![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/20/2025 Last Data Refresh: 04/19/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | State Government | ||||||||
County | Hillsborough | Status | OPEN | ||||||||
ID | 8841554 | Latitude | 27° 58' 8.1156 | ||||||||
Name |
FL DEPT OF TRANSPORTATION TAMPA MAINT YD 2820 LESLIE RD |
Longitude | 82° 21' 57.7332 | ||||||||
TAMPA, FL 33619-2224 | LL Method | DPHO | |||||||||
Contact | SEAN MCBRIDE | LL Status | REVIEWED | ||||||||
Phone | (813) 975-6267 | Status Date | 09/11/2009 | ||||||||
Account Owner Information | |||||||||||
Name | FL DEPT OF TRANSPORTATION DIST 7 11201 N MCKINLEY DR M/S 7-710 TAMPA, FL 33612 |
Effective Date | 05/20/1994 | ||||||||
Contact | MARCEL GOSS / ANITA MONTJOY 813-323-1141 | ||||||||||
Phone | (813) 975-6459 | ||||||||||
ANITA.MONTJOY@DOT.STATE.FL.US | |||||||||||
Placard # / Date | 696669 - 06/27/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | TIITF/DOT-ROADS OPS 3900 COMMONWEALTH BLVD TALLAHASSEE, FL 32399-6515 |
Effective Date | 06/17/2015 | ||||||||
Contact | |||||||||||
Phone | (813) 975-6267 | ||||||||||
D7FLEET@DOT.STATE.FL.US | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 10000 | Unleaded Gas (B) | 10/01/1997 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 10000 | Vehicular Diesel (D) | 10/01/1997 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
13 | 660 | Emerg Generator Diesel (G) | 04/01/2006 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (I) Suction piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Unleaded Gas (B) | 10/01/1997 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 10000 | Vehicular Diesel (D) | 10/01/1997 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system (K) Dispenser liners |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 1000 | Unleaded Gas (B) | 09/01/2002 | ABOVEGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1R1 | 10000 | Unleaded Gas (B) | 09/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2R1 | 4000 | Unleaded Gas (B) | 09/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3R1 | 10000 | Unleaded Gas (B) | 09/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4R1 | 10000 | Vehicular Diesel (D) | 09/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 09/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 550 | Waste Oil (L) | 12/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket |
(C) Fiberglass | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 888 | Unknown/Not Reported (Y) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 888 | Unknown/Not Reported (Y) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 888 | Unknown/Not Reported (Y) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 888 | Unknown/Not Reported (Y) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 1000 | Other Non Regulated (Z) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 11/09/2030 | ||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | |||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 11/09/2018 | 11/09/2030 | |||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 11/09/2018 | ||||||||||
EXEMPT-STATE OR FEDERAL GOVERNMENT ENTITY | 11/21/2007 | 11/21/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 01/12/2006 | 01/25/2006 | MINOR OUT-OF-COMPLIANCE | DIAZ_H | 5/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/09/2005 | 03/03/2005 | MINOR OUT-OF-COMPLIANCE | DIAZ_H | 5/0 | COMPLIANCE ASSURANCE | |||||
TCI | 03/11/2004 | 03/31/2004 | IN-COMPLIANCE | DIAZ_H | 5/0 | COMPLIANCE ASSURANCE | |||||
TCR | 11/07/2002 | 12/02/2002 | IN-COMPLIANCE | DIAZ_H | 5/0 | COMPLIANCE ASSURANCE | |||||
TIN | 11/01/2002 | 11/26/2002 | IN-COMPLIANCE | JACOBS_C | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 06/06/2002 | 06/24/2002 | MINOR OUT-OF-COMPLIANCE | DIAZ_H | 4/0 | COMPLIANCE ASSURANCE | |||||
TCI | 01/11/2001 | 01/24/2001 | IN-COMPLIANCE | DIAZ_H | 4/0 | COMPLIANCE ASSURANCE | |||||
TXI | 10/27/1999 | 11/05/1999 | IN-COMPLIANCE | COUNCIL_W | 4/0 | COMPLIANCE ASSURANCE | |||||
TCR | 10/27/1999 | 11/05/1999 | IN-COMPLIANCE | COUNCIL_W | 4/0 | COMPLIANCE ASSURANCE | |||||
TCI | 10/13/1999 | 10/29/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | COUNCIL_W | 4/1 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 02/25/2025 | Satisfied | SABOGAL_LE_1 | Routine Compliance | |||||||
Letter | 02/25/2025 | Satisfied | SABOGAL_LE_1 | Compliance Assistance | |||||||
Site Inspection | 02/25/2025 | Major Out of Compliance | SABOGAL_LE_1 | 6/0 | Routine Compliance | ||||||
Record Document | 08/13/2024 | Satisfied | LEHIGH_TS_1 | Compliance Assistance | |||||||
Letter | 08/13/2024 | Satisfied | LEHIGH_TS_1 | Compliance Assistance | |||||||
Document Management | 07/03/2024 | Satisfied | LEHIGH_TS_1 | Incident | |||||||
Incident | 07/03/2024 | Has not led to Discharge | LEHIGH_TS_1 | Incident | |||||||
Incident | 07/03/2024 | Has not led to Discharge | LEHIGH_TS_1 | Incident | |||||||
Document Management | 07/03/2024 | Satisfied | LEHIGH_TS_1 | Incident | |||||||
Site Inspection | 06/28/2024 | Major Out of Compliance | LEHIGH_TS_1 | 1/0 | Component Closure | ||||||
Letter | 06/28/2024 | Satisfied | LEHIGH_TS_1 | Compliance Assistance | |||||||
Electronic Communication | 05/22/2024 | Satisfied | LEHIGH_TS_1 | Compliance Assistance | |||||||
Electronic Communication | 03/11/2021 | Satisfied | JONES_K_11 | Routine Compliance | |||||||
Site Inspection | 03/10/2021 | Major Out of Compliance | JONES_K_11 | 6/0 | Routine Compliance | ||||||
Letter | 03/10/2021 | Satisfied | JONES_K_11 | Compliance Assistance | |||||||
Electronic Communication | 02/19/2021 | Satisfied | JONES_K_11 | Routine Compliance | |||||||
Document Management | 06/05/2019 | Satisfied | WINTER_CR_1 | Incident | |||||||
Electronic Communication | 06/05/2019 | Satisfied | WINTER_CR_1 | Compliance Assistance | |||||||
Letter | 06/05/2019 | Satisfied | WINTER_CR_1 | Compliance Assistance | |||||||
Incident | 06/05/2019 | Has not led to Discharge | WINTER_CR_1 | Incident | |||||||
Site Inspection | 11/20/2018 | Major Out of Compliance | WINTER_CR_1 | 6/0 | Routine Compliance | ||||||
Electronic Communication | 11/20/2018 | Satisfied | WINTER_CR_1 | Routine Compliance | |||||||
Electronic Communication | 11/20/2018 | Satisfied | WINTER_CR_1 | Routine Compliance | |||||||
Letter | 11/20/2018 | Satisfied | WINTER_CR_1 | Compliance Assistance | |||||||
Electronic Communication | 11/20/2018 | Satisfied | WINTER_CR_1 | Routine Compliance | |||||||
Document Management | 11/19/2018 | Satisfied | WINTER_CR_1 | Incident | |||||||
Incident | 11/19/2018 | Has not led to Discharge | WINTER_CR_1 | Incident | |||||||
Record Document | 12/05/2016 | Satisfied | ALEXANDER_A_1 | Routine Compliance | |||||||
Electronic Communication | 10/07/2016 | Satisfied | ALEXANDER_A_1 | Routine Compliance | |||||||
Site Inspection | 09/30/2016 | Major Out of Compliance | ALEXANDER_A_1 | 6/0 | Routine Compliance | ||||||
Letter | 09/30/2016 | Satisfied | ALEXANDER_A_1 | Non-Compliance | |||||||
Electronic Communication | 09/20/2016 | Satisfied | ALEXANDER_A_1 | Routine Compliance | |||||||
Phone Conversation | 09/19/2016 | Satisfied | ALEXANDER_A_1 | Routine Compliance | |||||||
Electronic Communication | 12/17/2014 | Satisfied | WHITE_JA_1 | Routine Compliance | |||||||
Site Inspection | 12/16/2014 | In Compliance | WHITE_JA_1 | 6/0 | Routine Compliance | ||||||
Site Inspection | 07/25/2012 | In Compliance | HAMBY_MB_1 | 6/0 | Routine Compliance | ||||||
Site Inspection | 09/22/2011 | In Compliance | HAMBY_MB_1 | 4/0 | Non-Compliance | ||||||
Incident | 09/22/2011 | Has not led to Discharge | HAMBY_MB_1 | Incident | |||||||
Document Management | 09/22/2011 | Complete | HAMBY_MB_1 | Incident | |||||||
Site Inspection | 09/08/2011 | In Compliance | HAMBY_MB_1 | 6/0 | Installation | ||||||
Site Inspection | 09/07/2011 | Major Out of Compliance | HAMBY_MB_1 | 6/0 | Routine Compliance | ||||||
Record Document | 09/07/2011 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Letter | 09/07/2011 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Record Document | 12/16/2009 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Letter | 08/27/2009 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Site Inspection | 08/27/2009 | Minor Out of Compliance | HAMBY_MB_1 | 6/0 | Routine Compliance | ||||||
Enforcement Referral | 03/24/2009 | Accepted | MURLEY_A_1 | Enforcement | |||||||
Enforcement Tracking | 03/24/2009 | Closed With Enforcement | HAMBY_MB_1 | Enforcement | |||||||
Record Document | 12/10/2008 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Record Document | 12/10/2008 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Site Inspection | 10/08/2008 | Major Out of Compliance | HAMBY_MB_1 | 6/0 | Routine Compliance | ||||||
Letter | 10/08/2008 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Record Document | 06/17/2008 | Satisfied | MURLEY_A_1 | Installation | |||||||
Record Document | 06/17/2008 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Letter | 11/30/2007 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Site Inspection | 11/30/2007 | Minor Out of Compliance | HAMBY_MB_1 | 6/0 | Routine Compliance | ||||||
Site Inspection | 10/11/2007 | In Compliance | HAMBY_MB_1 | 6/0 | Non-Compliance | ||||||
Enforcement Referral Activity - OLD | 04/17/2007 | Terminated | CULBRETH_L | Enforcement | |||||||
Site Inspection | 02/13/2007 | Major Out of Compliance | HAMBY_MB_1 | 6/0 | Non-Compliance | ||||||
Letter | 02/13/2007 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Issue Document | 01/30/2007 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Site Inspection | 01/05/2007 | Major Out of Compliance | HAMBY_MB_1 | 6/0 | Non-Compliance | ||||||
Letter | 01/05/2007 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Letter | 12/22/2006 | Satisfied | HAMBY_MB_1 | Non-Compliance | |||||||
Site Inspection | 12/22/2006 | Major Out of Compliance | HAMBY_MB_1 | 6/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/25/2025 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Conduct and record release detection operability testing and send documentation to EPC for review. | |||||||
02/25/2025 | 7013 | Minor | 3.4 Incident investigation leading to discharge not completed within 14 days, or No DRF or written confirmation received after 14 day investigation period. | Submit investigation results for the positive response of release detection device to EPC within 2 weeks. | |||||||
02/25/2025 | 7007 | Minor | 3.1 Incident Notification Form (INF) not received in a timely manner. | Submit an INF for the positive response of release detection device to EPC for review. | |||||||
02/25/2025 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Conduct and record overfill operability testing and send documentation to EPC for review. | |||||||
02/25/2025 | 7065 | SNC-B | 1.6 Storage tank system not visually inspected once a month. | Submit February 2025 log for Tank #13 to EPC for review. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
12/18/1990 | COMPLETED | 30 | PETROLEUM CLEANUP PARTICIPATION PROGRAM-ELIGIBLE | ||||||||