![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/23/2025 Last Data Refresh: 02/22/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Local Government | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8943332 | Latitude | 25° 48' 39.5657 | ||||||||
Name |
M-DCPS MIAMI JACKSON SR HS 1751 NW 36TH ST |
Longitude | 80° 13' 37.1247 | ||||||||
MIAMI, FL 33142-5439 | LL Method | DPHO | |||||||||
Contact | MR. MICHAEL KRTAUSCH | LL Status | REVIEWED | ||||||||
Phone | (305) 995-4451 | Status Date | 08/22/2020 | ||||||||
Account Owner Information | |||||||||||
Name | MIAMI-DADE CNTY PUBLIC SCHOOLS 12525 NW 28TH AVE Miami, FL 33167-2507 |
Effective Date | 05/20/1994 | ||||||||
Contact | CARLOS J GONZALEZ / PAUL J EVERET 305-572-3935 | ||||||||||
Phone | (305) 995-4067 | ||||||||||
CAGONZALEZ@DADESCHOOLS.NET | |||||||||||
Placard # / Date | 699156 - 07/09/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MIAMI-DADE CNTY PUBLIC SCHOOLS 12525 NW 28TH AVE Miami, FL 33167-2507 |
Effective Date | 02/26/2010 | ||||||||
Contact | CARLOS J GONZALEZ / PAUL J EVERET 305-572-3935 | ||||||||||
Phone | (305) 995-4067 | ||||||||||
CAGONZALEZ@DADESCHOOLS.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 4100 | Emerg Generator Diesel (G) | 02/01/2010 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(F) Monitor dbl wall tank space (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 2000 | Emerg Generator Diesel (G) | 10/01/2006 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (N) Flow shut-Off (R) Double wall - tank jacket |
(B) Steel/galvanized metal (M) Double wall - pipe jacket |
(G) Electronic line leak detector (N) Groundwater monitoring (R) Monitor tank bottom space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (B) Steel/galvanized metal | (D) SPCC Plan | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 1000 | Fuel Oil - Onsite Heat (M) | UNDERGROUND | Closed In Place (A) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (B) Steel/galvanized metal | (D) SPCC Plan | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 07/01/2024 | 06/30/2025 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 06/18/2021 | 06/18/2022 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 06/18/2020 | 06/18/2021 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 06/01/2019 | 06/01/2020 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2018 | 03/15/2019 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2017 | 03/15/2018 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2016 | 03/15/2017 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2015 | 03/15/2016 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2013 | 03/15/2014 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2012 | 03/15/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2011 | 03/15/2012 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2010 | 03/15/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/01/2008 | 03/01/2009 | |||||||||
No Legacy Data Found | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 01/24/2025 | Major Out of Compliance | RODRIGUEZ_F | 2/0 | Routine Compliance | ||||||
Letter | 01/24/2025 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Electronic Communication | 01/08/2025 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Enforcement Tracking | 07/20/2021 | Closed Without Enforcement | CHIRINO_AM_1 | Enforcement | |||||||
Letter | 07/19/2021 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Electronic Communication | 07/19/2021 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Site Inspection | 07/19/2021 | In Compliance | SANPEDRO_A_2 | 2/0 | Compliance Assistance | ||||||
Electronic Communication | 06/03/2021 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Electronic Communication | 05/15/2021 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Letter | 12/02/2020 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Site Inspection | 11/29/2020 | Major Out of Compliance | SANPEDRO_A_2 | 2/0 | Compliance Assistance | ||||||
Site Inspection | 08/19/2020 | Major Out of Compliance | SANPEDRO_A_2 | 2/0 | Routine Compliance | ||||||
Letter | 08/19/2020 | Satisfied | SANPEDRO_A_2 | Compliance Assistance | |||||||
Electronic Communication | 07/29/2020 | Satisfied | SANPEDRO_A_2 | Routine Compliance | |||||||
Enforcement Referral | 04/26/2018 | Accepted | CHIRINO_AM_1 | Enforcement | |||||||
Electronic Communication | 04/12/2018 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Phone Conversation | 04/12/2018 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Site Inspection | 04/12/2018 | Major Out of Compliance | CRUZ_I_2 | 2/0 | Compliance Assistance | ||||||
Site Inspection | 12/20/2017 | Major Out of Compliance | CRUZ_I_2 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 12/20/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Letter | 12/20/2017 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Electronic Communication | 11/28/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Phone Conversation | 11/28/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Electronic Communication | 11/02/2015 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Site Inspection | 10/21/2015 | In Compliance | CABRERA_VE_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 10/02/2015 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Electronic Communication | 12/11/2013 | Satisfied | RUNTE_C_3 | Routine Compliance | |||||||
Site Inspection | 12/06/2013 | In Compliance | RUNTE_C_3 | 2/0 | Routine Compliance | ||||||
Incident | 10/01/2012 | Has not led to Discharge | FERNANDEZBANGO_CE_1 | Incident | |||||||
Letter | 10/01/2012 | Satisfied | FERNANDEZBANGO_CE_1 | Non-Compliance | |||||||
Site Inspection | 08/31/2012 | Minor Out of Compliance | FERNANDEZBANGO_CE_1 | 2/0 | Routine Compliance | ||||||
Electronic Communication | 06/25/2012 | Satisfied | FERNANDEZBANGO_CE_1 | Non-Compliance | |||||||
Document Management | 05/04/2011 | Complete | FERNANDEZBANGO_CE_1 | Incident | |||||||
Site Inspection | 05/04/2011 | Minor Out of Compliance | FERNANDEZBANGO_CE_1 | 2/0 | Routine Compliance | ||||||
Letter | 05/04/2011 | Satisfied | FERNANDEZBANGO_CE_1 | Non-Compliance | |||||||
Letter | 06/25/2010 | Satisfied | REYES_D_1 | Non-Compliance | |||||||
Site Inspection | 06/18/2010 | Minor Out of Compliance | REYES_D_1 | 1/0 | Installation | ||||||
Site Inspection | 06/18/2010 | Minor Out of Compliance | REYES_D_1 | 2/0 | Routine Compliance | ||||||
Letter | 06/19/2008 | Satisfied | RODRIGUEZ_Y_1 | Non-Compliance | |||||||
Site Inspection | 06/19/2008 | Minor Out of Compliance | RODRIGUEZ_Y_1 | 0/2 | Non-Compliance | ||||||
Site Inspection | 12/21/2007 | Major Out of Compliance | RODRIGUEZ_Y_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 03/21/2007 | In Compliance | RODRIGUEZ_Y_1 | 0/2 | Installation | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/24/2025 | 7090 | Minor | 3.15 Spill containment, dispenser liners and piping sumps not accessible; water and regulated substances not removed. | Remove and properly dispose of the liquid observed in the piping sump located adjacent to the 2000-gallon aboveground storage tank. | |||||||
01/24/2025 | 7065 | SNC-B | 1.6 Storage tank system not visually inspected once a month. | Provide current monthly visual Inspection logs for the tank systems. | |||||||
01/24/2025 | 7089 | Minor | 1.11 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Provide current and passing Integrity test for the transition sump. | |||||||
01/24/2025 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Provide a current and passing annual operability tests for Overfill Protection devices of the 2,000-gallon and 4,100-gallon ASTs. | |||||||
01/24/2025 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Provide a current and passing annual operability tests for release detection devices of the 2,000-gallon and 4,100-gallon ASTs. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/28/1997 | COMPLETED | 9 | |||||||||
11/01/1988 | COMPLETED | ||||||||||