DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 01/22/2025        Last Data Refresh: 01/21/2025        Report Generated from DOPPLER
 
District Northwest   Type    Retail Station
 
County Escambia   Status    OPEN
 
ID 8943034   Latitude    30° 27' 21.5496
 
Name CIRCLE K #2704961
4501 N W ST
Longitude    87° 15' 1.0476
  PENSACOLA, FL 32505 LL Method    DGPS
 
Contact FRAN FRANCONI   LL Status    REVIEWED
 
Phone (813) 910-6884   Status Date    10/15/2003
 
Account Owner Information
 
Name CIRCLE K STORES INC
25 W CEDAR ST STE M
Pensacola, FL 32502
Effective Date    01/13/2010
 
Contact IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON
 
Phone (850) 454-1070
 
Email ILEWIS@CIRCLEK.COM
  Placard # / Date    697411 - 06/28/2024
Property Owner Information
 
Name CIRCLE K STORES INC
25 W CEDAR ST STE M
Pensacola, FL 32502
Effective Date    01/13/2010
 
Contact IRA LEWIS/ SCOTT JANASHAK / DEBORAH BRATTON
 
Phone (850) 454-1070
 
Email ILEWIS@CIRCLEK.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
5 16000 Unleaded Gas (B) 03/01/2005 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(M) Spill containment bucket
(O) Tight fill
(R) Double wall - tank jacket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
6 16000 Vehicular Diesel (D) 03/01/2005 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(A) Ball check valve
(C) Steel
(L) Compartmented
(M) Spill containment bucket
(O) Tight fill
(R) Double wall - tank jacket
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(F) Monitor dbl wall tank space
(H) Mechanical line leak detector
(K) Monitor dbl wall pipe space
 
 
Tank Tank Size Content Installed Placement Status
1 6000 Unleaded Gas (B) 11/01/1986 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(G) Electronic line leak detector
(T) Annual tightness test/Inventory
 
 
Tank Tank Size Content Installed Placement Status
2 6000 Vehicular Diesel (D) 11/01/1986 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(G) Electronic line leak detector
(T) Annual tightness test/Inventory
 
 
Tank Tank Size Content Installed Placement Status
3 10000 Unleaded Gas (B) 11/01/1986 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(G) Electronic line leak detector
(T) Annual tightness test/Inventory
 
 
Tank Tank Size Content Installed Placement Status
4 10000 Unleaded Gas (B) 11/01/1986 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(H) Impressed current CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (B) Steel/galvanized metal
(E) Cathodic protection
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(G) Electronic line leak detector
(T) Annual tightness test/Inventory
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
GUARANTEE   04/28/2024 08/26/2025
GUARANTEE   04/30/2023 08/28/2024
GUARANTEE   04/25/2021 08/27/2022
INSURANCE   12/01/2019 12/01/2020 NAVIGATORS SPECIALTY INSURANCE CO
INSURANCE   12/01/2018 12/01/2019 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2017 12/01/2018 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2016 12/01/2017 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2013 12/01/2016 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/01/2013 12/01/2014 IRONSHORE SPECIALTY INSURANCE CO
INSURANCE   12/17/2009 12/01/2011 CHUBB
INSURANCE   12/17/2008 12/17/2009 AMERICAN INTERNATIONAL SPECIALTY LINES
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 12/12/2005 12/16/2005 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes NO VIOLATIONS NOTED DURING THIS INSPECTION
 
TIN 04/06/2005 04/11/2005 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes INSPECTION FOR INSTALLATION OF TWO NEW DOUBLE WALLED NEWBERRY TANKS AND NEW DOUBLE WALLED PIPING.
 
TXI 03/09/2005 03/28/2005 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes INSPECTION FOR REMOVAL OF 4 UST'S FROM SITE IN PREPARATION OR INSTALLATION OF 2 NEW DOUBLEWALL TANKS.
 
TCI 10/27/2004 10/29/2004 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/4 COMPLIANCE ASSURANCE
 
TCI 02/04/2004 02/09/2004 IN-COMPLIANCE ARTHUR B. TISSINGTON 0/4 COMPLIANCE ASSURANCE
 
TIN 04/09/2003 04/24/2003 IN-COMPLIANCE JOHN B. HOLLINGSHEAD 0/4 COMPLIANCE ASSURANCE
 
 Completion Notes INSTALLATION OF 3 MPD CARD READERS, 1 DISPENSER WITH CARD READER.
 
TCI 02/05/2003 02/25/2003 IN-COMPLIANCE JOHN S. STEVENSON 0/4 COMPLIANCE ASSURANCE
 
IRFR 05/15/2002 09/13/2002 JOHN S. STEVENSON 0/2 DISCHARGE PROJECT
 
 Completion Notes A TRUCK HIT THE DISPENSER BREAKING THE SHEAR VALVE HEADS ON #1/2. APPROXIMATELY 2-5 GALLONS OF PRODUCT WAS RELEASED ON THE DRIVEWAY.
 
IRFR 04/15/2002 06/27/2002 JOHN S. STEVENSON 0/0 DISCHARGE PROJECT
 
 Completion Notes TRUCK HIT DISPENSER
 
TCI 01/10/2002 01/25/2002 IN-COMPLIANCE JOHN S. STEVENSON 0/4 COMPLIANCE ASSURANCE
 
TCI 01/25/2001 02/13/2001 IN-COMPLIANCE STEVENSON_JS 0/4 COMPLIANCE ASSURANCE
 
TCI 03/17/2000 03/23/2000 IN-COMPLIANCE STEVENSON_JS 0/4 COMPLIANCE ASSURANCE
 
RRBD 02/04/1999 03/29/1999 STEVENSON_J 0/0 COMPLIANCE ASSURANCE
 
TCI 01/15/1999 03/29/1999 MINOR OUT-OF-COMPLIANCE STEVENSON_J 0/4 COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Electronic Communication 08/05/2024 Satisfied MERRITT_S Enforcement
 
Enforcement Referral 05/15/2024 Accepted ELLIOTT_EV_1 Enforcement
 
Electronic Communication 04/05/2024 Satisfied ELLIOTT_EV_1 Compliance Assistance
 
Electronic Communication 02/26/2024 Satisfied ELLIOTT_EV_1 Routine Compliance
 
Letter 02/21/2024 Satisfied ELLIOTT_EV_1 Compliance Assistance
 
Site Inspection 02/21/2024 Major Out of Compliance ELLIOTT_EV_1 0/2 Routine Compliance
 
Letter 10/27/2023 Satisfied ELLIOTT_EV_1 Complaint
 
Site Inspection 10/26/2023 In Compliance ELLIOTT_EV_1 0/2 Complaint
 
Issue Document 03/24/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 03/24/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Record Document 03/08/2022 Satisfied GARTIN_D Routine Compliance
 
Issue Document 02/01/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Letter 02/01/2022 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 01/31/2022 Major Out of Compliance GARTIN_D 0/2 Routine Compliance
 
Electronic Communication 01/31/2022 Satisfied GARTIN_D Routine Compliance
 
Letter 12/11/2019 Satisfied WILSON_ML_1 Routine Compliance
 
Issue Document 12/11/2019 Satisfied WILSON_ML_1 Routine Compliance
 
Site Inspection 12/09/2019 In Compliance BRAGG_SD_2 0/2 Routine Compliance
 
Issue Document 08/17/2017 Satisfied WILSON_ML_1 Compliance Assistance
 
Issue Document 08/17/2017 Satisfied WILSON_ML_1 Routine Compliance
 
Site Inspection 08/17/2017 In Compliance BRAGG_SD_2 0/2 Routine Compliance
 
Electronic Communication 08/16/2017 Satisfied BRAGG_SD_2 Routine Compliance
 
Site Inspection 12/17/2015 In Compliance PAYNE_CL_1 0/2 Routine Compliance
 
Emergency Preparedness Information 12/09/2015 Satisfied PAYNE_CL_1 Routine Compliance
 
Site Inspection 02/17/2014 In Compliance PAYNE_CL_1 0/2 Routine Compliance
 
Emergency Preparedness Information 02/13/2014 Satisfied PAYNE_CL_1 Routine Compliance
 
Site Inspection 09/09/2011 In Compliance TISSINGTON_AB_1 0/2 Routine Compliance
 
Emergency Preparedness Information 09/09/2011 Satisfied TISSINGTON_AB_1 Routine Compliance
 
Meeting 07/11/2011 Satisfied GILLMAN_M Non-Compliance
 
Site Inspection 11/05/2010 In Compliance PORTER_AJ_1 0/2 Non-Compliance
 
Letter 10/18/2010 Satisfied PIERCE_LL_1 Non-Compliance
 
Emergency Preparedness Information 09/23/2010 Satisfied PORTER_AJ_1 Routine Compliance
 
Site Inspection 09/23/2010 Minor Out of Compliance PORTER_AJ_1 0/2 Routine Compliance
 
Phone Conversation 12/10/2009 Satisfied PORTER_AJ_1 Routine Compliance
 
Letter 10/01/2009 Satisfied PORTER_AJ_1 Non-Compliance
 
Site Inspection 09/29/2009 Major Out of Compliance PORTER_AJ_1 0/2 Routine Compliance
 
Emergency Preparedness Information 09/29/2009 Satisfied STEVENSON_JS Routine Compliance
 
Site Inspection 03/19/2009 In Compliance STEVENSON_JS 0/2 Routine Compliance
 
Emergency Preparedness Information 03/18/2009 Satisfied STEVENSON_JS Routine Compliance
 
Record Document 05/30/2008 Satisfied STEVENSON_JS Non-Compliance
 
Record Document 02/22/2008 Satisfied STEVENSON_JS Non-Compliance
 
Letter 12/14/2007 Satisfied STEVENSON_JS Non-Compliance
 
Site Inspection 12/11/2007 Major Out of Compliance STEVENSON_JS 0/2 Routine Compliance
 
Emergency Preparedness Information 02/07/2007 Satisfied STEVENSON_JS Routine Compliance
 
Site Inspection 11/08/2006 In Compliance TISSINGTON_AB_1 0/2 Routine Compliance
 
Emergency Preparedness Information 09/21/2006 Satisfied THAYER_JD_1 Routine Compliance
 
 
 
No Open AOCs Found
 
 
No Open Violations Found
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
04/09/2003   COMPLETED
 
08/30/1989   COMPLETED 60 PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE