DEP Logo Florida Department of
Environmental Protection


Bob Martinez Center
2600 Blair Stone Road
Tallahassee, Florida 32399-2400
Storage Tanks &
Contamination
Monitoring Information
 
Cover Page Report
Report Run Date: 02/02/2025        Last Data Refresh: 02/01/2025        Report Generated from DOPPLER
 
District Northeast   Type    Retail Station
 
County Taylor   Status    OPEN
 
ID 8943430   Latitude    30° 8' 36.0755
 
Name JRS AUCILLA RIVER STORE
23485 US 98
Longitude    83° 58' .815
  LAMONT, FL 32336 LL Method    DPHO
 
Contact JOEL ISAAC BALDREE   LL Status    REVIEWED
 
Phone (850) 584-4595   Status Date    04/04/2003
 
Account Owner Information
 
Name JRS AUCILLA RIVER STORE INC
23485 US HWY 98
LAMONT, FL 32336
Effective Date    08/23/2020
 
Contact JOEL ISAAC BALDREE
 
Phone (850) 584-4595
 
Email JOELBALDREE@HOTMAIL.COM
  Placard # / Date    698820 - 07/03/2024
Property Owner Information
 
Name JRS AUCILLA RIVER STORE INC
23485 US HWY 98
LAMONT, FL 32336
Effective Date    08/23/2020
 
Contact JOEL ISAAC BALDREE
 
Phone (850) 584-4595
 
Email JOELBALDREE@HOTMAIL.COM
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
3 15000 Vehicular Diesel (D) 04/01/2004 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(5) Electronic monitor dispenser liners
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
4 5000 Unleaded Gas (B) 10/01/2010 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(I) Double wall
(M) Spill containment bucket
(O) Tight fill
(P) Level gauges/alarms
  (C) Fiberglass
(F) Double wall
(J) Pressurized piping system
(K) Dispenser liners
(1) Continuous electronic sensing
(5) Electronic monitor dispenser liners
(F) Monitor dbl wall tank space
(K) Monitor dbl wall pipe space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
5 2000 Vehicular Diesel (D) 09/01/2011 ABOVEGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (A) Abv, no soil contact
(B) Steel/galvanized metal
(J) Pressurized piping system
(F) Monitor dbl wall tank space
(Q) Visual inspection of ASTs
 
 
Tank Tank Size Content Installed Placement Status
1 6000 Unleaded Gas (B) 12/01/1988 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
2 6000 Unleaded Gas (B) 12/01/1988 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
(O) Tight fill
  (C) Fiberglass
(J) Pressurized piping system
(K) Dispenser liners
(2) Visual inspect pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   01/13/2022 01/13/2023 COMMERCE AND INDUSTRY INSURANCE COMPANY
INSURANCE   01/13/2021 01/13/2022 COMMERCE AND INDUSTRY INSURANCE COMPANY
INSURANCE   01/13/2020 01/13/2021 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   01/13/2019 01/13/2020 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   01/13/2018 01/13/2019 COMMERCE & INDUSTRY INSURANCE CO
INSURANCE   01/13/2017 01/13/2018 COMMERCE & INDUSTRY
INSURANCE   01/13/2015 01/13/2016 COMMERCE & INDUSTRY
INSURANCE   01/13/2012 01/13/2013 COMMERCE & INDUSTRY
INSURANCE   01/13/2010 01/13/2011 ZURICH-AMERICAN
INSURANCE   01/13/2009 01/13/2010 ZURICH-AMERICAN
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCI 01/26/2006 01/27/2006 IN-COMPLIANCE PAUL HUTCHERSON 1/2 COMPLIANCE ASSURANCE
 
RRBD 07/28/2005 07/26/2005 COMPLIANCE ASSURANCE
 
TCR 06/09/2005 06/14/2005 MINOR OUT-OF-COMPLIANCE LUBINSKI 1/2 COMPLIANCE ASSURANCE
 
 Completion Notes VERIFIED DIESEL AST RELEASE DETETION NOW FUNCTIONING. HOWEVER, OWNER DID NOT SHOW, AND NO RECORDS PRESENTED FOR ATG & LEAK DETECTOR OPERABILITY TESTS, PIPING TIGHTNESS TEST.
 
TCI 11/30/2004 12/18/2004 MINOR OUT-OF-COMPLIANCE GARRY ALLSHOUSE 1/2 COMPLIANCE ASSURANCE
 
 Completion Notes TCI VIOLATION 2110
 
RRBD 11/10/2004 12/18/2004 GARRY ALLSHOUSE 1/2 COMPLIANCE ASSURANCE
 
 Completion Notes RRBD
 
NCLI 11/06/2004 12/18/2004 GARRY ALLSHOUSE 1/2 COMPLIANCE ASSURANCE
 
 Completion Notes NCLI
 
TIN 06/10/2004 10/10/2004 IN-COMPLIANCE GARRY ALLSHOUSE 1/2 COMPLIANCE ASSURANCE
 
 Completion Notes TIN- INSTALLATION OF NEW DISPENSERS AND DISPENSER LINERS
 
TXI 06/02/2004 10/10/2004 IN-COMPLIANCE GARRY ALLSHOUSE 1/2 COMPLIANCE ASSURANCE
 
 Completion Notes TXI- REMOVAL OF OLD DISPENSER LINERS AND DISPENSERS
 
RRBD 05/21/2004 10/10/2004 GARRY ALLSHOUSE 1/2 COMPLIANCE ASSURANCE
 
 Completion Notes RRBD-NOTIFICATION OF UPGRADE FOR DISPENSERS AND LINERS FOR GASOLINE ONLY
 
TCR 04/26/2004 06/15/2004 IN-COMPLIANCE GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes TCR- UPGRADE REMAINS INCOMLPETE
 
RRBD 03/19/2004 04/13/2004 GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes RRBD- HAS CONTRACT WITH J&J TO UPGRADE SYSTEM TO INCLUDE AN AST FOR DIESEL 15K CAPACITY & CONVERT DIESEL UNDERGROUND TO PREMIUM
 
WLI 03/09/2004 04/06/2004 GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes WLI
 
RRBD 01/19/2004 04/06/2004 GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes RRBD 60 DAY COMPLIANCE PERIOD
 
NCLI 01/09/2004 04/06/2004 GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes NCLI
 
TCR 12/30/2003 04/06/2004 SIGNIFICANT OUT-OF-COMPLIANCE GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes TCR CONDUCTED WITH NEW VIOLATIONS
 
RRBD 11/12/2003 11/13/2003 GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes RRBD- TANK TEST TO BE COMPLETED NEXT WEEK ACCORDING TO JOY CLEMONS
 
TCQA 10/28/2003 11/07/2003 MINOR OUT-OF-COMPLIANCE LUBINSKI_D 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes QA INSPECTION DONE.
 
WLI 10/24/2003 10/24/2003 GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes WLI
 
RRBD 09/26/2003 09/29/2003 GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes RRBD-TEST ORDERED FOR COMPLIANCE
 
TCI 08/26/2003 10/06/2003 SIGNIFICANT OUT-OF-COMPLIANCE GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
NCLI 08/26/2003 09/18/2003 GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes NCLI 08/26/2003
 
TCR 12/05/2002 01/27/2003 IN-COMPLIANCE GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
CWOE 12/05/2002 03/25/2003 GARRY ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes ITEM CORRECTED
 
TCI 10/09/2002 11/12/2002 MINOR OUT-OF-COMPLIANCE ALLSHOUSE 0/2 COMPLIANCE ASSURANCE
 
TCI 09/18/2001 09/26/2001 MINOR OUT-OF-COMPLIANCE MEISSNER_R 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes LINE LEAK DETECTORS LEAKING & LINE TT NEEDED
 
TCR 03/19/2001 04/03/2001 IN-COMPLIANCE MEISSNER_R 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes CLEARED VIOLATION FOR NO LEAK DETECTION
 
TCI 02/16/2001 03/12/2001 SIGNIFICANT OUT-OF-COMPLIANCE MEISSNER_R 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes ATG OR OTHER LEAK DET NEEDED
 
RRBD 07/30/2000 09/18/2000 MEISSNER_R 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes CLEARED VIOLATIONS
 
TCR 06/14/2000 06/23/2000 IN-COMPLIANCE MEISSNER_R 0/2 COMPLIANCE ASSURANCE
 
 Completion Notes CLEARED ALL VIOLATIONS EXCEPT TANK & LINE TT
 
TCI 03/21/2000 03/27/2000 SIGNIFICANT OUT-OF-COMPLIANCE MEISSNER_R /2 COMPLIANCE ASSURANCE
 
 Completion Notes 8 VIOLATIONS - ALL TESTING & PROTECT SWING JOINT
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Letter 09/18/2024 Satisfied MCNEIL_A Enforcement
 
Enforcement Referral 08/07/2024 Accepted ZIMMERMAN_RA_2 Enforcement
 
Site Inspection 01/04/2023 Minor Out of Compliance ZIMMERMAN_RA_2 3/0 Routine Compliance
 
Electronic Communication 01/04/2023 Satisfied ZIMMERMAN_RA_2 Compliance Assistance
 
Letter 01/04/2023 Satisfied ZIMMERMAN_RA_2 Compliance Assistance
 
Phone Conversation 12/02/2022 Satisfied ZIMMERMAN_RA_2 Compliance Assistance
 
Electronic Communication 10/14/2022 Satisfied ZIMMERMAN_RA_2 Compliance Assistance
 
Record Document 03/31/2020 Satisfied ZIMMERMAN_RA_2 Compliance Assistance
 
Letter 01/16/2020 Satisfied ZIMMERMAN_RA_2 Compliance Assistance
 
Electronic Communication 01/16/2020 Satisfied ZIMMERMAN_RA_2 Compliance Assistance
 
Site Inspection 01/16/2020 Minor Out of Compliance ZIMMERMAN_RA_2 3/0 Routine Compliance
 
Phone Conversation 12/30/2019 Satisfied ZIMMERMAN_RA_2 Compliance Assistance
 
Record Document 10/03/2017 Satisfied RAMSEY_TH_1 Compliance Assistance
 
Letter 06/02/2017 Satisfied GRAHAM_DL_1 Non-Compliance
 
Site Inspection 06/02/2017 Major Out of Compliance GRAHAM_DL_1 3/0 Routine Compliance
 
Site Inspection 03/29/2015 In Compliance GRAHAM_DL_1 3/0 Routine Compliance
 
Site Inspection 10/29/2012 In Compliance GRAHAM_DL_1 3/0 Routine Compliance
 
Record Document 12/07/2011 Satisfied GRAHAM_DL_1 Non-Compliance
 
Letter 10/28/2011 Satisfied GRAHAM_DL_1 Non-Compliance
 
Site Inspection 10/27/2011 In Compliance GRAHAM_DL_1 2/0 Installation
 
Phone Conversation 06/24/2011 Satisfied GRAHAM_DL_1 Installation
 
Record Document 02/16/2011 Satisfied GRAHAM_DL_1 Routine Compliance
 
Issue Document 12/23/2010 Satisfied GRAHAM_DL_1 Non-Compliance
 
Record Document 12/21/2010 Satisfied GRAHAM_DL_1 Non-Compliance
 
Record Document 12/09/2010 Satisfied GRAHAM_DL_1 Non-Compliance
 
Issue Document 12/09/2010 Satisfied GRAHAM_DL_1 Non-Compliance
 
Letter 11/19/2010 Satisfied GRAHAM_DL_1 Non-Compliance
 
Site Inspection 11/19/2010 Major Out of Compliance GRAHAM_DL_1 2/0 Installation
 
Letter 08/05/2010 Satisfied GRAHAM_DL_1 Non-Compliance
 
Site Inspection 08/05/2010 Minor Out of Compliance GRAHAM_DL_1 1/0 Routine Compliance
 
Letter 04/29/2010 Satisfied GRAHAM_DL_1 Closure
 
Record Document 04/29/2010 Satisfied GRAHAM_DL_1 Closure
 
TCAR 04/28/2010 Satisfied GRAHAM_DL_1 Closure
 
Record Document 02/04/2010 Satisfied GRAHAM_DL_1 Closure
 
Site Inspection 01/13/2010 In Compliance GRAHAM_DL_1 0/2 Closure
 
Meeting 01/07/2010 Satisfied GRAHAM_DL_1 Non-Compliance
 
Discharge Reporting 11/10/2009 Satisfied DOHANEY_T Discharge
 
Discharge Reporting 11/10/2009 Satisfied DOHANEY_T Discharge
 
Site Inspection 10/20/2009 In Compliance GRAHAM_DL_1 1/2 Non-Compliance
 
Record Document 10/15/2009 Satisfied GRAHAM_DL_1 Routine Compliance
 
Record Document 10/15/2009 Satisfied GRAHAM_DL_1 Non-Compliance
 
Phone Conversation 07/13/2009 Satisfied GRAHAM_DL_1 Routine Compliance
 
Letter 06/09/2009 Satisfied GRAHAM_DL_1 Non-Compliance
 
Letter 04/20/2009 Satisfied GRAHAM_DL_1 Non-Compliance
 
Site Inspection 04/20/2009 Minor Out of Compliance GRAHAM_DL_1 1/2 Routine Compliance
 
Emergency Preparedness Information 04/20/2009 Satisfied GRAHAM_DL_1 Routine Compliance
 
Phone Conversation 04/13/2009 Satisfied GRAHAM_DL_1 Routine Compliance
 
Site Inspection 03/05/2009 In Compliance TOWLE_M 1/2 Non-Compliance
 
Enforcement Referral Activity - OLD 02/29/2008 Closed With Enforcement DOHANEY_T Enforcement
 
Emergency Preparedness Information 01/17/2008 Satisfied HUTCHERSON_P Routine Compliance
 
Site Inspection 01/17/2008 In Compliance HUTCHERSON_P 1/2 Routine Compliance
 
Record Document 01/08/2008 Satisfied LUBINSKI_D Discharge
 
Issue Document 01/08/2008 Satisfied LUBINSKI_D Discharge
 
Issue Document 09/28/2007 Satisfied LUBINSKI_D Discharge
 
Enforcement Referral 07/25/2007 Rejected DOHANEY_T Enforcement
 
Issue Document 07/10/2007 Satisfied LUBINSKI_D Discharge
 
Emergency Preparedness Information 05/23/2007 Satisfied HUTCHERSON_P Routine Compliance
 
Record Document 03/19/2007 Satisfied LUBINSKI_D Discharge
 
Meeting 03/19/2007 Satisfied LUBINSKI_D Discharge
 
Emergency Preparedness Information 02/14/2007 Satisfied HUTCHERSON_P Routine Compliance
 
Site Inspection 12/12/2006 In Compliance HUTCHERSON_P 1/2 Routine Compliance
 
Issue Document 12/04/2006 Satisfied DOHANEY_T Discharge
 
Phone Conversation 11/22/2006 Satisfied HUTCHERSON_P Routine Compliance
 
Record Document 11/20/2006 Satisfied DOHANEY_T Discharge
 
Record Document 11/20/2006 Satisfied DOHANEY_T Discharge
 
Issue Document 11/09/2006 Satisfied DOHANEY_T Discharge
 
Issue Document 10/04/2006 Satisfied DOHANEY_T Discharge
 
Emergency Preparedness Information 09/27/2006 Satisfied HUTCHERSON_P Routine Compliance
 
Proof of Contamination 09/27/2006 Created Discharge LUBINSKI_D Discharge
 
Proof of Contamination 09/27/2006 Satisfied DOHANEY_T Discharge
 
Issue Document 09/27/2006 Satisfied DOHANEY_T Discharge
 
Record Document 09/27/2006 Satisfied DOHANEY_T Enforcement
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
01/04/2023 7072 Minor 1.8 Annual operability testing of release detection systems not completed. Have release detection systems for Tank 3 and Tank 4 operability tested and certified; email passing test certification to DEP-NED.
 
01/04/2023 7072 Minor 1.8 Annual operability testing of release detection systems not completed. Have all line leak detectors operability tested and certified; email passing test certification to DEP-NED.
 
01/16/2020 4057 Minor 4.31 Overfill protection devices not registered or tested annually. Have the AST systems primary overfill protection devices operability tested and certified; email passing test certification to ACEPD.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
05/17/2005   COMPLETED
 
07/23/2004   COMPLETED 45