![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | South | Type | Retail Station | ||||||||
County | Collier | Status | OPEN | ||||||||
ID | 8944343 | Latitude | 26° 15' 4.8034 | ||||||||
Name |
8901 NAPLES, INC 8901 TAMIAMI TRL N |
Longitude | 81° 48' 6.2256 | ||||||||
NAPLES, FL 34108-2570 | LL Method | DPHO | |||||||||
Contact | DAVID YOUNG | LL Status | REVIEWED | ||||||||
Phone | (239) 566-2325 | Status Date | 09/21/2023 | ||||||||
Account Owner Information | |||||||||||
Name | 8901 NAPLES, INC 1150 E ATLANTIC BLVD Pompano Beach, FL 33060 |
Effective Date | 11/29/2018 | ||||||||
Contact | ANSAR QURAAN | ||||||||||
Phone | (561) 288-1710 | ||||||||||
ANSAR@POWERPETROINC.COM | |||||||||||
Placard # / Date | 691223 - 06/19/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | 8901 NAPLES, INC 1150 E ATLANTIC BLVD Pompano Beach, FL 33060 |
Effective Date | 11/18/2019 | ||||||||
Contact | ANSAR QURAAN | ||||||||||
Phone | (561) 288-1710 | ||||||||||
ANSAR@POWERPETROINC.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
770063 | 12000 | Vehicular Diesel (D) | 11/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
770064 | 12000 | Unleaded Gas (B) | 11/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
770068 | 12000 | Unleaded Gas (B) | 11/01/2006 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill (R) Double wall - tank jacket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 12000 | Unleaded Gas (B) | 11/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 12000 | Unleaded Gas (B) | 11/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 12000 | Unleaded Gas (B) | 11/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 12000 | Unleaded Gas (B) | 11/01/1988 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (E) Fiberglass (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (E) Cathodic protection (J) Pressurized piping system (K) Dispenser liners |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | COMMERCE & INDUSTRY | ||||||||||
INSURANCE | 10/31/2021 | 10/31/2022 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 10/31/2018 | 10/31/2019 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 02/10/2018 | 02/10/2019 | COMMERCE & INDUSTRY INSURANCE CO | ||||||||
INSURANCE | 02/10/2017 | 02/10/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/10/2016 | 02/10/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/10/2015 | 02/10/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/10/2014 | 02/10/2015 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/10/2013 | 02/10/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/10/2011 | 02/10/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/10/2010 | 02/10/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 02/10/2009 | 02/10/2010 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 04/20/2005 | 04/21/2005 | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes ANNUAL CP SURVEY PASSED, ANNUAL TESTS: LINE LEAK DETECTORS & ATG PASSED ..CLOSE #1112 & #1117 | |||||||||||
TCI | 03/08/2005 | 03/17/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes #1004-INSURANCE; #1117-ANNUAL LINE LEAK DETECTOR; #1112; ANNUAL CP SURVEY | |||||||||||
TIN | 02/19/2004 | 03/01/2004 | IN-COMPLIANCE | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes MOVED DISPENSERS...INSTALLED SW A.O. SMITH FIBERGLASS PIPING TO RETRO-FIT | |||||||||||
TCI | 12/16/2003 | 12/16/2003 | IN-COMPLIANCE | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: SW FIBERGLASS WITH CP ON SWING JOINTS | |||||||||||
CWOE | 03/07/2003 | 03/07/2003 | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CLOSED #157 | |||||||||||
RRBD | 03/07/2003 | 03/07/2003 | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D ANNUAL TESTING FOR PLLD...ALL PASSED | |||||||||||
TCI | 01/30/2003 | 01/30/2003 | MINOR OUT-OF-COMPLIANCE | KOLANDA | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes NEED PROOF OF ANNUAL OPERABILITY TESTING FOR PLLD | |||||||||||
RRBD | 10/11/2002 | 10/14/2002 | KOLANDA | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PROOF OF POLLUTION INSURANCE REC'DPAPERWORK IN FACILITY FILE #9801573 | |||||||||||
RRBD | 04/01/2002 | 04/02/2002 | HOGAN_S | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TANKNOLOGY RESULTS | |||||||||||
TCI | 03/05/2002 | 03/05/2002 | IN-COMPLIANCE | HOGAN_S | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes IN COMPLIANCE | |||||||||||
RRBD | 05/01/2001 | 05/11/2001 | HOGAN_S | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TANKNOLOGY TEST RESULTS | |||||||||||
TCI | 04/27/2001 | 04/27/2001 | IN-COMPLIANCE | HOGAN_S | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes IN COMPLIANCE | |||||||||||
RRBD | 03/30/2001 | 04/02/2001 | KOLANDA_S | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes RESULTS REC'D FROM TANKNOLOGY | |||||||||||
IRFR | 02/01/2001 | 02/01/2001 | KOLANDA_S | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes .2GAL/HR STATIC TEST FROM AUTOMATIC TANK GAUGE TO BE PERFORMED ON TANKS T-3 &T-4 | |||||||||||
TCR | 01/25/2000 | 01/28/2000 | IN-COMPLIANCE | SILLERY_W | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 01/21/2000 | 01/24/2000 | MINOR OUT-OF-COMPLIANCE | SILLERY_W | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 01/17/2000 | 11/30/2000 | HOGAN_S | 0/4 | COMPLIANCE ASSURANCE | ||||||
Completion Notes TANK, LINE, AND LEAK DETECTOR TESTS ON TANK 3. TANKS TEST ON TANK 4. THESE TESTS PASSED. | |||||||||||
TCI | 03/12/1999 | 04/01/1999 | IN-COMPLIANCE | SILLERY_W | 0/4 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Enforcement Referral | 11/12/2024 | Accepted | STANDIFORD_JA | Enforcement | |||||||
Letter | 12/05/2023 | Satisfied | STANDIFORD_JA | Compliance Assistance | |||||||
Electronic Communication | 11/28/2023 | Satisfied | STANDIFORD_JA | Routine Compliance | |||||||
Site Inspection | 11/28/2023 | Major Out of Compliance | STANDIFORD_JA | 0/3 | Routine Compliance | ||||||
Letter | 02/02/2022 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 02/02/2022 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 01/28/2022 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 01/24/2022 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 01/21/2022 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 12/20/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Site Inspection | 11/29/2021 | Minor Out of Compliance | HERNANDEZ_N_5 | 0/3 | Routine Compliance | ||||||
Letter | 11/29/2021 | Satisfied | HERNANDEZ_N_5 | Compliance Assistance | |||||||
Electronic Communication | 11/19/2021 | Satisfied | HERNANDEZ_N_5 | Routine Compliance | |||||||
Letter | 11/01/2019 | Satisfied | JENSEN_NJ_1 | Compliance Assistance | |||||||
Letter | 10/31/2019 | Satisfied | JENSEN_NJ_1 | Compliance Assistance | |||||||
Site Inspection | 10/31/2019 | Minor Out of Compliance | JENSEN_NJ_1 | 0/3 | Routine Compliance | ||||||
Record Document | 03/08/2019 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Issue Document | 10/29/2018 | Satisfied | SNYDERBURN_PJ_2 | Compliance Assistance | |||||||
Document Management | 10/26/2018 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||||||
Document Management | 10/26/2018 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||||||
Discharge Reporting | 10/26/2018 | Satisfied | SNYDERBURN_PJ_2 | Discharge | |||||||
Site Inspection | 10/26/2018 | In Compliance | SNYDERBURN_PJ_2 | 0/1 | Discharge | ||||||
Site Inspection | 03/17/2017 | In Compliance | SNYDERBURN_PJ_2 | 0/3 | Installation | ||||||
Letter | 01/27/2017 | Satisfied | STANDIFORD_JA_2 | Non-Compliance | |||||||
Site Inspection | 01/27/2017 | Minor Out of Compliance | STANDIFORD_JA_2 | 0/3 | Routine Compliance | ||||||
Site Inspection | 12/18/2015 | In Compliance | STANDIFORD_JA_2 | 0/3 | Non-Compliance | ||||||
Letter | 06/25/2015 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 06/05/2015 | Minor Out of Compliance | STANDIFORD_J_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 07/10/2013 | Satisfied | SPARKS_JD_1 | Routine Compliance | |||||||
Site Inspection | 06/28/2013 | In Compliance | SPARKS_JD_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/25/2012 | Satisfied | SPARKS_JD_1 | Routine Compliance | |||||||
Issue Document | 01/27/2012 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 01/27/2012 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Record Document | 01/27/2012 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Incident | 02/08/2011 | Has not led to Discharge | SNYDERBURN_PJ_2 | Incident | |||||||
Letter | 01/15/2011 | Satisfied | SNYDERBURN_PJ_2 | Non-Compliance | |||||||
Site Inspection | 01/15/2011 | Minor Out of Compliance | SNYDERBURN_PJ_2 | 0/3 | Routine Compliance | ||||||
Document Management | 01/15/2011 | Complete | SNYDERBURN_PJ_2 | Incident | |||||||
Record Document | 01/21/2010 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Record Document | 11/23/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Site Inspection | 11/17/2009 | Minor Out of Compliance | NOVAK_KM_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 11/17/2009 | Satisfied | NOVAK_KM_1 | Routine Compliance | |||||||
Letter | 11/17/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Record Document | 07/29/2009 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 11/21/2008 | Satisfied | NOVAK_KM_1 | Routine Compliance | |||||||
Letter | 11/21/2008 | Satisfied | NOVAK_KM_1 | Non-Compliance | |||||||
Site Inspection | 11/21/2008 | Minor Out of Compliance | NOVAK_KM_1 | 0/3 | Routine Compliance | ||||||
Emergency Preparedness Information | 01/07/2008 | Satisfied | POTTS_CR | Routine Compliance | |||||||
Site Inspection | 12/03/2007 | In Compliance | POTTS_CR | 0/3 | Non-Compliance | ||||||
Site Inspection | 11/15/2007 | Minor Out of Compliance | POTTS_CR | 0/3 | Routine Compliance | ||||||
Letter | 11/15/2007 | Satisfied | POTTS_CR | Non-Compliance | |||||||
Emergency Preparedness Information | 05/23/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
TCAR | 02/21/2007 | Incomplete | SNYDERBURN_PJ_2 | Closure | |||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 12/29/2006 | In Compliance | OWEN_JA | 0/4 | Closure | ||||||
Site Inspection | 12/29/2006 | In Compliance | OWEN_JA | 0/3 | Installation | ||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | SNYDERBURN_PJ_2 | Routine Compliance | |||||||
Site Inspection | 03/10/2006 | Major Out of Compliance | OWEN_JA | 0/4 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
11/28/2023 | 6002 | Minor | 2.1 Operator Training records not available. | Within 90 days of the inspection date please provide all Class A,B,& C operator training certificates to the Inspector via email. | |||||||
11/28/2023 | 7089 | Minor | 1.11 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Within 90 days of the inspection date, please email 2022 integrity testing records for the UDC's and STP sumps to the Inspector. | |||||||
11/28/2023 | 6073 | Minor | 4.9 Spill containment, dispenser liners, and piping sumps not accessible. Water or regulated substances not removed. | Within 72 hours of discovery a facility must investigate the cause of an interstitial alarm or liquids observed in interstices and remove liquids. If a cause cannot be determined, then the facility must submit an INF to Collier County SHWMD after that 72 hour period and perform an investigation. PCS stated liquids were pumped out of both interstitial spaces on 9/28/2023. Within 90 days of the inspection date, please provide documentation via email to the Inspector that states the cause of the liquids in the DSL and PUL UST interstices and what was done to correct the issue. Please submit an INF within 72 hours of the inspection date if the cause of liquids present in the DSL and PUL DWSB interstices cannot be determined to the Inspector via email. If a cause is determined, please provide the findings to the Inspector via email as soon as possible. If a cause cannot be determined, please perform an integrity test on the DWSB's. Please submit photos, manifest (for liquids removed), and completed integrity test (if needed) to the Inspector via email within 90 days of the inspection date. | |||||||
11/28/2023 | 7095 | Minor | 1.14 Records requiring 3 year documentation period not kept by facility. | Please provide AO testing records due on or before 4/3/2022 to the Inspector via email within 90 days of the inspection date. | |||||||
11/28/2023 | 6006 | Minor | 2.5 Placard not displayed (or available upon request). | Please ensure the current placard is posted. Once posted, please provide a photo to the Inspector within 90 days of the Inspection date or sooner. | |||||||
11/28/2023 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Within 90 days of Inspection date or as soon as possible, please provide all FR documentation to the Inspector from 10/31/2022 to present. | |||||||
11/28/2023 | 7075 | SNC-B | 3.1 Not repaired component or piping which has not caused a discharge or release. | Within 90 days of the inspection date, correct corrosion and email photos documenting corrective action to the Inspector via email within same timeframe. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/24/1992 | INACTIVE | 26 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||