Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 02/23/2025 Last Data Refresh: 02/22/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Marine/Coastal Fuel Storage | ||||||||
County | Bay | Status | OPEN | ||||||||
ID | 8944905 | Latitude | 30° 10' 7.279 | ||||||||
Name |
ST ANDREWS MARINA 3151 W 10TH ST |
Longitude | 85° 42' 17.0233 | ||||||||
PANAMA CITY, FL 32401-1461 | LL Method | DPHO | |||||||||
Contact | DAVID COLBERT | LL Status | REVIEWED | ||||||||
Phone | (850) 771-5889 | Status Date | 10/08/2003 | ||||||||
Account Owner Information | |||||||||||
Name | PANAMA CITY CITY 501 HARRISON AVE Panama City, FL 32401 |
Effective Date | 09/25/1989 | ||||||||
Contact | REBECCA TACKITT / JONATHAN HAYES 850-872-3000 | ||||||||||
Phone | (850) 628-5289 | ||||||||||
RTACKITT@PANAMACITY.GOV | |||||||||||
Placard # / Date | 694229 - 06/25/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | PANAMA CITY CITY 501 HARRISON AVE Panama City, FL 32401 |
Effective Date | 06/06/2019 | ||||||||
Contact | REBECCA TACKITT / JONATHAN HAYES 850-872-3000 | ||||||||||
Phone | (850) 628-5289 | ||||||||||
RTACKITT@PANAMACITY.GOV | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 12000 | Vehicular Diesel (D) | 01/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 12000 | Vehicular Diesel (D) | 01/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
9 | 6000 | Unleaded Gas (B) | 01/01/2008 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (M) Spill containment bucket (P) Level gauges/alarms (R) Double wall - tank jacket |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 10000 | Vehicular Diesel (D) | 11/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 10000 | Vehicular Diesel (D) | 11/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 6000 | Unleaded Gas (B) | 11/01/1987 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (G) Sacrificial anode CP (M) Spill containment bucket (N) Flow shut-Off |
(J) Pressurized piping system (K) Dispenser liners (M) Double wall - pipe jacket (N) Approved synthetic material |
(1) Continuous electronic sensing (3) Electronic monitor pipe sumps (4) Visual inspect dispenser liners (H) Mechanical line leak detector (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 8000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 8000 | Vehicular Diesel (D) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (X) None | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 1000 | Waste Oil (L) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (C) Fiberglass | (X) None | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 01/18/2025 | 01/18/2026 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 01/01/2024 | 01/01/2025 | CRUM & FORSTER SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 01/01/2023 | 01/01/2024 | CRUM & FORSTER INDEMNITY COMPANY | ||||||||
INSURANCE | 01/01/2020 | 01/01/2022 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 01/10/2018 | 01/01/2020 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 01/01/2017 | 01/01/2018 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 01/01/2016 | 01/01/2018 | CRUM & FORSTER INDEMNITY | ||||||||
INSURANCE | 01/01/2015 | 01/01/2016 | CRUM & FORSTER SPECIALTY INS. CO. | ||||||||
INSURANCE | 01/01/2013 | 01/01/2014 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 01/01/2012 | 01/01/2013 | AMERICAN SAFETY INDEMNITY CO | ||||||||
INSURANCE | 03/02/2010 | 03/02/2011 | ILLINOIS UNION | ||||||||
INSURANCE | 03/02/2009 | 03/02/2010 | ILLINOIS UNION | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 11/29/2005 | 11/30/2005 | IN-COMPLIANCE | BRAZILE | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes DPRI CERTIFICATE #099953 04/20/2005 | |||||||||||
DPRI | 11/29/2005 | 11/30/2005 | BRAZILE | 0/3 | TERMINAL FACILITY PROJECT | ||||||
Completion Notes CERTIFICATE #099953, 04/20/2005 | |||||||||||
TCR | 09/26/2005 | 09/28/2005 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCI | 07/18/2005 | 07/19/2005 | IN-COMPLIANCE | BRAZILE | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST HURRICANE DENNIS INSPECTION. NO DAMAGE AT THE TIME OF THE INSPECTION. | |||||||||||
TCI | 04/20/2005 | 04/27/2005 | MINOR OUT-OF-COMPLIANCE | KHAN | 0/3 | COMPLIANCE ASSURANCE | |||||
TCR | 09/22/2004 | 09/29/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: OPW PISCES FLEXIBLE | |||||||||||
TCI | 09/22/2004 | 09/28/2004 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes POST HURRICANE IVAN INSPECTION | |||||||||||
CRDE | 07/16/2004 | 07/19/2004 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes #144, WEEP AT UNION-DIESEL DISPENSER | |||||||||||
TCR | 07/16/2004 | 07/19/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: OPW PISCES FLEXIBLE | |||||||||||
TCI | 05/04/2004 | 05/07/2004 | MINOR OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING; DW OPW PISCES FLEXIBLE DPRI CERTIFICATE # 099939 | |||||||||||
DPRI | 05/04/2004 | 05/07/2004 | IN-COMPLIANCE | PINKOVSKY | 0/0 | TERMINAL FACILITY PROJECT | |||||
Completion Notes CERTIFICATE # 099939 | |||||||||||
TXI | 10/08/2003 | 10/08/2003 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: OPW PISCES DOUBLEWALLED FLEXIBLE; CLOSURE OF PIPING AND DISPENSERS | |||||||||||
TIN | 10/07/2003 | 10/08/2003 | IN-COMPLIANCE | PNKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: OPW PISCES DOUBLEWALLED FLEXIBLE; INSTALL OF PIPING, DISPENSER LINERS, TANK SUMPS AND TLS 300 ATG; CLOSES CRDE 11131420 & 11252119- NOTE TO NWD | |||||||||||
TCI | 05/08/2003 | 05/12/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes PIPING: FIBERGLASS (UNKNOWN) DPRI CERTIFICATE # 099920 | |||||||||||
DPRI | 05/08/2003 | 05/12/2003 | IN-COMPLIANCE | PINKOVSKY | 0/3 | TERMINAL FACILITY PROJECT | |||||
Completion Notes DPRC # 099920 | |||||||||||
CRDE | 05/08/2003 | 05/12/2003 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CONTINUING VIOLATION FRON 05/15/02 TCI #76 SNC A-SUBMERGED PUMP/PIPING NOT CATHODICALLY PROTECTED, IN CONTACT WITH SOIL. UPGRADE PROJECT ONGOING. | |||||||||||
RRBD | 10/08/2002 | 10/10/2002 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
RRBD | 08/15/2002 | 09/03/2002 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
DRFR | 06/10/2002 | 06/11/2002 | DREW PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes DRF SUBMITTED AFTER FAILING LINE TEST CONFIRMED SURFACE WATER PRODUCT SEEN WAS FROM THE FACILITY. | |||||||||||
TDI | 06/10/2002 | 06/17/2002 | IN-COMPLIANCE | PINKOVSKY | 0/1 | DISCHARGE PROJECT | |||||
IRFR | 06/07/2002 | 06/10/2002 | DREW PINKOVSKY | 0/0 | DISCHARGE PROJECT | ||||||
Completion Notes INF RECEIVED FOR PRODUCT/SHEEN ON WATER;TO CONFIRM OR DENY IF A RELEASE FROM THE FACILITY. | |||||||||||
CRDE | 05/15/2002 | 05/20/2002 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
Completion Notes SNC A # 76 & 106 | |||||||||||
TCI | 05/15/2002 | 05/20/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
Completion Notes DPRI #099904 | |||||||||||
DPRI | 05/15/2002 | 05/20/2002 | IN-COMPLIANCE | PINKOVSKY | 0/3 | TERMINAL FACILITY PROJECT | |||||
Completion Notes DPRC # 099904 | |||||||||||
TCI | 05/25/2001 | 05/30/2001 | MINOR OUT-OF-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 03/30/2001 | 03/30/2001 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
TXI | 12/15/2000 | 12/13/2002 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/21/2000 | 07/28/2000 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
RRBD | 04/18/2000 | 04/18/2000 | PINKOVSKY | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 03/09/2000 | 03/20/2000 | MINOR OUT-OF-COMPLIANCE | BRADLEY | 0/3 | COMPLIANCE ASSURANCE | |||||
TIN | 06/21/1999 | 06/21/1999 | IN-COMPLIANCE | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | |||||
NCLI | 02/19/1999 | 03/16/1999 | PINKOVSKY | 0/3 | COMPLIANCE ASSURANCE | ||||||
TCI | 02/11/1999 | 03/16/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | CAMPBELL | 0/3 | COMPLIANCE ASSURANCE | |||||
UTCI | 03/30/1998 | 04/01/1998 | MINOR OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Site Inspection | 02/18/2025 | Major Out of Compliance | GARTIN_D | 0/3 | Routine Compliance | ||||||
Electronic Communication | 02/18/2025 | Satisfied | GARTIN_D | Routine Compliance | |||||||
Letter | 02/07/2025 | Satisfied | GARTIN_D | Component Closure | |||||||
Document Management | 02/04/2025 | Satisfied | GARTIN_D | Component Closure | |||||||
TCAR | 02/04/2025 | Satisfied | GARTIN_D | Component Closure | |||||||
Letter | 01/31/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Record Document | 01/15/2025 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Letter | 12/11/2024 | Satisfied | GARTIN_D | Compliance Assistance | |||||||
Site Inspection | 12/10/2024 | Minor Out of Compliance | GARTIN_D | 0/3 | Component Installation | ||||||
Letter | 06/02/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 05/31/2023 | Satisfied | KHAN_MR_1 | Compliance Assistance | |||||||
Phone Conversation | 03/01/2023 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 03/01/2023 | Major Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Letter | 03/01/2023 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 08/19/2021 | Satisfied | TESSIER_A | Enforcement | |||||||
Electronic Communication | 08/19/2021 | Satisfied | TESSIER_A | Enforcement | |||||||
Enforcement Tracking | 08/19/2021 | Closed Without Enforcement | TESSIER_A | Enforcement | |||||||
Electronic Communication | 08/19/2021 | Satisfied | TESSIER_A | Enforcement | |||||||
Electronic Communication | 08/19/2021 | Satisfied | TESSIER_A | Enforcement | |||||||
Electronic Communication | 06/24/2021 | Satisfied | TESSIER_A | Enforcement | |||||||
Letter | 06/17/2021 | Satisfied | TESSIER_A | Enforcement | |||||||
Enforcement Referral | 06/02/2021 | Accepted | KHAN_MR_1 | Enforcement | |||||||
Issue Document | 02/26/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 02/26/2021 | Major Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Letter | 02/26/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Phone Conversation | 02/26/2021 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 10/26/2018 | In Compliance | WILSON_ML_1 | 0/3 | Complaint | ||||||
Letter | 03/02/2018 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Issue Document | 03/02/2018 | Satisfied | WILSON_ML_1 | Routine Compliance | |||||||
Site Inspection | 02/23/2018 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 02/22/2018 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 01/12/2016 | In Compliance | KHAN_MR_1 | 0/3 | Non-Compliance | ||||||
Record Document | 12/07/2015 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 10/21/2015 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 10/20/2015 | Minor Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Phone Conversation | 10/08/2015 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 11/06/2013 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 05/15/2012 | In Compliance | KHAN_MR_1 | 0/3 | Non-Compliance | ||||||
Site Inspection | 03/06/2012 | Minor Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 08/26/2010 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Discharge Reporting | 06/18/2010 | Satisfied | BRAZILE_DO_1 | Discharge | |||||||
Document Management | 06/17/2010 | Complete | BRAZILE_DO_1 | Discharge | |||||||
Letter | 06/16/2010 | Satisfied | BRAZILE_DO_1 | Discharge | |||||||
Record Document | 05/20/2010 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Issue Document | 04/13/2010 | Satisfied | BRISTOL_S | Enforcement | |||||||
Site Inspection | 09/02/2009 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Enforcement Tracking | 12/24/2008 | Closed Without Enforcement | BRISTOL_S | Enforcement | |||||||
Record Document | 12/24/2008 | Satisfied | BRISTOL_S | Enforcement | |||||||
Site Inspection | 09/24/2008 | In Compliance | BRAZILE_DO_1 | 0/3 | Non-Compliance | ||||||
Letter | 09/04/2008 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Site Inspection | 08/29/2008 | Minor Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Enforcement Referral | 04/15/2008 | Accepted | BRISTOL_S | Enforcement | |||||||
Site Inspection | 04/07/2008 | In Compliance | BRAZILE_DO_1 | 0/3 | Discharge | ||||||
Site Inspection | 02/27/2008 | In Compliance | BRAZILE_DO_1 | 0/3 | Installation | ||||||
Site Inspection | 01/10/2008 | In Compliance | BRAZILE_DO_1 | 0/3 | Closure | ||||||
Site Inspection | 11/05/2007 | In Compliance | KHAN_MR_1 | 0/3 | Non-Compliance | ||||||
Record Document | 10/24/2007 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Letter | 09/11/2007 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Meeting | 09/04/2007 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 09/04/2007 | Minor Out of Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 10/13/2006 | In Compliance | KHAN_MR_1 | 0/3 | Routine Compliance | ||||||
Site Inspection | 05/12/2006 | In Compliance | BRAZILE_DO_1 | 0/3 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
02/18/2025 | 6003 | Minor | 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. | Have the registration information for the double wall storage tanks of tank 7, tank 8, and tank 9 updated to properly list the primary construction as fiberglass clad steel instead of the currently registration of steel. Send the updated registration form to tankregistration@floridadep.gov and Daniel.Gartin@flhealth.gov. | |||||||
02/18/2025 | 6063 | SNC-B | 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. | Have a certified contractor conduct the replacement of entry boots in the non-ethanol STP sump. Have a work notification form submitted prior to work being conducted on the boot's replacement. Once replacement has occurred, submit the hydrostatic testing of this STP sump to Daniel.Gartin@flhealth.gov. | |||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
01/24/2008 | COMPLETED | 26 | |||||||||
06/10/2002 | COMPLETED | 9 | |||||||||
12/13/2000 | COMPLETED | 10 | |||||||||