![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Northeast | Type | Retail Station | ||||||||
County | Clay | Status | OPEN | ||||||||
ID | 8944673 | Latitude | 30° 9' 35.0506 | ||||||||
Name |
REBEL #827 466 BLANDING BLVD |
Longitude | 81° 44' 51.6643 | ||||||||
ORANGE PARK, FL 32073 | LL Method | DGPS | |||||||||
Contact | MAHENDRA PATEL | LL Status | REVIEWED | ||||||||
Phone | (904) 385-2179 | Status Date | 11/07/2003 | ||||||||
Account Owner Information | |||||||||||
Name | FUTURE ENERGY FLORIDA INC 1450 N BENSON AVE, UN#A UPLAND, CA 91786 |
Effective Date | 08/30/2021 | ||||||||
Contact | CHITTAL SHAH / CHRIS DEVELLEREZ 909-394-4728 | ||||||||||
Phone | (951) 313-7490 | ||||||||||
LICENSING@CARENTERPRISES.NET | |||||||||||
Placard # / Date | 699989 - 07/23/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | ANABI REAL ESTATE DEVELOPMENT LLC 1450 N BENSON AVE, UN#A UPLAND, CA 91786 |
Effective Date | 08/30/2021 | ||||||||
Contact | SUMMER IREIFEJ / RAWA ANABI | ||||||||||
Phone | (909) 394-4728 | ||||||||||
SIREIFEJ@CARENTERPRISES.NET | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Unleaded Gas (B) | 01/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (5) Electronic monitor dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Unleaded Gas (B) | 01/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 10000 | Vehicular Diesel (D) | 01/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (G) Electronic line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Ethanol E10 (8) | 01/01/1989 | UNDERGROUND | Closed In Place (A) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (I) Double wall (M) Spill containment bucket (N) Flow shut-Off (O) Tight fill |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (G) Electronic line leak detector (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/14/2024 | 05/14/2025 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2023 | 05/14/2024 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/14/2022 | 05/14/2023 | IRONSHORE SPECIALTY INSURANCE COMPANY | ||||||||
SURETY BOND | 12/31/2018 | 12/31/2021 | LIBERTY MUTUAL INSURANCE COMPANY | ||||||||
SURETY BOND | 01/01/2017 | 12/31/2018 | |||||||||
SURETY BOND | 01/01/2015 | 12/31/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2014 | 04/29/2015 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2013 | 04/29/2014 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2012 | 04/29/2013 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/29/2011 | 04/30/2012 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/29/2010 | 04/29/2011 | |||||||||
SELF-INSURANCE - LETTER FROM CHIEF FINANCIAL OFFICER | 04/30/2009 | 04/30/2010 | |||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCI | 03/15/2006 | 03/28/2006 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes LD TEST 2/8/06 4/4 PASS ANNUAL OPERABILITY PASS | |||||||||||
TCI | 03/22/2005 | 04/07/2005 | IN-COMPLIANCE | BARNETTT_P | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes LINE/LD/ANNUAL OPERABILITY 2/10/05 ALL PASS | |||||||||||
RRBD | 04/30/2004 | 05/11/2004 | COMPLIANCE ASSURANCE | ||||||||
TCI | 03/24/2004 | 03/29/2004 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 04/22/2003 | 05/02/2003 | IN-COMPLIANCE | BARNETT_P | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes LD TEST 4/11/03 ATG CERTIFICATION 4/11/03 | |||||||||||
TCI | 04/16/2002 | 04/22/2002 | IN-COMPLIANCE | BARNETT_P | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 02/22/2001 | 03/05/2001 | IN-COMPLIANCE | BARNETT_P | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/26/2000 | 07/10/2000 | BARNETT_P | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/17/2000 | 02/21/2000 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | /4 | COMPLIANCE ASSURANCE | |||||
RRBD | 06/04/1999 | 06/14/1999 | BARNETT_P | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 04/12/1999 | 04/19/1999 | BARNETT_P | 0/0 | COMPLIANCE ASSURANCE | ||||||
PDNE | 03/29/1999 | 03/29/1999 | BARNETT_P | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/16/1999 | 03/24/1999 | MINOR OUT-OF-COMPLIANCE | BARNETT_P | 0/4 | COMPLIANCE ASSURANCE | |||||
UTCI | 04/16/1998 | 04/17/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 10/01/2024 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 10/01/2024 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 09/23/2024 | Major Out of Compliance | HARRINGTON_RD_1 | 0/3 | Routine Compliance | ||||||
Letter | 08/12/2024 | Satisfied | JACKSON_SM | Enforcement | |||||||
Enforcement Referral | 05/03/2024 | Accepted | HARRINGTON_RD_1 | Enforcement | |||||||
Electronic Communication | 06/19/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 06/08/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Record Document | 06/08/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 03/20/2023 | Major Out of Compliance | HARRINGTON_RD_1 | 0/3 | Routine Compliance | ||||||
Letter | 03/20/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 03/20/2023 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 03/20/2023 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Incident | 11/12/2021 | Has not led to Discharge | HARRINGTON_RD_1 | Incident | |||||||
Record Document | 11/12/2021 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Letter | 10/18/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 10/18/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Record Document | 10/18/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 07/12/2021 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Letter | 07/12/2021 | Satisfied | RAMSEY_TH_1 | Closure | |||||||
Document Management | 07/11/2021 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Record Document | 07/11/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
TCAR | 07/11/2021 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Electronic Communication | 03/07/2021 | Satisfied | HARRINGTON_RD_1 | Closure | |||||||
Electronic Communication | 03/07/2021 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Letter | 03/07/2021 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Site Inspection | 03/07/2021 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/4 | Closure | ||||||
Site Inspection | 02/12/2021 | Minor Out of Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Document Management | 11/06/2020 | Satisfied | HARRINGTON_RD_1 | Incident | |||||||
Site Inspection | 03/18/2018 | In Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Letter | 03/18/2018 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 03/18/2018 | Satisfied | HARRINGTON_RD_1 | Compliance Assistance | |||||||
Electronic Communication | 03/18/2018 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Phone Conversation | 12/01/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 12/01/2015 | In Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 12/01/2015 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 01/15/2014 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Electronic Communication | 12/18/2013 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 12/17/2013 | In Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 01/09/2012 | In Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 02/21/2011 | In Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 03/29/2010 | In Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 12/09/2009 | In Compliance | HARRINGTON_RD_1 | 0/4 | Routine Compliance | ||||||
Record Document | 12/09/2009 | Satisfied | HARRINGTON_RD_1 | Routine Compliance | |||||||
Site Inspection | 05/21/2009 | In Compliance | BARNETT_PC_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 04/30/2008 | In Compliance | BROWN_JZ | 0/4 | Routine Compliance | ||||||
Site Inspection | 04/27/2007 | In Compliance | BARNETT_PC_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 02/13/2007 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/21/2006 | Satisfied | BARNETT_PC_1 | Routine Compliance | |||||||
Letter | 08/24/2006 | Satisfied | BARNETT_PC_1 | Non-Compliance | |||||||
Site Inspection | 08/24/2006 | In Compliance | BARNETT_PC_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 08/24/2006 | Minor Out of Compliance | BARNETT_PC_1 | 0/4 | Non-Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
09/23/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Please provide current dispenser liner Integrity Test documentation. | |||||||
09/23/2024 | 6066 | Minor | 4.4 Not repaired per applicable standards. | Please anchor the shear valve in dispenser liner 1/2. Provide verification. | |||||||
03/20/2023 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Repair or replace dispenser liner 9/10. Provide post-repair hydro test result documentation. | |||||||
No Discharges Found |