied | ARDELEAN_AR_1 | Non-Compliance | |||||||
Electronic Communication | 01/12/2017 | Satisfied | ARDELEAN_AR_1 | Non-Compliance | |||||||
Letter | 01/12/2017 | Satisfied | ARDELEAN_AR_1 | Non-Compliance | |||||||
Site Inspection | 01/10/2017 | Major Out of Compliance | ARDELEAN_AR_1 | 1/1 | Routine Compliance | ||||||
Electronic Communication | 02/26/2015 | Satisfied | WILLE_PC_1 | Non-Compliance | |||||||
Letter | 01/05/2015 | Satisfied | THIBAUT_CR_1 | Non-Compliance | |||||||
Site Inspection | 12/16/2014 | Minor Out of Compliance | THIBAUT_CR_1 | 1/1 | Routine Compliance | ||||||
Electronic Communication | 05/22/2014 | Satisfied | ARLINE_JD_1 | Routine Compliance | |||||||
Letter | 05/05/2014 | Satisfied | ARLINE_JD_1 | Non-Compliance | |||||||
Site Inspection | 04/30/2014 | Minor Out of Compliance | ARLINE_JD_1 | 1/1 | Routine Compliance | ||||||
Electronic Communication | 04/14/2014 | Satisfied | WILLE_PC_1 | Non-Compliance | |||||||
Letter | 08/27/2012 | Satisfied | PUCCI_SA_1 | Non-Compliance | |||||||
Site Inspection | 08/20/2012 | Minor Out of Compliance | PUCCI_SA_1 | 2/1 | Routine Compliance | ||||||
Site Inspection | 06/07/2011 | In Compliance | PUCCI_SA_1 | 1/1 | Routine Compliance | ||||||
Site Inspection | 04/07/2010 | In Compliance | PUCCI_SA_1 | 2/1 | Routine Compliance | ||||||
Site Inspection | 08/19/2009 | Minor Out of Compliance | PUCCI_SA_1 | 1/1 | Non-Compliance | ||||||
Letter | 04/07/2009 | Satisfied | PUCCI_SA_1 | Non-Compliance | |||||||
Site Inspection | 04/07/2009 | Major Out of Compliance | PUCCI_SA_1 | 2/1 | Routine Compliance | ||||||
Record Document | 06/16/2008 | Satisfied | PUCCI_SA_1 | Non-Compliance | |||||||
Site Inspection | 06/05/2008 | Minor Out of Compliance | PUCCI_SA_1 | 2/1 | Non-Compliance | ||||||
Record Document | 06/05/2008 | Satisfied | PUCCI_SA_1 | Non-Compliance | |||||||
Letter | 05/12/2008 | Satisfied | PUCCI_SA_1 | Non-Compliance | |||||||
Site Inspection | 05/01/2008 | Major Out of Compliance | PUCCI_SA_1 | 2/1 | Routine Compliance | ||||||
Record Document | 11/01/2007 | Satisfied | WILLE_PC_1 | Routine Compliance | |||||||
Site Inspection | 04/19/2007 | In Compliance | PUCCI_SA_1 | 1/1 | Routine Compliance | ||||||
Record Document | 06/26/2006 | Satisfied | NORTON_P | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
03/17/2025 | 7005 | Minor | 1.5 Notification of installation, closure, or change in service status not received in required timeframes. | Email a written response explaining why notification was not provided to Roberta Dusky at RDusky@pbc.gov | |||||||
03/17/2025 | 7053 | SNC-B | 3.8 New integral piping not in contact with soil does not meet construction requirements. | Install Anti-Siphon Device to tank and email pictures to DeAundre Edwards at DEdwards1@pbc.gov | |||||||
03/17/2025 | 7103 | Minor | 1.12 Registration not updated for closure of storage tank system. | Update Registration to properly replace old AST with the New AST on Placard | |||||||
No Discharges Found |