![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 03/19/2025 Last Data Refresh: 03/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8842290 | Latitude | 25° 26' 54.4804 | ||||||||
Name |
Circle K #2709009 16 N KROME AVE |
Longitude | 80° 28' 38.8926 | ||||||||
HOMESTEAD, FL 33034-3408 | LL Method | DPHO | |||||||||
Contact | Andrew Burress | LL Status | REVIEWED | ||||||||
Phone | (984) 389-1258 | Status Date | 09/04/2019 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 04/27/2023 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 697879 - 06/28/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 04/27/2023 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 12000 | Unleaded Gas (B) | 04/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (Q) DEP approved protection (R) Double wall - tank jacket |
(C) Fiberglass (D) External protective coating (M) Double wall - pipe jacket (P) Internal pipe/internal sump riser |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring (O) Vapor monitoring (Q) Visual inspection of ASTs (R) Monitor tank bottom space (S) Statistical Inventory Reconcile (T) Annual tightness test/Inventory |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 12000 | Vehicular Diesel (D) | 04/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (Q) DEP approved protection (R) Double wall - tank jacket |
(C) Fiberglass (D) External protective coating (M) Double wall - pipe jacket (P) Internal pipe/internal sump riser |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs (N) Groundwater monitoring (O) Vapor monitoring (Q) Visual inspection of ASTs (R) Monitor tank bottom space (S) Statistical Inventory Reconcile (T) Annual tightness test/Inventory |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 10000 | Unleaded Gas (B) | 04/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (P) Level gauges/alarms (Q) DEP approved protection (R) Double wall - tank jacket |
(C) Fiberglass (D) External protective coating (M) Double wall - pipe jacket (P) Internal pipe/internal sump riser |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (E) Monitor UST/liner space (F) Monitor dbl wall tank space (G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring (O) Vapor monitoring (Q) Visual inspection of ASTs (R) Monitor tank bottom space (S) Statistical Inventory Reconcile (T) Annual tightness test/Inventory |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Leaded Gas (A) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 4000 | Unleaded Gas (B) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4000 | Leaded Gas (A) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 4000 | Unleaded Gas (B) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 4000 | Unleaded Gas (B) | 07/01/1968 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(B) Internal lining (C) Steel |
(B) Steel/galvanized metal | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 8000 | Unleaded Gas (B) | 02/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 8000 | Unleaded Gas (B) | 02/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 8000 | Unleaded Gas (B) | 02/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 8000 | Unleaded Gas (B) | 02/01/1990 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/30/2023 | 08/28/2024 | |||||||||
INSURANCE | 02/08/2021 | 02/08/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 02/08/2019 | 02/08/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 02/08/2018 | 02/08/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 02/08/2017 | 02/08/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/24/2015 | 01/24/2016 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 12/24/2013 | 12/24/2015 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 01/24/2013 | 01/24/2015 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 01/24/2011 | 01/24/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/24/2010 | 01/24/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/24/2009 | 01/24/2010 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 03/03/2006 | 03/09/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | CAJUSTE, P | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/17/2006 | 01/30/2006 | SIGNIFICANT OUT-OF-COMPLIANCE | CAJUSTE, P | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 06/29/2005 | 06/30/2005 | IN-COMPLIANCE | HARRIS, J | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 05/13/2005 | 05/20/2005 | MINOR OUT-OF-COMPLIANCE | HARRIS, J | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 02/12/2004 | 02/13/2004 | IN-COMPLIANCE | BOWEN, O | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/26/2004 | 02/02/2004 | MINOR OUT-OF-COMPLIANCE | BOWEN, O | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 04/07/2003 | 04/10/2003 | IN-COMPLIANCE | BOWEN, O | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/16/2003 | 01/21/2003 | MINOR OUT-OF-COMPLIANCE | BOWEN, O | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 04/08/2002 | 04/29/2002 | IN-COMPLIANCE | ROMAN, A | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 04/30/2001 | 05/03/2001 | IN-COMPLIANCE | ROMAN, A | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 04/03/2001 | 04/19/2001 | MINOR OUT-OF-COMPLIANCE | ROMAN, A | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/26/2000 | 02/04/2000 | IN-COMPLIANCE | ROBERTS, A | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 05/21/1999 | 05/26/1999 | IN-COMPLIANCE | CHUNG, T | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 05/04/1999 | 06/03/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | CHUNG, T | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 12/29/2023 | Satisfied | PAAN_GE_1 | Compliance Assistance | |||||||
Site Inspection | 12/29/2023 | Major Out of Compliance | PAAN_GE_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 12/22/2023 | Satisfied | PAAN_GE_1 | Routine Compliance | |||||||
Letter | 09/29/2021 | Satisfied | GRIMALDO_JN_1 | Compliance Assistance | |||||||
Site Inspection | 09/28/2021 | Minor Out of Compliance | GRIMALDO_JN_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 09/16/2021 | Satisfied | GRIMALDO_JN_1 | Routine Compliance | |||||||
Letter | 01/06/2020 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Site Inspection | 01/06/2020 | In Compliance | DEZAYAS_A_1 | 0/3 | Compliance Assistance | ||||||
Electronic Communication | 10/02/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Site Inspection | 09/04/2019 | Minor Out of Compliance | DEZAYAS_A_1 | 0/3 | Routine Compliance | ||||||
Letter | 09/04/2019 | Satisfied | DEZAYAS_A_1 | Compliance Assistance | |||||||
Electronic Communication | 09/04/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 08/20/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Phone Conversation | 08/20/2019 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Letter | 03/06/2018 | Satisfied | FERNANDEZBANGO_CE_1 | Compliance Assistance | |||||||
Record Document | 12/08/2017 | Satisfied | FERNANDEZBANGO_CE_1 | Compliance Assistance | |||||||
Electronic Communication | 11/07/2017 | Satisfied | FERNANDEZBANGO_CE_1 | Compliance Assistance | |||||||
Site Inspection | 11/07/2017 | In Compliance | FERNANDEZBANGO_CE_1 | 0/3 | Compliance Assistance | ||||||
Letter | 11/07/2017 | Satisfied | FERNANDEZBANGO_CE_1 | Non-Compliance | |||||||
Electronic Communication | 10/02/2017 | Satisfied | FERNANDEZBANGO_CE_1 | Compliance Assistance | |||||||
Site Inspection | 04/18/2017 | Major Out of Compliance | FERNANDEZBANGO_CE_1 | 0/3 | Routine Compliance | ||||||
Electronic Communication | 04/06/2017 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Phone Conversation | 05/12/2015 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/12/2015 | Satisfied | FERNANDEZBANGO_CE_1 | Routine Compliance | |||||||
Site Inspection | 05/12/2015 | In Compliance | FERNANDEZBANGO_CE_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 11/21/2013 | In Compliance | LINCHETA_CR_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 09/26/2013 | Minor Out of Compliance | BARTHELEMY_BX_1 | 0/3 | Non-Compliance | ||||||
Document Management | 08/05/2013 | Complete | BARTHELEMY_BX_1 | Routine Compliance | |||||||
Site Inspection | 08/05/2013 | Minor Out of Compliance | BARTHELEMY_BX_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/02/2013 | Satisfied | BARTHELEMY_BX_1 | Routine Compliance | |||||||
Phone Conversation | 08/02/2013 | Satisfied | BARTHELEMY_BX_1 | Routine Compliance | |||||||
Site Inspection | 04/18/2013 | Minor Out of Compliance | DASHTAKI_K_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/18/2013 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Letter | 04/18/2013 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Phone Conversation | 04/18/2013 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 04/27/2011 | In Compliance | LINCHETA_CR_1 | 0/3 | Non-Compliance | ||||||
Letter | 03/31/2011 | Satisfied | LINCHETA_CR_1 | Non-Compliance | |||||||
Site Inspection | 03/30/2011 | Major Out of Compliance | LINCHETA_CR_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/16/2011 | Satisfied | LINCHETA_CR_1 | Routine Compliance | |||||||
Site Inspection | 06/07/2010 | In Compliance | CAJUSTE_PJ_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 05/25/2010 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/3 | Routine Compliance | ||||||
Letter | 05/25/2010 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||||||
Site Inspection | 05/25/2010 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 04/28/2009 | In Compliance | CAJUSTE_PJ_1 | 0/3 | Non-Compliance | ||||||
Enforcement Tracking | 04/28/2009 | Closed Without Enforcement | CAJUSTE_PJ_1 | Enforcement | |||||||
Enforcement Referral | 03/17/2009 | Accepted | CAJUSTE_PJ_1 | Enforcement | |||||||
Letter | 03/17/2009 | Satisfied | CAJUSTE_PJ_1 | Non-Compliance | |||||||
Site Inspection | 03/17/2009 | Minor Out of Compliance | CAJUSTE_PJ_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 04/16/2008 | In Compliance | CAJUSTE_PJ_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | CAMACHO_D | Routine Compliance | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | CAMACHO_D | Routine Compliance | |||||||
Site Inspection | 04/30/2007 | In Compliance | CAJUSTE_PJ_1 | 0/3 | Installation | ||||||
Site Inspection | 03/23/2007 | In Compliance | CAJUSTE_PJ_1 | 0/4 | Closure | ||||||
Emergency Preparedness Information | 02/06/2007 | Satisfied | CAJUSTE_PJ_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | CAJUSTE_PJ_1 | Routine Compliance | |||||||
Letter | 08/02/2006 | Satisfied | SIRMAN_C | Non-Compliance | |||||||
Site Inspection | 08/01/2006 | In Compliance | CAJUSTE_PJ_1 | 0/4 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/22/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current and passing Integrity Testing for Regular, Premium, and Rec-90 STP Sumps. | |||||||
12/22/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Replace the broken Piping Boot. | |||||||
12/22/2023 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide current and passing Annual Operability Testing for Overfill Protection. | |||||||
12/18/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Pump out or remove liquid from Dispenser, Fill Port Spill Buckets, and Piping Sump such that they are emptied. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/07/2008 | COMPLETED | 30 | |||||||||
07/18/1988 | ACTIVE | 30 | EARLY DETECTION INCENTIVE-ELIGIBLE | CASTRO, MONICA R. | 3053726808 | ||||||