![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/23/2025 Last Data Refresh: 02/22/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8942621 | Latitude | 25° 56' 31.0986 | ||||||||
Name |
GARDEN PETROLEUM INC 1695 NW 183RD ST |
Longitude | 80° 13' 44.5654 | ||||||||
MIAMI, FL 33169-3613 | LL Method | DPHO | |||||||||
Contact | MOHAMMED D KHAN | LL Status | REVIEWED | ||||||||
Phone | (305) 624-8843 | Status Date | 02/12/2024 | ||||||||
Account Owner Information | |||||||||||
Name | GARDEN PETROLEUM INC 1695 NW 183RD ST MIAMI GARDENS, FL 33169 |
Effective Date | 10/05/2018 | ||||||||
Contact | DINAJ KHAN | ||||||||||
Phone | (954) 520-0822 | ||||||||||
DINAJKHAN@YAHOO.COM | |||||||||||
Placard # / Date | 686684 - 06/11/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | E & J CANDELARIA CORPORATION 1695 NW 183 STREET MIAMI, FL 33169 |
Effective Date | 10/14/2016 | ||||||||
Contact | |||||||||||
Phone | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 12000 | Ethanol E10 (8) | 10/01/2014 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 10000 | Vehicular Diesel (D) | 10/01/2014 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 4000 | Leaded Gas (A) | 07/01/1956 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 07/01/1969 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 550 | Waste Oil (L) | 07/01/1956 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 6000 | Unleaded Gas (B) | 03/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 03/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 03/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 03/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
NONE | |||||||||||
INSURANCE | 12/16/2021 | 12/16/2022 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 12/16/2019 | 12/16/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 12/16/2016 | 12/16/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 12/16/2014 | 12/16/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/05/2009 | 07/05/2010 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 02/08/2006 | 02/13/2006 | IN-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 05/13/2005 | 05/18/2005 | IN-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 04/22/2005 | 04/27/2005 | MINOR OUT-OF-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/24/2004 | 03/25/2004 | SHER, R | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCR | 02/10/2004 | 02/13/2004 | MINOR OUT-OF-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/13/2004 | 01/21/2004 | MINOR OUT-OF-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/04/2003 | 02/10/2003 | SHER, R | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCR | 01/30/2003 | 02/04/2003 | MINOR OUT-OF-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/13/2003 | 01/14/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 02/25/2002 | 02/28/2002 | SHER, R | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/29/2002 | 02/05/2002 | MINOR OUT-OF-COMPLIANCE | SHER, R | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 02/12/2001 | 02/20/2001 | IN-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/10/2000 | 03/15/2000 | IN-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 06/17/1999 | 07/29/1999 | IN-COMPLIANCE | SHER, R | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 02/21/2025 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Letter | 02/21/2025 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Site Inspection | 02/21/2025 | Major Out of Compliance | RODRIGUEZ_F | 0/2 | Routine Compliance | ||||||
Electronic Communication | 04/04/2022 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Letter | 02/22/2022 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Site Inspection | 02/22/2022 | In Compliance | JACQUET_F_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/07/2022 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Electronic Communication | 10/19/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 10/16/2020 | In Compliance | JACQUET_F_1 | 0/2 | Compliance Assistance | ||||||
Incident | 10/16/2020 | Has not led to Discharge | JACQUET_F_1 | Incident | |||||||
Letter | 10/16/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Document Management | 10/16/2020 | Satisfied | JACQUET_F_1 | Incident | |||||||
Electronic Communication | 04/29/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 04/27/2020 | Major Out of Compliance | JACQUET_F_1 | 0/2 | Routine Compliance | ||||||
Letter | 04/27/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Phone Conversation | 04/02/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Electronic Communication | 04/02/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Electronic Communication | 04/02/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Phone Conversation | 03/10/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Electronic Communication | 03/06/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Enforcement Tracking | 02/28/2019 | Closed Without Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
Document Management | 02/28/2019 | Satisfied | CHIRINO_AM_1 | Enforcement | |||||||
Electronic Communication | 06/05/2017 | Satisfied | DEZAYAS_A_1 | Non-Compliance | |||||||
Site Inspection | 05/31/2017 | In Compliance | DEZAYAS_A_1 | 0/2 | Non-Compliance | ||||||
Phone Conversation | 05/17/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 05/17/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 05/17/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Letter | 04/28/2017 | Satisfied | DEZAYAS_A_1 | Non-Compliance | |||||||
Site Inspection | 04/28/2017 | Major Out of Compliance | DEZAYAS_A_1 | 0/2 | Routine Compliance | ||||||
TCAR | 11/04/2015 | Satisfied | MAS_JR_1 | Closure | |||||||
Letter | 11/04/2015 | Satisfied | MAS_JR_1 | Closure | |||||||
Site Inspection | 05/26/2015 | In Compliance | DEZAYAS_A_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 05/13/2015 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/13/2015 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Document Management | 04/29/2015 | Complete | CHIRINO_AM_1 | Enforcement | |||||||
Enforcement Tracking | 01/29/2015 | Closed Without Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
Enforcement Referral | 01/29/2015 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Document Management | 01/28/2015 | Complete | CHIRINO_AM_1 | Enforcement | |||||||
Enforcement Tracking | 01/28/2015 | Closed Without Enforcement | CHIRINO_AM_1 | Enforcement | |||||||
Site Inspection | 12/15/2014 | In Compliance | RUNTE_C_3 | 0/2 | Installation | ||||||
Site Inspection | 10/10/2014 | In Compliance | RUNTE_C_3 | 0/4 | Closure | ||||||
Phone Conversation | 07/26/2013 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 07/26/2013 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Document Management | 06/05/2013 | Complete | CHIRINO_AM_1 | Enforcement | |||||||
Enforcement Referral | 04/19/2013 | Accepted | CHIRINO_AM_1 | Enforcement | |||||||
Letter | 09/25/2012 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/25/2012 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 09/25/2012 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/21/2011 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 07/20/2011 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 07/12/2010 | In Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Meeting | 04/08/2010 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Document Management | 02/04/2010 | Complete | CORREA_LI_1 | Routine Compliance | |||||||
Meeting | 01/06/2010 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Enforcement Referral | 07/28/2009 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 07/28/2009 | Minor Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Letter | 07/28/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Issue Document | 07/28/2009 | Satisfied | DASHTAKI_K_1 | Enforcement | |||||||
Enforcement Tracking | 01/22/2009 | Closed Without Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 01/22/2009 | In Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
Issue Document | 12/26/2008 | Satisfied | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 12/26/2008 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Letter | 12/26/2008 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Enforcement Referral | 12/26/2008 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 03/21/2008 | In Compliance | SHER_RC_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 03/18/2008 | Minor Out of Compliance | SHER_RC_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 02/20/2008 | Minor Out of Compliance | SHER_RC_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 02/06/2008 | Minor Out of Compliance | SHER_RC_1 | 0/4 | Routine Compliance | ||||||
Letter | 02/06/2008 | Satisfied | SHER_RC_1 | Non-Compliance | |||||||
Site Inspection | 04/03/2007 | In Compliance | SHER_RC_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 03/23/2007 | Minor Out of Compliance | SHER_RC_1 | 0/4 | Non-Compliance | ||||||
Emergency Preparedness Information | 02/05/2007 | Satisfied | SHER_RC_1 | Routine Compliance | |||||||
Letter | 02/02/2007 | Satisfied | SHER_RC_1 | Non-Compliance | |||||||
Site Inspection | 02/02/2007 | Minor Out of Compliance | SHER_RC_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | SHER_RC_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/21/2025 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current and passing annual Spill Bucket Integrity test | |||||||
02/21/2025 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair the missing sensor in the Liquid Status Report of the STP sump sensor for the Regular UST. | |||||||
02/21/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Access needs to be provided to the three (3) STP sumps. Once opened, submit photos of the sump interior showing product piping secondary containment boot, and sensor, positions. | |||||||
02/21/2025 | 6056 | SNC-B | 2.4 Release detection not tested or visually inspected once a month or problems found during the visual inspections not recorded. | Provide current monthly visual Inspection logs for the tank system. | |||||||
02/21/2025 | 6061 | SNC-B | 4.12 Release detection devices for integral piping do not meet general standards. | Provide current and passing annual operability of the mechanical line leak detectors | |||||||
02/21/2025 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Provide current Certificate of Financial Responsibility (Tank Insurance). | |||||||
02/21/2025 | 6043 | Minor | 4.13 Fillbox covers not marked according to requirements. | Properly color code the Fill port box and monitoring wells lids as per API standards. | |||||||
02/21/2025 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Access needs to be provided to the six (6) dispenser sumps. Once opened, submit photos of the liner interior showing shear valves, and product piping secondary containment boot positions. | |||||||
02/21/2025 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Provide current and passing annual operability test of the release detection device | |||||||
02/21/2025 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current and passing annual Dispenser Liner Integrity test | |||||||
02/21/2025 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Piping sumps shall be tested by October 13, 2018, and every three years thereafter, not to exceed 36 months; | |||||||
02/21/2025 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Provide current and passing annual Overfill Protection Test for overfill protection device. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/06/1994 | COMPLETED | 31 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
09/16/1988 | COMPLETED | 76 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||