![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Monroe | Status | OPEN | ||||||||
ID | 8842365 | Latitude | 24° 34' 2.8278 | ||||||||
Name |
CIRCLE K #2708815 3032 N ROOSEVELT BLVD |
Longitude | 81° 46' 8.9095 | ||||||||
KEY WEST, FL 33040-4016 | LL Method | DPHO | |||||||||
Contact | Sarah Conner | LL Status | REVIEWED | ||||||||
Phone | (919) 410-2889 | Status Date | 10/10/2003 | ||||||||
Account Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 05/20/1994 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Placard # / Date | 704671 - 12/12/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | CIRCLE K STORES INC 1100 Situs Ct Raleigh, NC 27606-5446 |
Effective Date | 05/20/1994 | ||||||||
Contact | IRA LEWIS | ||||||||||
Phone | (423) 400-2480 | ||||||||||
ILEWIS@CIRCLEK.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 20000 | Unleaded Gas (B) | 10/03/2024 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 20000 | Vehicular Diesel (D) | 10/03/2024 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (L) Compartmented (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 12000 | Unleaded Gas (B) | 10/04/2024 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Vehicular Diesel (D) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 3000 | Other Non Regulated (Z) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (Y) Unknown | (X) None | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
GUARANTEE | 04/24/2022 | 08/26/2025 | |||||||||
GUARANTEE | 04/25/2021 | 08/27/2022 | |||||||||
INSURANCE | 12/01/2018 | 12/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2016 | 12/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2014 | 12/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 12/01/2012 | 12/01/2013 | CHUBB | ||||||||
INSURANCE | 12/17/2010 | 12/17/2011 | CHUBB | ||||||||
INSURANCE | 12/18/2009 | 12/17/2010 | CHUBB | ||||||||
INSURANCE | 12/17/2007 | 12/17/2008 | AMERICAN INTERNATIONAL SPECIALTY LINES | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
NCLI | 10/10/2005 | HAMMONTREE | 0/3 | COMPLIANCE ASSURANCE | |||||||
TCI | 10/10/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | HAMMONTREE | 0/3 | COMPLIANCE ASSURANCE | ||||||
LTR | 12/17/2004 | 12/20/2004 | LOWE | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes LETTER STATING THAT SITE IS IN COMPLAINCE | |||||||||||
TCI | 12/15/2004 | 12/20/2004 | IN-COMPLIANCE | LOWE | 0/3 | COMPLIANCE ASSURANCE | |||||
DSUC | 07/20/2004 | 07/20/2004 | PEREZ | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes STATUS TO BE DETERMINED BY DEP TALLAHASSEE CLEANUP. | |||||||||||
NCLI | 07/06/2004 | 07/19/2004 | ROGGELIN, ERNEST | 0/0 | DISCHARGE PROJECT | ||||||
NCLI | 07/06/2004 | 07/19/2004 | ROGGELIN, E. | 0/0 | COMPLIANCE ASSURANCE | ||||||
LTR | 07/06/2004 | 07/19/2004 | ROGGELIN, E. | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CLOSURE CRITIQUE | |||||||||||
NCLI | 07/06/2004 | 07/19/2004 | ROGGELIN, ERNEST | 0/0 | COMPLIANCE ASSURANCE | ||||||
TDI | 06/23/2004 | 07/19/2004 | MINOR OUT-OF-COMPLIANCE | KRUPPA, FRANK | 0/3 | DISCHARGE PROJECT | |||||
TXI | 06/23/2004 | 06/23/2004 | MINOR OUT-OF-COMPLIANCE | KRUPPA | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST-CLOSURE INSPECTION - NO NOTICE OF ACTIVITY FROM FACILITY OR CONTRACTOR; REPLACEMENT OF 3 SPILL CONTAINMENT UNITS | |||||||||||
TIN | 06/23/2004 | 06/23/2004 | MINOR OUT-OF-COMPLIANCE | KRUPPA | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST-INSTALLATION INSPECTION - NEITHER CONTRACTOR NOR OWNER NOTIFIED AGENCY OF EVENT; REPLACEMENT OF SPILL CONTAINMENT UNITS (3) | |||||||||||
RRBD | 06/22/2004 | 07/19/2004 | ROGGELIN, E. | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ECS CLOSURE REPORT - SPILL CONTAINMENT | |||||||||||
RRBD | 06/02/2004 | 06/23/2004 | KRUPPA | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes ATC ASSOCIATES EVENT SUMMARY - OVERVIEW OF CONTAMINATION, NO LAB ANALYTICAL DATA YET | |||||||||||
DRFR | 03/31/2004 | 06/23/2004 | KRUPPA | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DUE DILIGENCE INVESTIGATION - NO ANALYTICAL DATA YET | |||||||||||
RRBD | 01/14/2004 | 03/12/2004 | TREBESCH | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes MS. RANCONY SENT LETTER AND DOCUMENTATION ADDRESSING THE CORRECTIVE ACTIONS TAKEN. | |||||||||||
NCLI | 11/24/2003 | 11/24/2003 | TREBESCH | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/21/2003 | 11/24/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | TREBESCH | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 12/12/2002 | 12/13/2002 | IN-COMPLIANCE | DEIDRICK | 0/3 | COMPLIANCE ASSURANCE | |||||
LTR | 05/06/2002 | 05/23/2002 | COMPLIANCE ASSURANCE | ||||||||
TCI | 03/13/2002 | 03/13/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | SHULAW | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 03/15/2001 | 03/16/2001 | MINOR OUT-OF-COMPLIANCE | SHULAW_B | 0/2 | COMPLIANCE ASSURANCE | |||||
LTR | 09/13/2000 | 09/13/2000 | LAWRENCE_W | 0/3 | COMPLIANCE ASSURANCE | ||||||
PDNE | 09/01/2000 | 09/13/2000 | LAWRENCE_W | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REFERRAL LETTER FOR JOHN' SITE | |||||||||||
NCLI | 04/24/2000 | 04/24/2000 | CARTER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECHECK | |||||||||||
TCI | 04/20/2000 | 04/24/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | CARTER_J | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes ROUTINE COMPLIANCE INSPECTION. | |||||||||||
NCLI | 02/18/1999 | 03/17/1999 | CARTER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/21/1999 | 03/17/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | CARTER_J | 0/3 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Discharge Reporting | 03/17/2025 | Satisfied | FORREST_C | Discharge | |||||||
Record Document | 03/07/2025 | Satisfied | FORREST_C | Discharge | |||||||
Enforcement Referral | 03/05/2025 | Accepted | FORREST_C | Enforcement | |||||||
Site Inspection | 02/03/2025 | Minor Out of Compliance | SMITH_SAM | 0/3 | Installation | ||||||
Site Inspection | 02/03/2025 | Major Out of Compliance | FORREST_C | 0/3 | Closure | ||||||
TCAR | 02/03/2025 | Satisfied | FORREST_C | Closure | |||||||
Site Inspection | 02/03/2025 | Major Out of Compliance | FORREST_C | 0/3 | Routine Compliance | ||||||
Document Management | 06/27/2024 | Satisfied | USECHE_V | Enforcement | |||||||
Enforcement Referral | 11/16/2023 | Accepted | SMITH_SAM | Enforcement | |||||||
Letter | 10/17/2022 | Satisfied | DOLAN_J | Compliance Assistance | |||||||
Site Inspection | 10/04/2022 | Major Out of Compliance | PARDAL_L | 0/3 | Routine Compliance | ||||||
Incident | 06/17/2020 | Has not led to Discharge | WINKLER_MG_1 | Incident | |||||||
Document Management | 04/23/2020 | Satisfied | WINKLER_MG_1 | Incident | |||||||
Incident | 04/23/2020 | Has not led to Discharge | WINKLER_MG_1 | Incident | |||||||
Letter | 08/08/2019 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Site Inspection | 08/08/2019 | In Compliance | WINKLER_MG_1 | 0/3 | Routine Compliance | ||||||
Record Document | 02/08/2018 | Satisfied | WINKLER_MG_1 | Compliance Assistance | |||||||
Document Management | 12/05/2017 | Satisfied | WINKLER_MG_1 | Incident | |||||||
Letter | 10/13/2017 | Satisfied | WINKLER_MG_1 | Compliance Assistance | |||||||
Site Inspection | 10/12/2017 | Minor Out of Compliance | WINKLER_MG_1 | 0/3 | Routine Compliance | ||||||
Record Document | 09/27/2016 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Record Document | 01/15/2016 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Incident | 01/08/2016 | Has not led to Discharge | WINKLER_MG_1 | Incident | |||||||
Document Management | 12/07/2015 | Complete | WINKLER_MG_1 | Incident | |||||||
Site Inspection | 11/13/2015 | In Compliance | WINKLER_MG_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 09/11/2015 | Minor Out of Compliance | WINKLER_MG_1 | 0/3 | Routine Compliance | ||||||
Letter | 09/11/2015 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Record Document | 09/11/2015 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Letter | 10/24/2013 | Satisfied | WINKLER_MG_1 | Non-Compliance | |||||||
Site Inspection | 10/23/2013 | Minor Out of Compliance | WINKLER_MG_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/21/2013 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Document Management | 06/13/2011 | Complete | BEVARD_TK_1 | Incident | |||||||
Document Management | 06/02/2011 | Complete | BEVARD_TK_1 | Incident | |||||||
Site Inspection | 06/02/2011 | Minor Out of Compliance | BEVARD_TK_1 | 0/3 | Routine Compliance | ||||||
Incident | 06/01/2011 | Has not led to Discharge | BEVARD_TK_1 | Incident | |||||||
Site Inspection | 02/17/2011 | Minor Out of Compliance | BEVARD_TK_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/22/2010 | Satisfied | LICHTLER_GB_1 | Non-Compliance | |||||||
Site Inspection | 02/17/2010 | Minor Out of Compliance | LICHTLER_GB_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 11/18/2008 | In Compliance | SMITH_RR | 0/3 | Installation | ||||||
Site Inspection | 11/18/2008 | In Compliance | SMITH_RR | 0/3 | Closure | ||||||
Site Inspection | 11/12/2008 | Minor Out of Compliance | SMITH_RR | 0/2 | Routine Compliance | ||||||
Site Inspection | 11/07/2008 | Major Out of Compliance | SMITH_RR | 0/4 | Routine Compliance | ||||||
Letter | 11/07/2008 | Satisfied | SMITH_RR | Non-Compliance | |||||||
Site Inspection | 06/06/2008 | Major Out of Compliance | SMITH_RR | 0/4 | Routine Compliance | ||||||
Letter | 06/06/2008 | Satisfied | SMITH_RR | Non-Compliance | |||||||
Emergency Preparedness Information | 01/15/2008 | Satisfied | WINKLER_MG_1 | Routine Compliance | |||||||
Record Document | 07/17/2007 | Satisfied | HAMMONTREE_TD | Installation | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | HAMMONTREE_TD | Routine Compliance | |||||||
Emergency Preparedness Information | 05/22/2007 | Satisfied | HAMMONTREE_TD | Routine Compliance | |||||||
Emergency Preparedness Information | 02/08/2007 | Satisfied | HAMMONTREE_TD | Routine Compliance | |||||||
Meeting | 10/31/2006 | Satisfied | HAMMONTREE_TD | Non-Compliance | |||||||
Site Inspection | 10/30/2006 | In Compliance | HAMMONTREE_TD | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | HAMMONTREE_TD | Routine Compliance | |||||||
Record Document | 08/15/2006 | Satisfied | HAMMONTREE_TD | Routine Compliance | |||||||
Record Document | 03/17/2006 | Satisfied | HAMMONTREE_TD | Routine Compliance | |||||||
Meeting | 03/17/2006 | Satisfied | HAMMONTREE_TD | Non-Compliance | |||||||
Letter | 03/17/2006 | Satisfied | HAMMONTREE_TD | Non-Compliance | |||||||
Meeting | 03/07/2006 | Satisfied | HAMMONTREE_TD | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/10/2025 | 6067 | Minor | 4.5 Integrity test not completed before being placed into operation or service. | Conduct and provide testing documentation for the Regular spill bucket to the Department. Repair or replace the Diesel spill bucket. | |||||||
01/10/2025 | 6081 | SNC-A | 4.12 Storage tank system closure requirements not met that resulted in a discharge. | Ensure that all fragments of the contaminated tank have been removed. Conduct environmental sampling to determine if the area is now clean. | |||||||
01/08/2025 | 6065 | SNC-B | 4.3 Damaged system not taken out of service or out of operation until repair is made. | Place damaged tanks out of service in a timely fashion until repairs or replacement occurs. Promptly repair or replace failing components to prevent harm to the environment. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
08/20/2024 | INACTIVE | ||||||||||
10/19/1994 | COMPLETED | 10 | |||||||||
11/08/1988 | COMPLETED | 10 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||