![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Southwest | Type | Retail Station | ||||||||
County | Pinellas | Status | OPEN | ||||||||
ID | 8944087 | Latitude | 27° 56' 32.1 | ||||||||
Name |
BP-NURSERY RD 18698 US HWY 19 N |
Longitude | 82° 43' 50.6628 | ||||||||
CLEARWATER, FL 33764-5118 | LL Method | DPHO | |||||||||
Contact | ABDI R BOOZAR JOMEHRI | LL Status | REVIEWED | ||||||||
Phone | (727) 596-3196 | Status Date | 05/30/2024 | ||||||||
Account Owner Information | |||||||||||
Name | BP OF PINELLAS LLC 200 9TH AVE N #200 SAFETY HARBOR, FL 34695 |
Effective Date | 07/28/2008 | ||||||||
Contact | ABDI R BOOZAR-JOMEHRI (MANAGING MEMBER) | ||||||||||
Phone | (727) 725-2550 | ||||||||||
PILOTCONSTRUCTIONTECH@GMAIL.COM | |||||||||||
Placard # / Date | 682026 - 06/05/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | BP OF PINELLAS LLC 200 9TH AVE N #200 SAFETY HARBOR, FL 34695 |
Effective Date | 07/28/2008 | ||||||||
Contact | ABDI R BOOZAR-JOMEHRI (MANAGING MEMBER) | ||||||||||
Phone | (727) 725-2550 | ||||||||||
PILOTCONSTRUCTIONTECH@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 08/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
10 | 6000 | Leaded Gas (A) | 01/01/1959 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
11 | 10000 | Unleaded Gas (B) | 07/01/1996 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
12 | 10000 | Unleaded Gas (B) | 07/01/1996 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Unleaded Gas (B) | 08/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 08/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(G) Sacrificial anode CP (M) Spill containment bucket (O) Tight fill |
(E) Cathodic protection (J) Pressurized piping system |
(8) Manually sampled wells (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 500 | Waste Oil (L) | 08/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(G) Sacrificial anode CP (M) Spill containment bucket |
(Y) Unknown | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 3000 | Unleaded Gas (B) | 05/01/1960 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 3000 | Unleaded Gas (B) | 05/01/1960 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 3000 | Unleaded Gas (B) | 05/01/1960 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 3000 | Unleaded Gas (B) | 05/01/1960 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 3000 | Unleaded Gas (B) | 11/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/31/2015 | 10/31/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/31/2014 | 10/31/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/31/2012 | 10/31/2013 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/31/2011 | 10/31/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/13/2010 | 10/13/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 10/31/2008 | 10/31/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
LTR | 12/28/2005 | 12/28/2005 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 12/28/2005 | 12/28/2005 | IN-COMPLIANCE | STRAUSS | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/12/2005 | 12/28/2005 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 11/10/2005 | 11/22/2005 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 11/08/2005 | 11/22/2005 | MINOR OUT-OF-COMPLIANCE | STRAUSS | 0/2 | COMPLIANCE ASSURANCE | |||||
LTR | 01/24/2005 | 01/24/2005 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCR | 01/24/2005 | 01/24/2005 | IN-COMPLIANCE | STRAUSS | 0/2 | COMPLIANCE ASSURANCE | |||||
NCLI | 12/23/2004 | 12/29/2004 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 12/16/2004 | 12/29/2004 | MINOR OUT-OF-COMPLIANCE | STRAUSS | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 12/11/2003 | 12/12/2003 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
NCLI | 10/21/2003 | 10/22/2003 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 10/20/2003 | 10/22/2003 | MINOR OUT-OF-COMPLIANCE | TAM | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes ENVIRON DW FLEX PIPING | |||||||||||
LTR | 01/28/2003 | 02/03/2003 | TAM | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 01/27/2003 | 02/03/2003 | IN-COMPLIANCE | TAM | 0/2 | COMPLIANCE ASSURANCE | |||||
Completion Notes DW ENVIRON FLEX - GREEN | |||||||||||
TCI | 10/23/2001 | 10/26/2001 | IN-COMPLIANCE | HALSCOTT | 0/2 | COMPLIANCE ASSURANCE | |||||
TCI | 04/19/2001 | 04/22/2001 | MINOR OUT-OF-COMPLIANCE | HALSCOTT | 0/2 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/24/2000 | 08/08/2000 | STRAUSS | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 05/02/2000 | 05/23/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | STRAUSS | 0/2 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 02/04/2025 | Accepted | MUSLIC_A_1 | Enforcement | |||||||
Enforcement Tracking | 01/16/2025 | Closed Without Enforcement | PEDIGO_L | Enforcement | |||||||
Document Management | 01/16/2025 | Satisfied | PEDIGO_L | Enforcement | |||||||
Site Inspection | 12/17/2024 | Major Out of Compliance | MUSLIC_A_1 | 0/2 | Routine Compliance | ||||||
Letter | 12/17/2024 | Satisfied | MUSLIC_A_1 | Compliance Assistance | |||||||
Enforcement Tracking | 04/26/2024 | Closed Without Enforcement | GREEN_SM | Enforcement | |||||||
Enforcement Referral | 09/27/2023 | Accepted | SHOCK_E_1 | Enforcement | |||||||
Site Inspection | 03/31/2023 | Major Out of Compliance | SHOCK_E_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 03/31/2023 | Satisfied | SHOCK_E_1 | Compliance Assistance | |||||||
Electronic Communication | 03/30/2023 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Electronic Communication | 03/20/2023 | Satisfied | SHOCK_E_1 | Routine Compliance | |||||||
Letter | 08/28/2020 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Site Inspection | 08/28/2020 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 04/24/2018 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Letter | 04/24/2018 | Satisfied | STRAUSS_RH_1 | Compliance Assistance | |||||||
Electronic Communication | 04/12/2018 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Electronic Communication | 06/26/2017 | Satisfied | KENNEDY_S | Enforcement | |||||||
Enforcement Referral | 07/12/2016 | Accepted | STRAUSS_RH_1 | Enforcement | |||||||
Letter | 05/17/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Electronic Communication | 03/08/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Electronic Communication | 02/04/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Electronic Communication | 02/04/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 02/04/2016 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Non-Compliance | ||||||
Letter | 02/04/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 01/08/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 01/07/2016 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Non-Compliance | ||||||
Electronic Communication | 01/07/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 01/07/2016 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Electronic Communication | 10/30/2015 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Letter | 10/30/2015 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Site Inspection | 10/30/2015 | Minor Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Electronic Communication | 10/22/2015 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 10/21/2013 | In Compliance | JUEDES_HC_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 05/14/2012 | In Compliance | LONGEN_JL_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 02/11/2011 | In Compliance | LONGEN_JL_1 | 0/2 | Routine Compliance | ||||||
Enforcement Tracking | 02/25/2010 | Closed With Enforcement | JARRETT_SE | Enforcement | |||||||
Record Document | 12/21/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 12/09/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 11/03/2009 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Record Document | 11/03/2009 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Record Document | 10/19/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 10/19/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Letter | 10/15/2009 | Satisfied | LONGEN_JL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 10/15/2009 | Satisfied | LONGEN_JL_1 | Routine Compliance | |||||||
Site Inspection | 10/15/2009 | Major Out of Compliance | LONGEN_JL_1 | 0/2 | Routine Compliance | ||||||
Record Document | 09/28/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 09/09/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 09/04/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Issue Document | 09/04/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 09/04/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 08/31/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 08/31/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 08/28/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Issue Document | 08/28/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 08/04/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 07/27/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 07/27/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 07/27/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 07/24/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 07/24/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Record Document | 07/21/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 07/21/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Phone Conversation | 07/20/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Letter | 06/24/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Phone Conversation | 06/24/2009 | Satisfied | JARRETT_SE | Enforcement | |||||||
Site Inspection | 06/24/2009 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Non-Compliance | ||||||
Enforcement Referral | 06/01/2009 | Accepted | JARRETT_SE | Enforcement | |||||||
Record Document | 03/25/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Letter | 03/17/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Record Document | 02/25/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/12/2009 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Site Inspection | 02/10/2009 | Major Out of Compliance | STRAUSS_RH_1 | 0/2 | Routine Compliance | ||||||
Letter | 02/10/2009 | Satisfied | STRAUSS_RH_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 01/31/2008 | Satisfied | BARNETT_JX | Routine Compliance | |||||||
Letter | 01/31/2008 | Satisfied | BARNETT_JX | Non-Compliance | |||||||
Site Inspection | 01/31/2008 | Minor Out of Compliance | BARNETT_JX | 0/2 | Routine Compliance | ||||||
Site Inspection | 02/23/2007 | In Compliance | BARNETT_JX | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/20/2006 | Satisfied | STRAUSS_RH_1 | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/17/2024 | 6076 | Minor | 4.7 Requirements not met for out-of-service systems. | Complete visual inspection of every component of a storage tank system that is designed to contains, transfers, or stores regulated substances and submit the inspection record to this office. | |||||||
12/17/2024 | 6078 | SNC-B | 4.9 Storage tanks systems with secondary containment designated out of service greater than 10 years. | Please close the tanks in accordance with subsection 62-761.800(2)(b), F.A.C. | |||||||
12/17/2024 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | Submit financial responsibility records from 10/31/2016 to present. | |||||||
03/31/2023 | 6012 | SNC-A | 2.9 No financial responsibility instrument or expired instrument for > 180 days. | The facility needs to acquire storage tank insurance. | |||||||
08/28/2020 | 4085 | SNC-B | 5.4 Storage tanks systems with secondary containment designated out of service greater than 10 years. | Please immediately properly close the tank systems in accordance with Rule 62-761.800(2)(b), F.A.C. | |||||||
04/24/2018 | 4014 | SNC-B | 2.9 Failure to maintain and demonstrate financial responsibility. This violation may lead to Placard Revocation and Delivery Prohibition. | Please provide proof of current financial responsibility or properly close the tanks | |||||||
04/24/2018 | 4086 | SNC-B | 5.5 Storage tank systems not closed as required. | Please immediately commence to properly close the tank systems | |||||||
01/07/2016 | 1103 | Minor | 4.91 UST line leak detector cannot detect a 3.0 gph discharge; not tested annually. | Please pump-out the tank to less than 1" remaining | |||||||
01/07/2016 | 1059 | Minor | 4.45 Not installed, calibrated, operated, and maintained per manufacturer's specifications. | Please pump-out the tank to less than 1" of liquid remaining | |||||||
01/07/2016 | 1117 | Minor | 4.105 Release detection devices not tested annually. | Please pump-out the tank to less than 1" liquid remaining | |||||||
01/07/2016 | 1062 | SNC-B | 4.48 Release detection not performed at least once a month. | Please pump-out the tank to less than one inch of liquid remaining and provide documentation of its proper disposal | |||||||
01/07/2016 | 1063 | Minor | 4.49 Continuous electronic leak detection not inspected monthly. | Please pump-out the tank to less than one inch of liquid remaining | |||||||
10/30/2015 | 1125 | Minor | 5.249 Requirements not met for out of service systems. | Please remove liquid to less than 1" remaining and secure tank fill ports from outside access; please provide waste disposal documentation for liquid removed from tank | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
02/26/1987 | COMPLETED | 28 | EARLY DETECTION INCENTIVE-ELIGIBLE | ||||||||