![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/23/2025 Last Data Refresh: 02/22/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Retail Station | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8943600 | Latitude | 25° 53' 45.9001 | ||||||||
Name |
SUNSHINE #611 4200 NW 135TH ST |
Longitude | 80° 16' 4.6819 | ||||||||
OPA LOCKA, FL 33054-4416 | LL Method | DPHO | |||||||||
Contact | MAXIMO ALVAREZ | LL Status | REVIEWED | ||||||||
Phone | (305) 477-5800 | Status Date | 02/20/2024 | ||||||||
Account Owner Information | |||||||||||
Name | SUNSHINE GASOLINE DISTRIBUTORS INC 1650 NW 87TH AVE DORAL, FL 33172-2614 |
Effective Date | 05/18/2009 | ||||||||
Contact | MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ | ||||||||||
Phone | (786) 606-0917 | ||||||||||
MZAMORA@SUNSHINEGASOLINE.COM | |||||||||||
Placard # / Date | 694618 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | SUNSHINE GASOLINE DISTRIBUTORS INC 1650 NW 87TH AVE DORAL, FL 33172-2614 |
Effective Date | 05/18/2009 | ||||||||
Contact | MARIO ZAMORA / VANESSA PALACIOS/BARBIE RUIZ | ||||||||||
Phone | (786) 606-0917 | ||||||||||
MZAMORA@SUNSHINEGASOLINE.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
S-435 | 12000 | Ethanol E10 (8) | 01/01/2015 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
S-436 | 12000 | Ethanol E10 (8) | 01/01/2015 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Unleaded Gas (B) | 12/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (M) Spill containment bucket |
(B) Steel/galvanized metal (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(B) Site Suitabilitiy Plan exemption (H) Mechanical line leak detector (N) Groundwater monitoring |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
NONE | |||||||||||
INSURANCE | 09/25/2024 | 09/25/2025 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2022 | 09/25/2023 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2021 | 09/25/2022 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2019 | 09/25/2020 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2018 | 09/25/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2017 | 09/25/2018 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2016 | 09/25/2017 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 09/25/2014 | 09/25/2015 | LIBERTY SURPLUS INSURANCE CORP | ||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 07/14/2010 | 07/14/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 12/08/2008 | 12/08/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 06/27/2005 | 06/29/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 03/23/2005 | 03/30/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 04/05/2004 | 04/12/2004 | IN-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 02/12/2004 | 02/13/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 10/15/2003 | 10/20/2003 | IN-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/23/2003 | 01/31/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 12/10/2001 | 12/26/2001 | IN-COMPLIANCE | DASHTAKI_K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 10/17/2000 | 10/25/2000 | IN-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 09/27/2000 | 10/05/2000 | MINOR OUT-OF-COMPLIANCE | DASHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 12/28/1999 | 03/29/2000 | IN-COMPLIANCE | DAHTAKI, K | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 03/11/1999 | 04/30/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | RONDON, K | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/11/1999 | 06/17/1999 | RONDON, K | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/02/1999 | 04/19/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | RONDON, K | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 02/14/2025 | Major Out of Compliance | RODRIGUEZ_F | 0/2 | Routine Compliance | ||||||
Letter | 02/14/2025 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Electronic Communication | 02/13/2025 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Incident | 06/30/2023 | Has not led to Discharge | RODRIGUEZ_F | Incident | |||||||
Document Management | 06/30/2023 | Satisfied | RODRIGUEZ_F | Incident | |||||||
Letter | 06/30/2023 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Site Inspection | 06/30/2023 | In Compliance | RODRIGUEZ_F | 0/2 | Compliance Assistance | ||||||
Letter | 02/28/2022 | Satisfied | RODRIGUEZ_F | Compliance Assistance | |||||||
Site Inspection | 02/23/2022 | Major Out of Compliance | RODRIGUEZ_F | 0/2 | Routine Compliance | ||||||
Electronic Communication | 02/16/2022 | Satisfied | RODRIGUEZ_F | Routine Compliance | |||||||
Electronic Communication | 01/07/2020 | Satisfied | DASHTAKI_K_1 | Compliance Assistance | |||||||
Letter | 01/07/2020 | Satisfied | DASHTAKI_K_1 | Compliance Assistance | |||||||
Letter | 01/03/2020 | Satisfied | CANOSALOM_JF_2 | Compliance Assistance | |||||||
Site Inspection | 12/30/2019 | Minor Out of Compliance | CANOSALOM_JF_2 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 12/04/2019 | Satisfied | CANOSALOM_JF_2 | Routine Compliance | |||||||
Document Management | 06/14/2019 | Satisfied | CHIRINO_AM_1 | Enforcement | |||||||
Enforcement Tracking | 06/14/2019 | Closed Without Enforcement | CHIRINO_AM_1 | Enforcement | |||||||
Electronic Communication | 05/16/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Electronic Communication | 05/16/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Phone Conversation | 05/16/2017 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 04/19/2017 | In Compliance | DEZAYAS_A_1 | 0/2 | Routine Compliance | ||||||
TCAR | 08/12/2016 | Satisfied | MAS_JR_1 | Closure | |||||||
TCAR | 11/04/2015 | Incomplete | MAS_JR_1 | Closure | |||||||
Letter | 11/04/2015 | Satisfied | MAS_JR_1 | Closure | |||||||
Site Inspection | 05/21/2015 | In Compliance | DEZAYAS_A_1 | 0/2 | Routine Compliance | ||||||
Phone Conversation | 05/14/2015 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 05/14/2015 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Enforcement Referral | 05/11/2015 | Accepted | CHIRINO_AM_1 | Enforcement | |||||||
Site Inspection | 04/01/2015 | In Compliance | DEZAYAS_A_1 | 0/4 | Installation | ||||||
Site Inspection | 01/26/2015 | Major Out of Compliance | DEZAYAS_A_1 | 0/4 | Closure | ||||||
Site Inspection | 01/26/2015 | In Compliance | DEZAYAS_A_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 01/26/2015 | In Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
Enforcement Tracking | 01/26/2015 | Closed With Enforcement | CHIRINO_AM_1 | Enforcement | |||||||
Electronic Communication | 11/19/2014 | Satisfied | DEZAYAS_A_1 | Routine Compliance | |||||||
Site Inspection | 09/25/2012 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Letter | 09/25/2012 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 09/25/2012 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Site Inspection | 07/29/2011 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/29/2011 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Document Management | 07/15/2010 | Complete | CHIRINO_AM_1 | Enforcement | |||||||
Enforcement Referral | 07/15/2010 | Accepted | CHIRINO_AM_1 | Enforcement | |||||||
Site Inspection | 07/14/2010 | In Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Enforcement Tracking | 10/14/2009 | Closed Without Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 10/14/2009 | In Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 04/08/2009 | In Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
Enforcement Referral | 01/12/2009 | Accepted | DASHTAKI_K_1 | Enforcement | |||||||
Issue Document | 01/12/2009 | Satisfied | DASHTAKI_K_1 | Enforcement | |||||||
Letter | 01/12/2009 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 01/12/2009 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 03/19/2008 | In Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 02/12/2008 | Minor Out of Compliance | DASHTAKI_K_1 | 0/4 | Non-Compliance | ||||||
Letter | 02/05/2008 | Satisfied | DASHTAKI_K_1 | Non-Compliance | |||||||
Site Inspection | 02/05/2008 | Major Out of Compliance | DASHTAKI_K_1 | 0/4 | Routine Compliance | ||||||
Letter | 09/07/2007 | Satisfied | SHER_RC_1 | Non-Compliance | |||||||
Site Inspection | 06/06/2007 | Major Out of Compliance | SHER_RC_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/25/2006 | Satisfied | DASHTAKI_K_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/14/2025 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair/replace the hose of dispenser #6. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
04/18/2016 | COMPLETED | ||||||||||