Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Taylor | Status | OPEN | ||||||||
ID | 8943430 | Latitude | 30° 8' 36.0755 | ||||||||
Name |
JRS AUCILLA RIVER STORE 23485 US 98 |
Longitude | 83° 58' .815 | ||||||||
LAMONT, FL 32336 | LL Method | DPHO | |||||||||
Contact | JOEL ISAAC BALDREE | LL Status | REVIEWED | ||||||||
Phone | (850) 584-4595 | Status Date | 04/04/2003 | ||||||||
Account Owner Information | |||||||||||
Name | JRS AUCILLA RIVER STORE INC 23485 US HWY 98 LAMONT, FL 32336 |
Effective Date | 08/23/2020 | ||||||||
Contact | JOEL ISAAC BALDREE | ||||||||||
Phone | (850) 584-4595 | ||||||||||
JOELBALDREE@HOTMAIL.COM | |||||||||||
Placard # / Date | 698820 - 07/03/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | JRS AUCILLA RIVER STORE INC 23485 US HWY 98 LAMONT, FL 32336 |
Effective Date | 08/23/2020 | ||||||||
Contact | JOEL ISAAC BALDREE | ||||||||||
Phone | (850) 584-4595 | ||||||||||
JOELBALDREE@HOTMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 15000 | Vehicular Diesel (D) | 04/01/2004 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 5000 | Unleaded Gas (B) | 10/01/2010 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 2000 | Vehicular Diesel (D) | 09/01/2011 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (P) Level gauges/alarms (R) Double wall - tank jacket |
(A) Abv, no soil contact (B) Steel/galvanized metal (J) Pressurized piping system |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/13/2022 | 01/13/2023 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 01/13/2021 | 01/13/2022 | COMMERCE AND INDUSTRY INSURANCE COMPANY | ||||||||
INSURANCE | 01/13/2020 | 01/13/2021 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/13/2019 | 01/13/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/13/2018 | 01/13/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 01/13/2017 | 01/13/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/13/2015 | 01/13/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/13/2012 | 01/13/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 01/13/2010 | 01/13/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 01/13/2009 | 01/13/2010 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 01/26/2006 | 01/27/2006 | IN-COMPLIANCE | PAUL HUTCHERSON | 1/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/28/2005 | 07/26/2005 | COMPLIANCE ASSURANCE | ||||||||
TCR | 06/09/2005 | 06/14/2005 | MINOR OUT-OF-COMPLIANCE | LUBINSKI | 1/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes VERIFIED DIESEL AST RELEASE DETETION NOW FUNCTIONING. HOWEVER, OWNER DID NOT SHOW, AND NO RECORDS PRESENTED FOR ATG & LEAK DETECTOR OPERABILITY TESTS, PIPING TIGHTNESS TEST. | |||||||||||
TCI | 11/30/2004 | 12/18/2004 | MINOR OUT-OF-COMPLIANCE | GARRY ALLSHOUSE | 1/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes TCI VIOLATION 2110 | |||||||||||
RRBD | 11/10/2004 | 12/18/2004 | GARRY ALLSHOUSE | 1/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RRBD | |||||||||||
NCLI | 11/06/2004 | 12/18/2004 | GARRY ALLSHOUSE | 1/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCLI | |||||||||||
TIN | 06/10/2004 | 10/10/2004 | IN-COMPLIANCE | GARRY ALLSHOUSE | 1/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes TIN- INSTALLATION OF NEW DISPENSERS AND DISPENSER LINERS | |||||||||||
TXI | 06/02/2004 | 10/10/2004 | IN-COMPLIANCE | GARRY ALLSHOUSE | 1/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes TXI- REMOVAL OF OLD DISPENSER LINERS AND DISPENSERS | |||||||||||
RRBD | 05/21/2004 | 10/10/2004 | GARRY ALLSHOUSE | 1/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RRBD-NOTIFICATION OF UPGRADE FOR DISPENSERS AND LINERS FOR GASOLINE ONLY | |||||||||||
TCR | 04/26/2004 | 06/15/2004 | IN-COMPLIANCE | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes TCR- UPGRADE REMAINS INCOMLPETE | |||||||||||
RRBD | 03/19/2004 | 04/13/2004 | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RRBD- HAS CONTRACT WITH J&J TO UPGRADE SYSTEM TO INCLUDE AN AST FOR DIESEL 15K CAPACITY & CONVERT DIESEL UNDERGROUND TO PREMIUM | |||||||||||
WLI | 03/09/2004 | 04/06/2004 | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes WLI | |||||||||||
RRBD | 01/19/2004 | 04/06/2004 | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RRBD 60 DAY COMPLIANCE PERIOD | |||||||||||
NCLI | 01/09/2004 | 04/06/2004 | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCLI | |||||||||||
TCR | 12/30/2003 | 04/06/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes TCR CONDUCTED WITH NEW VIOLATIONS | |||||||||||
RRBD | 11/12/2003 | 11/13/2003 | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RRBD- TANK TEST TO BE COMPLETED NEXT WEEK ACCORDING TO JOY CLEMONS | |||||||||||
TCQA | 10/28/2003 | 11/07/2003 | MINOR OUT-OF-COMPLIANCE | LUBINSKI_D | 0/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes QA INSPECTION DONE. | |||||||||||
WLI | 10/24/2003 | 10/24/2003 | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes WLI | |||||||||||
RRBD | 09/26/2003 | 09/29/2003 | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RRBD-TEST ORDERED FOR COMPLIANCE | |||||||||||
TCI | 08/26/2003 | 10/06/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | |||||
NCLI | 08/26/2003 | 09/18/2003 | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NCLI 08/26/2003 | |||||||||||
TCR | 12/05/2002 | 01/27/2003 | IN-COMPLIANCE | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | |||||
CWOE | 12/05/2002 | 03/25/2003 | GARRY ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ITEM CORRECTED | |||||||||||
TCI | 10/09/2002 | 11/12/2002 | MINOR OUT-OF-COMPLIANCE | ALLSHOUSE | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 09/18/2001 | 09/26/2001 | MINOR OUT-OF-COMPLIANCE | MEISSNER_R | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes LINE LEAK DETECTORS LEAKING & LINE TT NEEDED | |||||||||||
TCR | 03/19/2001 | 04/03/2001 | IN-COMPLIANCE | MEISSNER_R | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLEARED VIOLATION FOR NO LEAK DETECTION | |||||||||||
TCI | 02/16/2001 | 03/12/2001 | SIGNIFICANT OUT-OF-COMPLIANCE | MEISSNER_R | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes ATG OR OTHER LEAK DET NEEDED | |||||||||||
RRBD | 07/30/2000 | 09/18/2000 | MEISSNER_R | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CLEARED VIOLATIONS | |||||||||||
TCR | 06/14/2000 | 06/23/2000 | IN-COMPLIANCE | MEISSNER_R | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLEARED ALL VIOLATIONS EXCEPT TANK & LINE TT | |||||||||||
TCI | 03/21/2000 | 03/27/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | MEISSNER_R | /2 | COMPLIANCE ASSURANCE | |||||
Completion Notes 8 VIOLATIONS - ALL TESTING & PROTECT SWING JOINT | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 09/18/2024 | Satisfied | MCNEIL_A | Enforcement | |||||||
Enforcement Referral | 08/07/2024 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Site Inspection | 01/04/2023 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 3/0 | Routine Compliance | ||||||
Electronic Communication | 01/04/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 01/04/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Phone Conversation | 12/02/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 10/14/2022 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 03/31/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 01/16/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 01/16/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 01/16/2020 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 3/0 | Routine Compliance | ||||||
Phone Conversation | 12/30/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 10/03/2017 | Satisfied | RAMSEY_TH_1 | Compliance Assistance | |||||||
Letter | 06/02/2017 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 06/02/2017 | Major Out of Compliance | GRAHAM_DL_1 | 3/0 | Routine Compliance | ||||||
Site Inspection | 03/29/2015 | In Compliance | GRAHAM_DL_1 | 3/0 | Routine Compliance | ||||||
Site Inspection | 10/29/2012 | In Compliance | GRAHAM_DL_1 | 3/0 | Routine Compliance | ||||||
Record Document | 12/07/2011 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 10/28/2011 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 10/27/2011 | In Compliance | GRAHAM_DL_1 | 2/0 | Installation | ||||||
Phone Conversation | 06/24/2011 | Satisfied | GRAHAM_DL_1 | Installation | |||||||
Record Document | 02/16/2011 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Issue Document | 12/23/2010 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Record Document | 12/21/2010 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Record Document | 12/09/2010 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Issue Document | 12/09/2010 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 11/19/2010 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 11/19/2010 | Major Out of Compliance | GRAHAM_DL_1 | 2/0 | Installation | ||||||
Letter | 08/05/2010 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 08/05/2010 | Minor Out of Compliance | GRAHAM_DL_1 | 1/0 | Routine Compliance | ||||||
Letter | 04/29/2010 | Satisfied | GRAHAM_DL_1 | Closure | |||||||
Record Document | 04/29/2010 | Satisfied | GRAHAM_DL_1 | Closure | |||||||
TCAR | 04/28/2010 | Satisfied | GRAHAM_DL_1 | Closure | |||||||
Record Document | 02/04/2010 | Satisfied | GRAHAM_DL_1 | Closure | |||||||
Site Inspection | 01/13/2010 | In Compliance | GRAHAM_DL_1 | 0/2 | Closure | ||||||
Meeting | 01/07/2010 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Discharge Reporting | 11/10/2009 | Satisfied | DOHANEY_T | Discharge | |||||||
Discharge Reporting | 11/10/2009 | Satisfied | DOHANEY_T | Discharge | |||||||
Site Inspection | 10/20/2009 | In Compliance | GRAHAM_DL_1 | 1/2 | Non-Compliance | ||||||
Record Document | 10/15/2009 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Record Document | 10/15/2009 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Phone Conversation | 07/13/2009 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Letter | 06/09/2009 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 04/20/2009 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 04/20/2009 | Minor Out of Compliance | GRAHAM_DL_1 | 1/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 04/20/2009 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Phone Conversation | 04/13/2009 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 03/05/2009 | In Compliance | TOWLE_M | 1/2 | Non-Compliance | ||||||
Enforcement Referral Activity - OLD | 02/29/2008 | Closed With Enforcement | DOHANEY_T | Enforcement | |||||||
Emergency Preparedness Information | 01/17/2008 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Site Inspection | 01/17/2008 | In Compliance | HUTCHERSON_P | 1/2 | Routine Compliance | ||||||
Record Document | 01/08/2008 | Satisfied | LUBINSKI_D | Discharge | |||||||
Issue Document | 01/08/2008 | Satisfied | LUBINSKI_D | Discharge | |||||||
Issue Document | 09/28/2007 | Satisfied | LUBINSKI_D | Discharge | |||||||
Enforcement Referral | 07/25/2007 | Rejected | DOHANEY_T | Enforcement | |||||||
Issue Document | 07/10/2007 | Satisfied | LUBINSKI_D | Discharge | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Record Document | 03/19/2007 | Satisfied | LUBINSKI_D | Discharge | |||||||
Meeting | 03/19/2007 | Satisfied | LUBINSKI_D | Discharge | |||||||
Emergency Preparedness Information | 02/14/2007 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Site Inspection | 12/12/2006 | In Compliance | HUTCHERSON_P | 1/2 | Routine Compliance | ||||||
Issue Document | 12/04/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Phone Conversation | 11/22/2006 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Record Document | 11/20/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Record Document | 11/20/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Issue Document | 11/09/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Issue Document | 10/04/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Emergency Preparedness Information | 09/27/2006 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Proof of Contamination | 09/27/2006 | Created Discharge | LUBINSKI_D | Discharge | |||||||
Proof of Contamination | 09/27/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Issue Document | 09/27/2006 | Satisfied | DOHANEY_T | Discharge | |||||||
Record Document | 09/27/2006 | Satisfied | DOHANEY_T | Enforcement | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
01/04/2023 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Have release detection systems for Tank 3 and Tank 4 operability tested and certified; email passing test certification to DEP-NED. | |||||||
01/04/2023 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Have all line leak detectors operability tested and certified; email passing test certification to DEP-NED. | |||||||
01/16/2020 | 4057 | Minor | 4.31 Overfill protection devices not registered or tested annually. | Have the AST systems primary overfill protection devices operability tested and certified; email passing test certification to ACEPD. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
05/17/2005 | COMPLETED | ||||||||||
07/23/2004 | COMPLETED | 45 | |||||||||