![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Taylor | Status | OPEN | ||||||||
ID | 8943659 | Latitude | 30° 5' 51.8164 | ||||||||
Name |
SPEED STOP- FARZANA 23 INC 2269 HWY 27 E |
Longitude | 83° 32' 59.2339 | ||||||||
PERRY, FL 32347-9554 | LL Method | DPHO | |||||||||
Contact | Rabeya Rahim | LL Status | REVIEWED | ||||||||
Phone | (850) 584-8885 | Status Date | 04/04/2003 | ||||||||
Account Owner Information | |||||||||||
Name | FARZANA 23 INC 2269 HWY 27 E PERRY, FL 32347 |
Effective Date | 11/07/2023 | ||||||||
Contact | RABEYA RAHIM | ||||||||||
Phone | (352) 356-1882 | ||||||||||
RABEYA.RAHIM@YAHOO.COM | |||||||||||
Placard # / Date | 703236 - 10/29/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | FARZANA 23 INC 2269 HWY 27 E PERRY, FL 32347 |
Effective Date | 11/07/2023 | ||||||||
Contact | RABEYA RAHIM | ||||||||||
Phone | (352) 356-1882 | ||||||||||
RABEYA.RAHIM@YAHOO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
215200 | 15000 | Unleaded Gas (B) | 02/01/2009 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Unleaded Gas (B) | 02/01/1989 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 02/01/1989 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Unleaded Gas (B) | 02/01/1989 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/09/2023 | 10/09/2024 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2021 | 04/01/2022 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 04/01/2020 | 04/01/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 06/22/2019 | 06/22/2020 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 06/22/2018 | 06/22/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 06/22/2017 | 06/22/2018 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 06/22/2016 | 06/22/2017 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 06/19/2015 | 06/19/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/18/2014 | 06/18/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/18/2013 | 06/18/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 06/18/2012 | 06/18/2013 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/18/2011 | 06/18/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/18/2010 | 06/18/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 06/18/2009 | 06/18/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 08/01/2008 | 08/01/2009 | ZURICH-AMERICAN | ||||||||
INSURANCE | 08/01/1999 | 08/01/2004 | UNITED CAPITOL | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 12/05/2005 | 12/30/2005 | IN-COMPLIANCE | PAUL HUTCHERSON | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 09/30/2004 | 10/10/2004 | IN-COMPLIANCE | GARRY ALLSHOUSE | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes TCI | |||||||||||
TCI | 10/27/2003 | 11/07/2003 | IN-COMPLIANCE | GARRY ALLSHOUSE | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes TCI | |||||||||||
CWOE | 02/03/2003 | 02/13/2003 | GARRY ALLSHOUSE | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCR | 02/03/2003 | 02/13/2003 | IN-COMPLIANCE | GARRY ALLSHOUSE | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 01/24/2003 | 01/27/2003 | GARRY ALLSHOUSE | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/06/2002 | 01/27/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | GARRY ALLSHOUSE | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 01/25/2002 | 03/15/2002 | GARRY ALLSHOUSE | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SHEAR VALVES AND SMALL LEAK | |||||||||||
TCR | 01/08/2002 | 03/15/2002 | IN-COMPLIANCE | GARRY ALLSHOUSE | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes COMPLIED | |||||||||||
CWOE | 01/08/2002 | 03/15/2002 | GARRY ALLSHOUSE | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes COMPLIED | |||||||||||
TCI | 12/13/2001 | 03/15/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | GARRY ALLSHOUSE | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes 76, 144 | |||||||||||
RRBD | 05/07/2001 | 05/25/2001 | MEISSNER_R | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CLEARED VIOLATION | |||||||||||
TCI | 03/20/2001 | 04/17/2001 | MINOR OUT-OF-COMPLIANCE | MEISSNER_R | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes LINE LEAK DETECTOR TEST NEEDED | |||||||||||
TCR | 02/28/2000 | 03/06/2000 | IN-COMPLIANCE | MEISSNER_R | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes CLEARED ALL VIOLATIONS | |||||||||||
TCI | 12/28/1999 | 01/05/2000 | MINOR OUT-OF-COMPLIANCE | MEISSNER_R | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes MONITORING WELLS AND LEAK TESTING IN JANUARY | |||||||||||
TCI | 03/31/1999 | 04/12/1999 | IN-COMPLIANCE | MEISSNER_R | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes INVENTORY ON SIRS. MONITORING WELLS NEED TO BE CLOSED | |||||||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 08/08/2024 | Satisfied | STERLING_C | Enforcement | |||||||
Enforcement Referral | 01/31/2024 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Electronic Communication | 01/23/2024 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 01/12/2024 | Satisfied | ZIMMERMAN_RA_2 | Component Installation | |||||||
Electronic Communication | 10/27/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 10/27/2023 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Letter | 10/27/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Phone Conversation | 10/09/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Phone Conversation | 10/09/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Phone Conversation | 08/29/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 01/27/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 01/27/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 01/27/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 01/26/2023 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 09/27/2021 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 09/27/2021 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 09/09/2021 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 07/22/2020 | Satisfied | COLLINS_MR | Enforcement | |||||||
Enforcement Tracking | 07/22/2020 | Closed Without Enforcement | COLLINS_MR | Enforcement | |||||||
Electronic Communication | 06/08/2020 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Enforcement Referral | 06/08/2020 | Accepted | ZIMMERMAN_RA_2 | Enforcement | |||||||
Record Document | 09/05/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 08/12/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Electronic Communication | 08/12/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 08/12/2019 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 07/25/2019 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 12/26/2017 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Record Document | 12/26/2017 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 12/26/2017 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Phone Conversation | 12/18/2017 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Letter | 11/17/2017 | Satisfied | ZIMMERMAN_RA_2 | Compliance Assistance | |||||||
Site Inspection | 11/17/2017 | Minor Out of Compliance | ZIMMERMAN_RA_2 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 11/15/2017 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Phone Conversation | 11/13/2017 | Satisfied | ZIMMERMAN_RA_2 | Routine Compliance | |||||||
Site Inspection | 10/08/2015 | In Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Phone Conversation | 09/18/2015 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Issue Document | 05/14/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 05/14/2015 | In Compliance | GRAHAM_DL_1 | 0/1 | Non-Compliance | ||||||
Phone Conversation | 04/30/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Phone Conversation | 04/30/2015 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Letter | 12/09/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Meeting | 12/09/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 03/28/2014 | Minor Out of Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Letter | 03/28/2014 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Issue Document | 01/30/2013 | Satisfied | LUBINSKI_D | Non-Compliance | |||||||
Phone Conversation | 01/03/2013 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 12/19/2012 | Major Out of Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Letter | 12/19/2012 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 12/19/2012 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 06/24/2011 | In Compliance | LUBINSKI_D | 0/1 | QA/QC | ||||||
Site Inspection | 03/11/2011 | In Compliance | GRAHAM_DL_1 | 0/1 | Non-Compliance | ||||||
Letter | 02/03/2011 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 02/03/2011 | Minor Out of Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/03/2011 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 11/13/2009 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Letter | 11/13/2009 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Site Inspection | 11/13/2009 | Minor Out of Compliance | GRAHAM_DL_1 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/16/2009 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Meeting | 06/24/2009 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Letter | 06/19/2009 | Satisfied | GRAHAM_DL_1 | Closure | |||||||
TCAR | 06/19/2009 | Satisfied | GRAHAM_DL_1 | Closure | |||||||
Site Inspection | 06/18/2009 | In Compliance | GRAHAM_DL_1 | 0/1 | Installation | ||||||
Record Document | 03/23/2009 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 03/23/2009 | In Compliance | GRAHAM_DL_1 | 0/3 | Closure | ||||||
Letter | 12/30/2008 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Meeting | 12/30/2008 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Record Document | 12/30/2008 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 11/21/2008 | Major Out of Compliance | GRAHAM_DL_1 | 0/3 | Routine Compliance | ||||||
Letter | 11/21/2008 | Satisfied | GRAHAM_DL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 11/21/2008 | Satisfied | GRAHAM_DL_1 | Routine Compliance | |||||||
Site Inspection | 10/01/2007 | In Compliance | HUTCHERSON_P | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/18/2007 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Letter | 10/25/2006 | Satisfied | HUTCHERSON_P | Non-Compliance | |||||||
Site Inspection | 10/02/2006 | Major Out of Compliance | HUTCHERSON_P | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/19/2006 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
Phone Conversation | 09/11/2006 | Satisfied | HUTCHERSON_P | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
10/27/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Remove liquid from Premium STP sump; email proof of violation resolution – work order/invoice and picture after liquid removal to ACEPD. | |||||||
10/27/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have all of the spill buckets containment integrity evaluation tested and certified; email passing test certification to ACEPD. | |||||||
10/27/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have all of the under dispenser containments and STP sumps containment integrity evaluation tested and certified; email passing test certification to ACEPD. | |||||||
10/27/2023 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | Have all of the overfill protection device ball check valves operability tested and certified; email passing test certification to ACEPD. | |||||||
10/27/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have all of the line leak detectors operability tested and certified; email passing test certification to ACEPD. | |||||||
10/27/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | Have the electronic release detection system operability tested and certified; email passing test certification to ACEPD. | |||||||
No Discharges Found |