![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 04/19/2025 Last Data Refresh: 04/18/2025 Report Generated from DOPPLER | |||||||||||
District | Southeast | Type | Local Government | ||||||||
County | Miami-Dade | Status | OPEN | ||||||||
ID | 8943734 | Latitude | 25° 56' 23.2617 | ||||||||
Name |
M-DCPS AMERICAN SENIOR HS 18350 NW 67TH AVE |
Longitude | 80° 18' 34.5092 | ||||||||
MIAMI, FL 33015-3403 | LL Method | DPHO | |||||||||
Contact | MR. MICHAEL KRTAUSCH | LL Status | REVIEWED | ||||||||
Phone | (305) 995-4451 | Status Date | 04/07/2025 | ||||||||
Account Owner Information | |||||||||||
Name | MIAMI-DADE CNTY PUBLIC SCHOOLS 12525 NW 28TH AVE Miami, FL 33167-2507 |
Effective Date | 05/20/1994 | ||||||||
Contact | CARLOS J GONZALEZ / PAUL J EVERET 305-572-3935 | ||||||||||
Phone | (305) 995-4067 | ||||||||||
CAGONZALEZ@DADESCHOOLS.NET | |||||||||||
Placard # / Date | 699168 - 07/09/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | MIAMI-DADE CNTY PUBLIC SCHOOLS 12525 NW 28TH AVE Miami, FL 33167-2507 |
Effective Date | 08/07/2013 | ||||||||
Contact | CARLOS J GONZALEZ / PAUL J EVERET 305-572-3935 | ||||||||||
Phone | (305) 995-4067 | ||||||||||
CAGONZALEZ@DADESCHOOLS.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Emerg Generator Diesel (G) | 01/01/1994 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (I) Double wall (M) Spill containment bucket (P) Level gauges/alarms |
(A) Abv, no soil contact (B) Steel/galvanized metal |
(F) Monitor dbl wall tank space (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Emerg Generator Diesel (G) | 07/01/1976 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 07/01/2024 | 06/30/2025 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 07/01/2023 | 06/30/2024 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 06/01/2020 | 06/01/2021 | |||||||||
LOCAL GOVERNMENTS - BOND RATING TEST | 03/15/2015 | 03/15/2016 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2014 | 03/15/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2013 | 03/15/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2012 | 03/15/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2011 | 03/15/2012 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/15/2010 | 03/15/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/13/2009 | 03/13/2010 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 03/13/2008 | 03/13/2009 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 04/24/2006 | 05/01/2006 | MINOR OUT-OF-COMPLIANCE | HARRIS, J | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 08/11/2005 | 08/23/2005 | IN-COMPLIANCE | CAJUSTE, P | 1/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/06/2005 | 01/07/2005 | HARRIS, J | 1/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 10/21/2004 | 10/25/2004 | MINOR OUT-OF-COMPLIANCE | HARRIS, J | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 10/06/2004 | 10/18/2004 | MINOR OUT-OF-COMPLIANCE | HARRIS, J | 1/0 | COMPLIANCE ASSURANCE | |||||
TCR | 11/20/2003 | 11/26/2003 | MINOR OUT-OF-COMPLIANCE | CAJUSTE, P | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/14/2003 | 07/21/2003 | MINOR OUT-OF-COMPLIANCE | CAJUSTE, P | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/22/2002 | 08/01/2002 | MINOR OUT-OF-COMPLIANCE | BUSTAMANTE, M | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/31/2001 | 08/03/2001 | IN-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/27/2000 | 08/04/2000 | IN-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 02/24/2000 | 03/07/2000 | IN-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
TCR | 07/20/1999 | 07/21/1999 | IN-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
TCI | 03/11/1999 | 05/05/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | KUHLE, S | 1/0 | COMPLIANCE ASSURANCE | |||||
ATCI | 07/22/1997 | 08/07/1997 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 04/10/2025 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Letter | 04/08/2025 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 04/07/2025 | Major Out of Compliance | JACQUET_F_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 04/02/2025 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Electronic Communication | 01/29/2024 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Enforcement Tracking | 01/29/2024 | Closed Without Enforcement | DASHTAKI_K_1 | Enforcement | |||||||
Site Inspection | 01/29/2024 | In Compliance | JACQUET_F_1 | 1/0 | Compliance Assistance | ||||||
Letter | 01/29/2024 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Electronic Communication | 10/07/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Letter | 09/30/2020 | Satisfied | JACQUET_F_1 | Compliance Assistance | |||||||
Site Inspection | 09/30/2020 | Minor Out of Compliance | JACQUET_F_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 08/28/2020 | Satisfied | JACQUET_F_1 | Routine Compliance | |||||||
Enforcement Referral | 04/26/2018 | Accepted | CHIRINO_AM_1 | Enforcement | |||||||
Phone Conversation | 04/12/2018 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Site Inspection | 04/12/2018 | Major Out of Compliance | CRUZ_I_2 | 1/0 | Compliance Assistance | ||||||
Electronic Communication | 04/12/2018 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Site Inspection | 12/20/2017 | Major Out of Compliance | CRUZ_I_2 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 12/20/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Letter | 12/20/2017 | Satisfied | CRUZ_I_2 | Compliance Assistance | |||||||
Electronic Communication | 12/06/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Electronic Communication | 12/06/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Phone Conversation | 11/28/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Electronic Communication | 11/28/2017 | Satisfied | CRUZ_I_2 | Routine Compliance | |||||||
Electronic Communication | 11/02/2015 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Site Inspection | 10/21/2015 | In Compliance | CABRERA_VE_1 | 1/0 | Routine Compliance | ||||||
Electronic Communication | 10/02/2015 | Satisfied | CABRERA_VE_1 | Routine Compliance | |||||||
Electronic Communication | 02/03/2015 | Satisfied | RUNTE_C_3 | Non-Compliance | |||||||
Site Inspection | 12/16/2014 | In Compliance | RUNTE_C_3 | 1/0 | Non-Compliance | ||||||
Electronic Communication | 12/11/2013 | Satisfied | RUNTE_C_3 | Routine Compliance | |||||||
Letter | 12/02/2013 | Satisfied | RUNTE_C_3 | Non-Compliance | |||||||
Site Inspection | 12/02/2013 | Minor Out of Compliance | RUNTE_C_3 | 1/0 | Routine Compliance | ||||||
Site Inspection | 05/16/2012 | In Compliance | PADRON_JE_1 | 1/0 | Non-Compliance | ||||||
Letter | 12/16/2011 | Satisfied | PADRON_JE_1 | Non-Compliance | |||||||
Site Inspection | 12/16/2011 | Minor Out of Compliance | PADRON_JE_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 09/17/2010 | In Compliance | DASHTAKI_K_1 | 1/0 | Non-Compliance | ||||||
Site Inspection | 08/11/2010 | Minor Out of Compliance | DASHTAKI_K_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 02/26/2010 | In Compliance | DASHTAKI_K_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 07/29/2008 | In Compliance | DASHTAKI_K_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 12/20/2007 | In Compliance | DASHTAKI_K_1 | 1/0 | Routine Compliance | ||||||
Site Inspection | 10/06/2006 | In Compliance | DASHTAKI_K_1 | 1/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
04/07/2025 | 7007 | Minor | 3.1 Incident Notification Form (INF) not received in a timely manner. | Submit an Incident Notification Form (INF) for the following incident: Krueger leak gauge float completely raised. | |||||||
04/07/2025 | 7058 | Minor | 3.2 Valves do not meet standards of Section 7 of PEI/RP200-13 for piping systems with gravity head. | Install isolation and anti-siphon valves on the supply line in the following order: tank -> isolation valve -> anti-siphon valve. | |||||||
04/07/2025 | 7075 | SNC-B | 3.1 Not repaired component or piping which has not caused a discharge or release. | Remove the corrosion from the spill containment bucket, and repaint the lid per API standards (yellow) once completed | |||||||
04/07/2025 | 6080 | SNC-B | 4.11 Storage tank system closure requirements not met that did not result in a discharge. | Properly abandon three (3) monitoring wells associated with the UST system removed in 1994. | |||||||
04/07/2025 | 7013 | Minor | 3.4 Incident investigation leading to discharge not completed within 14 days, or No DRF or written confirmation received after 14 day investigation period. | Submit an investigation report stating what caused the incident (Krueger leak gauge float completely raised) and if it led to a discharge. | |||||||
04/07/2025 | 7095 | Minor | 1.14 Records requiring 3 year documentation period not kept by facility. | Provide three (3) years of monthly visual inspection log records. | |||||||
04/07/2025 | 7075 | SNC-B | 3.1 Not repaired component or piping which has not caused a discharge or release. | Remove the vegetation running on and around the tank and the minor signs of rust. Once completed, repaint the tank. | |||||||
04/07/2025 | 7041 | Minor | 1.10 Failure to designate, register, or annually test primary overfill protection device, | Provide a current and passing test of the overfill protection device (Krueger fuel level gauge). | |||||||
04/07/2025 | 7075 | SNC-B | 3.1 Not repaired component or piping which has not caused a discharge or release. | Conduct repairs related to the incident (Krueger leak gauge float completely raised). | |||||||
04/07/2025 | 7072 | Minor | 1.8 Annual operability testing of release detection systems not completed. | Provide a current and passing test of the release detection device (Krueger leak gauge), after repairs have been completed. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
03/11/1994 | COMPLETED | ||||||||||
11/01/1988 | COMPLETED | ||||||||||