![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/11/2025 Last Data Refresh: 05/10/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Marine/Coastal Fuel Storage | ||||||||
County | Manatee | Status | OPEN | ||||||||
ID | 8942830 | Latitude | 27° 29' 47.9747 | ||||||||
Name |
SAFE HARBOR PIER 77 12312 MANATEE AVE W |
Longitude | 82° 41' 10.7626 | ||||||||
BRADENTON, FL 34209-3027 | LL Method | DPHO | |||||||||
Contact | DONNA CARRIE | LL Status | REVIEWED | ||||||||
Phone | (941) 761-4200 | Status Date | 10/16/2003 | ||||||||
Account Owner Information | |||||||||||
Name | SAFE HARBOR 12312 Manatee Ave. West Bradenton, FL 34209 |
Effective Date | 06/24/2019 | ||||||||
Contact | DONNA CARRIE | ||||||||||
Phone | (941) 761-4200 | ||||||||||
DCARRIE@SHMARINAS.COM | |||||||||||
Placard # / Date | 678759 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | Sun Communities LLC/Safe Harbor 14785 Preston Rd Dallas, TX 75254-6878 |
Effective Date | 12/09/2022 | ||||||||
Contact | Donna Cartright | ||||||||||
Phone | (850) 227-6962 | ||||||||||
dcartright@shmarinas.com | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Vehicular Diesel (D) | 04/01/2018 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 550 | Misc Petrol-Based Product (X) | 01/01/1989 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(X) Concrete | (A) Abv, no soil contact (B) Steel/galvanized metal |
(I) Not required | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 10/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal | (N) Groundwater monitoring | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Unleaded Gas (B) | 10/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 6000 | Unleaded Gas (B) | 10/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill |
(B) Steel/galvanized metal | (N) Groundwater monitoring | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 08/21/2024 | 08/21/2027 | GREAT AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/21/2021 | 08/21/2024 | GREAT AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/21/2018 | 08/21/2021 | GREAT AMERICAN | ||||||||
INSURANCE | 04/30/2018 | 04/30/2019 | BERKLEY INSURANCE COMPANY | ||||||||
SURETY BOND | 04/25/2005 | 04/25/2006 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TXIF | 04/13/2006 | 04/18/2006 | IN-COMPLIANCE | REEDER_J | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 12/15/2005 | 12/15/2005 | REEDER_J | 0/3 | COMPLIANCE ASSURANCE | ||||||
TIN | 12/14/2005 | 12/15/2005 | MINOR OUT-OF-COMPLIANCE | REEDER_J | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING REPLACEMENT - ONE LINE FROM MANIFOLDED TANKS TO NEW DISPENSER. | |||||||||||
TXI | 12/14/2005 | 12/15/2005 | MINOR OUT-OF-COMPLIANCE | REEDER_J | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING REPLACEMENT - ONE LINE FROM MANIFOLDED TANKS TO NEW DISPENSER. | |||||||||||
RRBD | 06/30/2005 | 06/30/2005 | COMPLIANCE ASSURANCE | ||||||||
TCR | 06/23/2005 | 06/24/2005 | IN-COMPLIANCE | MARK TRETHEWEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 04/11/2005 | 04/15/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | MARK TRETHEWEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 11/02/2004 | 11/02/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | MARK TRETHEWEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/25/2003 | 10/06/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SEGO | 0/3 | COMPLIANCE ASSURANCE | |||||
PDNE | 08/01/2003 | 08/06/2003 | FIELDS_M | 0/4 | DISCHARGE PROJECT | ||||||
Completion Notes SNC B VIOLATIONS RESOLVED WITHIN 90 DAYS | |||||||||||
NCLI | 05/05/2003 | 05/21/2003 | COMPLIANCE ASSURANCE | ||||||||
TCI | 04/21/2003 | 05/08/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SEGO | 0/4 | COMPLIANCE ASSURANCE | |||||
TDI | 12/27/2002 | 01/09/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | SEGO | 0/3 | DISCHARGE PROJECT | |||||
NCLI | 10/08/2001 | 10/08/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 09/26/2001 | 10/08/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | FIELDS | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 10/16/2000 | 10/25/2000 | MINOR OUT-OF-COMPLIANCE | FIELDS | 0/0 | COMPLIANCE ASSURANCE | |||||
LTR | 10/16/2000 | 10/25/2000 | FIELDS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/16/1999 | 12/09/1999 | IN-COMPLIANCE | BROWNING | 0/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/11/1999 | 03/29/1999 | IN-COMPLIANCE | BROWNING | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 05/06/2025 | Accepted | SHANBERG_VJ_1 | Enforcement | |||||||
Record Document | 03/25/2025 | Satisfied | SHANBERG_VJ_1 | Compliance Assistance | |||||||
Site Inspection | 12/27/2024 | Minor Out of Compliance | SHANBERG_VJ_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 12/27/2024 | Satisfied | SHANBERG_VJ_1 | Routine Compliance | |||||||
Letter | 12/27/2024 | Satisfied | SHANBERG_VJ_1 | Compliance Assistance | |||||||
Issue Document | 03/29/2024 | Satisfied | REIS_A | Enforcement | |||||||
Enforcement Tracking | 03/29/2024 | Closed Without Enforcement | PEDIGO_L | Enforcement | |||||||
Letter | 02/10/2023 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Record Document | 02/10/2023 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Site Inspection | 12/15/2022 | Major Out of Compliance | TRETHEWEY_MB_1 | 0/1 | Routine Compliance | ||||||
Issue Document | 12/15/2022 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Letter | 12/15/2022 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Enforcement Referral | 06/01/2021 | Accepted | TRETHEWEY_MB_1 | Enforcement | |||||||
Record Document | 05/11/2021 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Record Document | 01/26/2021 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Record Document | 01/26/2021 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Record Document | 01/26/2021 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Site Inspection | 12/18/2020 | Major Out of Compliance | TRETHEWEY_MB_1 | 0/1 | Routine Compliance | ||||||
Letter | 12/18/2020 | Satisfied | TRETHEWEY_MB_1 | Compliance Assistance | |||||||
Issue Document | 12/18/2020 | Satisfied | TRETHEWEY_MB_1 | Routine Compliance | |||||||
Issue Document | 11/21/2018 | Satisfied | TRETHEWEY_MB_1 | Installation | |||||||
Site Inspection | 11/21/2018 | In Compliance | TRETHEWEY_MB_1 | 0/1 | Installation | ||||||
Document Management | 05/19/2010 | Satisfied | REEDER_JH_1 | Discharge | |||||||
Site Inspection | 06/05/2006 | In Compliance | REEDER_JH_1 | 0/3 | Discharge | ||||||
TCAR | 06/05/2006 | Satisfied | REEDER_JH_1 | Closure | |||||||
Record Document | 06/02/2006 | Satisfied | REEDER_JH_1 | Closure | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/27/2024 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Conduct and record overfill device operability testing and send documentation to Manatee County NRD for review. | |||||||
12/27/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Conduct and record integrity testing of your double-walled spill buckets, STP sumps, transition sump, and dispenser liner and send documentation to Manatee County NRD for review. | |||||||
12/27/2024 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Conduct and record release detection and line leak detection operability testing and send documentation to Manatee County NRD for review. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/14/2006 | COMPLETED | 8 | |||||||||
12/23/2002 | COMPLETED | 8 | |||||||||
06/10/1994 | COMPLETED | 8 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||