Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
||||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/02/2025 Last Data Refresh: 02/01/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Escambia | Status | OPEN | ||||||||
ID | 8944709 | Latitude | 30° 30' 22.3218 | ||||||||
Name |
BEULAH FOOD MART 7468 MOBILE HWY |
Longitude | 87° 21' 18.2207 | ||||||||
PENSACOLA, FL 32526 | LL Method | DGPS | |||||||||
Contact | MOHAMMED S MIAH | LL Status | REVIEWED | ||||||||
Phone | (407) 409-6389 | Status Date | 10/16/2003 | ||||||||
Account Owner Information | |||||||||||
Name | BEULAH FOOD MART 7486 MOBILE HWY PENSACOLA, FL 32526 |
Effective Date | 01/01/2022 | ||||||||
Contact | MOHAMMED S MIAH | ||||||||||
Phone | (407) 409-6389 | ||||||||||
SHAHJAHAN83@HOTMAIL.COM | |||||||||||
Placard # / Date | 702374 - 10/18/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | BEULAH FOOD MART 7486 MOBILE HWY PENSACOLA, FL 32526 |
Effective Date | 01/01/2022 | ||||||||
Contact | MOHAMMED S MIAH | ||||||||||
Phone | (407) 409-6389 | ||||||||||
SHAHJAHAN83@HOTMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 8000 | Vehicular Diesel (D) | 06/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 4000 | Unleaded Gas (B) | 06/01/2007 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (F) Fiberglass clad steel (L) Compartmented (M) Spill containment bucket (O) Tight fill (R) Double wall - tank jacket |
(F) Double wall (J) Pressurized piping system (K) Dispenser liners (N) Approved synthetic material |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 6000 | Vehicular Diesel (D) | 12/01/1986 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 6000 | Unleaded Gas (B) | 12/01/1986 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Unleaded Gas (B) | 12/01/1986 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 6000 | Unleaded Gas (B) | 12/01/1986 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (M) Spill containment bucket (N) Flow shut-Off |
(C) Fiberglass (J) Pressurized piping system (K) Dispenser liners |
(4) Visual inspect dispenser liners (H) Mechanical line leak detector (S) Statistical Inventory Reconcile |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 10/24/2018 | 10/24/2019 | ACE | ||||||||
INSURANCE | 10/24/2017 | 10/24/2018 | ACE | ||||||||
INSURANCE | 10/24/2016 | 10/24/2017 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 10/24/2014 | 10/24/2015 | ACE | ||||||||
INSURANCE | 10/24/2011 | 10/24/2012 | ZURICH-AMERICAN | ||||||||
INSURANCE | 10/23/2010 | 10/23/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 10/24/2009 | 10/24/2010 | ZURICH-AMERICAN | ||||||||
INSURANCE | 10/23/2008 | 10/23/2009 | ZURICH-AMERICAN | ||||||||
INSURANCE | 12/22/1993 | 10/24/1999 | FPLIPA | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 08/03/2005 | 08/04/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 05/31/2005 | 06/01/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | ARTHUR B. TISSINGTON | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 11/21/2003 | 12/01/2003 | IN-COMPLIANCE | J. SCOTT HALE | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 08/13/2003 | 08/15/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | JOSEPH S. HALE | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 01/06/2003 | 01/10/2003 | MINOR OUT-OF-COMPLIANCE | REGINALD W. BRADLEY | 0/4 | COMPLIANCE ASSURANCE | |||||
IRFR | 08/23/2002 | 08/23/2002 | REGINALD W. BRADLEY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes JANUARY AND FEBRUARY 2002 SIR FAILURE | |||||||||||
TCI | 08/08/2002 | 08/16/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | REGINALD W. BRADLEY | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 12/14/2001 | 01/16/2002 | IN-COMPLIANCE | REGINALD W. BRADLEY | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 03/20/2001 | 04/11/2001 | IN-COMPLIANCE | HUTCHERSON_VP | 0/4 | COMPLIANCE ASSURANCE | |||||
TCR | 06/09/2000 | 06/28/2000 | IN-COMPLIANCE | HUTCHERSON-VP | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 03/20/2000 | 04/17/2000 | HUTCHERSON_VP | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/20/2000 | 03/29/2000 | MINOR OUT-OF-COMPLIANCE | HUTCHERSON_VP | 4/0 | COMPLIANCE ASSURANCE | |||||
WLI | 02/16/1999 | 02/24/1999 | JOHN S STEVENSON | 0/4 | COMPLIANCE ASSURANCE | ||||||
TCR | 02/02/1999 | 02/24/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | JOHN STEVENSON | 0/4 | COMPLIANCE ASSURANCE | |||||
UTCI | 09/08/1998 | 10/13/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
TCAR | 01/17/2025 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
Letter | 01/17/2025 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
Document Management | 01/17/2025 | Satisfied | ELLIOTT_EV_1 | Component Closure | |||||||
Site Inspection | 12/18/2024 | Major Out of Compliance | ELLIOTT_EV_1 | 0/2 | Compliance Assistance | ||||||
Letter | 12/18/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Document Management | 10/23/2024 | Satisfied | ELLIOTT_EV_1 | Incident | |||||||
Enforcement Referral | 07/31/2024 | Accepted | ELLIOTT_EV_1 | Enforcement | |||||||
Electronic Communication | 06/03/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Site Inspection | 05/06/2024 | Major Out of Compliance | ELLIOTT_EV_1 | 0/2 | Routine Compliance | ||||||
Letter | 05/06/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Electronic Communication | 05/01/2024 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Record Document | 01/08/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Incident | 12/14/2023 | Has not led to Discharge | ELLIOTT_EV_1 | Incident | |||||||
TCAR | 12/14/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Letter | 12/14/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Document Management | 12/14/2023 | Satisfied | PAYNE_CL_1 | Component Closure | |||||||
Site Inspection | 12/01/2023 | Major Out of Compliance | ELLIOTT_EV_1 | 0/2 | Component Installation | ||||||
Letter | 12/01/2023 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Record Document | 11/20/2023 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Letter | 11/08/2023 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Site Inspection | 11/07/2023 | Major Out of Compliance | ELLIOTT_EV_1 | 0/2 | Component Installation | ||||||
Document Management | 09/07/2023 | Satisfied | ELLIOTT_EV_1 | Incident | |||||||
Letter | 03/30/2023 | Satisfied | TOMAS_M | Enforcement | |||||||
Letter | 01/30/2023 | Satisfied | TOMAS_M | Enforcement | |||||||
Letter | 08/29/2022 | Satisfied | TOMAS_M | Enforcement | |||||||
Enforcement Referral | 08/01/2022 | Accepted | GARTIN_D | Enforcement | |||||||
Electronic Communication | 07/21/2022 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 05/20/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 05/11/2022 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Site Inspection | 05/11/2022 | Major Out of Compliance | GARTIN_D | 0/2 | Routine Compliance | ||||||
Enforcement Tracking | 08/25/2020 | Closed Without Enforcement | GILLMAN_M | Enforcement | |||||||
Electronic Communication | 03/09/2020 | Satisfied | THROCKMORTON_JN | Enforcement | |||||||
Enforcement Referral | 01/07/2020 | Accepted | BRAGG_SD_2 | Enforcement | |||||||
Electronic Communication | 10/21/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Electronic Communication | 10/18/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Electronic Communication | 10/18/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Site Inspection | 10/16/2019 | Major Out of Compliance | BRAGG_SD_2 | 0/2 | Routine Compliance | ||||||
Letter | 10/16/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 10/16/2019 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 10/14/2019 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Phone Conversation | 09/30/2019 | Satisfied | BRAGG_SD_2 | Routine Compliance | |||||||
Enforcement Referral | 07/19/2018 | Accepted | BRAGG_SD_2 | Enforcement | |||||||
Record Document | 07/12/2017 | Satisfied | BRAGG_SD_2 | Compliance Assistance | |||||||
Letter | 05/02/2017 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 05/02/2017 | Minor Out of Compliance | BRAGG_SD_2 | 0/2 | Non-Compliance | ||||||
Letter | 04/24/2017 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 04/24/2017 | Minor Out of Compliance | BRAGG_SD_2 | 0/2 | Routine Compliance | ||||||
Site Inspection | 05/28/2015 | In Compliance | PAYNE_CL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 05/27/2015 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 10/02/2012 | In Compliance | PAYNE_CL_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 10/02/2012 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Letter | 03/20/2012 | Satisfied | PURDY_EM_1 | Non-Compliance | |||||||
Site Inspection | 03/16/2012 | Minor Out of Compliance | PORTER_AJ_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/16/2012 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Site Inspection | 11/15/2010 | In Compliance | HALE_JS_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 03/18/2010 | In Compliance | PORTER_AJ_1 | 0/2 | Routine Compliance | ||||||
Emergency Preparedness Information | 03/18/2010 | Satisfied | PORTER_AJ_1 | Routine Compliance | |||||||
Site Inspection | 04/20/2009 | In Compliance | THAYER_JD_1 | 0/3 | Non-Compliance | ||||||
Letter | 03/31/2009 | Satisfied | THAYER_JD_1 | Non-Compliance | |||||||
Site Inspection | 03/30/2009 | Minor Out of Compliance | THAYER_JD_1 | 0/2 | Routine Compliance | ||||||
Site Inspection | 05/02/2008 | In Compliance | TISSINGTON_AB_1 | 0/2 | Routine Compliance | ||||||
Letter | 04/28/2008 | Satisfied | TISSINGTON_AB_1 | Non-Compliance | |||||||
Site Inspection | 04/21/2008 | Minor Out of Compliance | TISSINGTON_AB_1 | 0/2 | Non-Compliance | ||||||
Emergency Preparedness Information | 04/21/2008 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Complaint | 11/19/2007 | Satisfied | TISSINGTON_AB_1 | Complaint | |||||||
Phone Conversation | 11/19/2007 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 10/01/2007 | In Compliance | TISSINGTON_AB_1 | 0/2 | Installation | ||||||
Site Inspection | 06/04/2007 | In Compliance | TISSINGTON_AB_1 | 0/4 | Closure | ||||||
Site Inspection | 03/14/2007 | Minor Out of Compliance | TISSINGTON_AB_1 | 0/4 | Routine Compliance | ||||||
Letter | 03/14/2007 | Satisfied | TISSINGTON_AB_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 02/07/2007 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
Emergency Preparedness Information | 09/22/2006 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 06/19/2006 | Major Out of Compliance | TISSINGTON_AB_1 | 0/4 | Routine Compliance | ||||||
Letter | 06/19/2006 | Satisfied | TISSINGTON_AB_1 | Non-Compliance | |||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
12/18/2024 | 6083 | SNC-B | 4.14 Closure assessment, sampling not performed and submitted within 60 days. | Have the Consultant submit the Closure Assessment Report to this office to clear the violation. Email: Emily.Elliott@FLHealth.gov. | |||||||
05/06/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have a certified contractor replaced the Regular Spill Containment Gauge. Contact the inspector a minimum of 30 days prior to replacement activities for to receive the appropriate paperwork. Once work is completed have the operability of the regular spill containment gauge tested and the integrity of the regular spill containment. Email: Emily.Elliott@FLHealth.gov | |||||||
05/06/2024 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have a certified contractor repair or replace the Regular, Premium, Non-Ethanol, and Diesel Spill Containment Gauges. Contact the inspector prior to work beginning for necessary paperwork. Email: Emily.Elliott@FLHealth.gov | |||||||
05/06/2024 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Provide documentation of Financial Responsibility. If facility does not have any Financial Responsibility, obtain retro-active coverage. Submit a copy of the FDEP Financial Mechanisms Part C or Part D Form and a Part P Form to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
05/06/2024 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | Have a certified technician test the integrity of the Double Wall Spill Containments. Once completed, send a copy of the results, that includes all test data, to the inspector for review to clear the violation. Email: Emily.Elliott@FLHealth.gov | |||||||
05/06/2022 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | If needed, have a certified contractor conduct the integrity testing for the spill buckets installed at the facility and repair/replace any damaged components. Forward any work conducted and passing integrity testing to Daniel.Gartin@flhealth.gov. | |||||||
05/06/2022 | 6011 | SNC-B | 2.8 No financial responsibility instrument or expired instrument for < 180 days. | Have the facility's associated primary mechanism DEP Form 62-761.900(3) document and the DEP Form 62-761.900(3) Part P Storage Tank Certification of Financial Responsibility form (completed by the facility) completed and submitted to Daniel.Gartin@flhealth.gov. | |||||||
No Discharges Found |