Report Run Date: 02/23/2025        Last Data Refresh: 02/22/2025        Report Generated from DOPPLER
 
District Northwest   Type    Marine/Coastal Fuel Storage
 
County Bay   Status    OPEN
 
ID 8944905   Latitude    30° 10' 7.279
 
Name ST ANDREWS MARINA
3151 W 10TH ST
Longitude    85° 42' 17.0233
  PANAMA CITY, FL 32401-1461 LL Method    DPHO
 
Contact DAVID COLBERT   LL Status    REVIEWED
 
Phone (850) 771-5889   Status Date    10/08/2003
 
Account Owner Information
 
Name PANAMA CITY CITY
501 HARRISON AVE
Panama City, FL 32401
Effective Date    09/25/1989
 
Contact REBECCA TACKITT / JONATHAN HAYES 850-872-3000
 
Phone (850) 628-5289
 
Email RTACKITT@PANAMACITY.GOV
  Placard # / Date    694229 - 06/25/2024
Property Owner Information
 
Name PANAMA CITY CITY
501 HARRISON AVE
Panama City, FL 32401
Effective Date    06/06/2019
 
Contact REBECCA TACKITT / JONATHAN HAYES 850-872-3000
 
Phone (850) 628-5289
 
Email RTACKITT@PANAMACITY.GOV
 
 
 
 
 
 
 
 
 
Tank Tank Size Content Installed Placement Status
7 12000 Vehicular Diesel (D) 01/01/2008 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
8 12000 Vehicular Diesel (D) 01/01/2008 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
9 6000 Unleaded Gas (B) 01/01/2008 UNDERGROUND In Service (U)
 
Constructions   Pipings Monitorings
(C) Steel
(M) Spill containment bucket
(P) Level gauges/alarms
(R) Double wall - tank jacket
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
1 10000 Vehicular Diesel (D) 11/01/1987 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
2 10000 Vehicular Diesel (D) 11/01/1987 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
3 6000 Unleaded Gas (B) 11/01/1987 UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel
(G) Sacrificial anode CP
(M) Spill containment bucket
(N) Flow shut-Off
  (J) Pressurized piping system
(K) Dispenser liners
(M) Double wall - pipe jacket
(N) Approved synthetic material
(1) Continuous electronic sensing
(3) Electronic monitor pipe sumps
(4) Visual inspect dispenser liners
(H) Mechanical line leak detector
(L) Automatic tank gauging - USTs
 
 
Tank Tank Size Content Installed Placement Status
4 8000 Vehicular Diesel (D) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (X) None
 
 
Tank Tank Size Content Installed Placement Status
5 8000 Vehicular Diesel (D) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (X) None
 
 
Tank Tank Size Content Installed Placement Status
6 1000 Waste Oil (L) UNDERGROUND Removed from Site (B)
 
Constructions   Pipings Monitorings
(C) Steel   (C) Fiberglass (X) None
 
 
Insurance Documents
 
FR Type   Effective Date Expiration Date Company Name
INSURANCE   01/18/2025 01/18/2026 CRUM & FORSTER SPECIALTY INSURANCE COMPANY
INSURANCE   01/01/2024 01/01/2025 CRUM & FORSTER SPECIALTY INSURANCE COMPANY
INSURANCE   01/01/2023 01/01/2024 CRUM & FORSTER INDEMNITY COMPANY
INSURANCE   01/01/2020 01/01/2022 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   01/10/2018 01/01/2020 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   01/01/2017 01/01/2018 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   01/01/2016 01/01/2018 CRUM & FORSTER INDEMNITY
INSURANCE   01/01/2015 01/01/2016 CRUM & FORSTER SPECIALTY INS. CO.
INSURANCE   01/01/2013 01/01/2014 AMERICAN SAFETY INDEMNITY CO
INSURANCE   01/01/2012 01/01/2013 AMERICAN SAFETY INDEMNITY CO
INSURANCE   03/02/2010 03/02/2011 ILLINOIS UNION
INSURANCE   03/02/2009 03/02/2010 ILLINOIS UNION
 
 
Legacy Compliance Activity Information
 
Activity
Code
Date
Initiated
Date
Completed
Results Inspector AST/UST
Count
Description
TCR 11/29/2005 11/30/2005 IN-COMPLIANCE BRAZILE 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes DPRI CERTIFICATE #099953 04/20/2005
 
DPRI 11/29/2005 11/30/2005 BRAZILE 0/3 TERMINAL FACILITY PROJECT
 
 Completion Notes CERTIFICATE #099953, 04/20/2005
 
TCR 09/26/2005 09/28/2005 MINOR OUT-OF-COMPLIANCE KHAN 0/3 COMPLIANCE ASSURANCE
 
TCI 07/18/2005 07/19/2005 IN-COMPLIANCE BRAZILE 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes POST HURRICANE DENNIS INSPECTION. NO DAMAGE AT THE TIME OF THE INSPECTION.
 
TCI 04/20/2005 04/27/2005 MINOR OUT-OF-COMPLIANCE KHAN 0/3 COMPLIANCE ASSURANCE
 
TCR 09/22/2004 09/29/2004 MINOR OUT-OF-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: OPW PISCES FLEXIBLE
 
TCI 09/22/2004 09/28/2004 IN-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes POST HURRICANE IVAN INSPECTION
 
CRDE 07/16/2004 07/19/2004 PINKOVSKY 0/0 COMPLIANCE ASSURANCE
 
 Completion Notes #144, WEEP AT UNION-DIESEL DISPENSER
 
TCR 07/16/2004 07/19/2004 MINOR OUT-OF-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: OPW PISCES FLEXIBLE
 
TCI 05/04/2004 05/07/2004 MINOR OUT-OF-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING; DW OPW PISCES FLEXIBLE DPRI CERTIFICATE # 099939
 
DPRI 05/04/2004 05/07/2004 IN-COMPLIANCE PINKOVSKY 0/0 TERMINAL FACILITY PROJECT
 
 Completion Notes CERTIFICATE # 099939
 
TXI 10/08/2003 10/08/2003 IN-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: OPW PISCES DOUBLEWALLED FLEXIBLE; CLOSURE OF PIPING AND DISPENSERS
 
TIN 10/07/2003 10/08/2003 IN-COMPLIANCE PNKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: OPW PISCES DOUBLEWALLED FLEXIBLE; INSTALL OF PIPING, DISPENSER LINERS, TANK SUMPS AND TLS 300 ATG; CLOSES CRDE 11131420 & 11252119- NOTE TO NWD
 
TCI 05/08/2003 05/12/2003 SIGNIFICANT OUT-OF-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes PIPING: FIBERGLASS (UNKNOWN) DPRI CERTIFICATE # 099920
 
DPRI 05/08/2003 05/12/2003 IN-COMPLIANCE PINKOVSKY 0/3 TERMINAL FACILITY PROJECT
 
 Completion Notes DPRC # 099920
 
CRDE 05/08/2003 05/12/2003 PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes CONTINUING VIOLATION FRON 05/15/02 TCI #76 SNC A-SUBMERGED PUMP/PIPING NOT CATHODICALLY PROTECTED, IN CONTACT WITH SOIL. UPGRADE PROJECT ONGOING.
 
RRBD 10/08/2002 10/10/2002 PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
RRBD 08/15/2002 09/03/2002 PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
DRFR 06/10/2002 06/11/2002 DREW PINKOVSKY 0/0 DISCHARGE PROJECT
 
 Completion Notes DRF SUBMITTED AFTER FAILING LINE TEST CONFIRMED SURFACE WATER PRODUCT SEEN WAS FROM THE FACILITY.
 
TDI 06/10/2002 06/17/2002 IN-COMPLIANCE PINKOVSKY 0/1 DISCHARGE PROJECT
 
IRFR 06/07/2002 06/10/2002 DREW PINKOVSKY 0/0 DISCHARGE PROJECT
 
 Completion Notes INF RECEIVED FOR PRODUCT/SHEEN ON WATER;TO CONFIRM OR DENY IF A RELEASE FROM THE FACILITY.
 
CRDE 05/15/2002 05/20/2002 PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes SNC A # 76 & 106
 
TCI 05/15/2002 05/20/2002 SIGNIFICANT OUT-OF-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
 Completion Notes DPRI #099904
 
DPRI 05/15/2002 05/20/2002 IN-COMPLIANCE PINKOVSKY 0/3 TERMINAL FACILITY PROJECT
 
 Completion Notes DPRC # 099904
 
TCI 05/25/2001 05/30/2001 MINOR OUT-OF-COMPLIANCE BRADLEY 0/3 COMPLIANCE ASSURANCE
 
TIN 03/30/2001 03/30/2001 IN-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
TXI 12/15/2000 12/13/2002 IN-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
RRBD 07/21/2000 07/28/2000 PINKOVSKY 0/0 COMPLIANCE ASSURANCE
 
RRBD 04/18/2000 04/18/2000 PINKOVSKY 0/0 COMPLIANCE ASSURANCE
 
TCI 03/09/2000 03/20/2000 MINOR OUT-OF-COMPLIANCE BRADLEY 0/3 COMPLIANCE ASSURANCE
 
TIN 06/21/1999 06/21/1999 IN-COMPLIANCE PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
NCLI 02/19/1999 03/16/1999 PINKOVSKY 0/3 COMPLIANCE ASSURANCE
 
TCI 02/11/1999 03/16/1999 SIGNIFICANT OUT-OF-COMPLIANCE CAMPBELL 0/3 COMPLIANCE ASSURANCE
 
UTCI 03/30/1998 04/01/1998 MINOR OUT-OF-COMPLIANCE COMPLIANCE ASSURANCE
 
 
 
Compliance Activity Information
 
Activity
Code
Date
Completed
Results Inspector AST/UST
Count
Description
Site Inspection 02/18/2025 Major Out of Compliance GARTIN_D 0/3 Routine Compliance
 
Electronic Communication 02/18/2025 Satisfied GARTIN_D Routine Compliance
 
Letter 02/07/2025 Satisfied GARTIN_D Component Closure
 
Document Management 02/04/2025 Satisfied GARTIN_D Component Closure
 
TCAR 02/04/2025 Satisfied GARTIN_D Component Closure
 
Letter 01/31/2025 Satisfied GARTIN_D Compliance Assistance
 
Record Document 01/15/2025 Satisfied GARTIN_D Compliance Assistance
 
Letter 12/11/2024 Satisfied GARTIN_D Compliance Assistance
 
Site Inspection 12/10/2024 Minor Out of Compliance GARTIN_D 0/3 Component Installation
 
Letter 06/02/2023 Satisfied WILSON_ML_1 Compliance Assistance
 
Record Document 05/31/2023 Satisfied KHAN_MR_1 Compliance Assistance
 
Phone Conversation 03/01/2023 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 03/01/2023 Major Out of Compliance KHAN_MR_1 0/3 Routine Compliance
 
Letter 03/01/2023 Satisfied WILSON_ML_1 Compliance Assistance
 
Electronic Communication 08/19/2021 Satisfied TESSIER_A Enforcement
 
Electronic Communication 08/19/2021 Satisfied TESSIER_A Enforcement
 
Enforcement Tracking 08/19/2021 Closed Without Enforcement TESSIER_A Enforcement
 
Electronic Communication 08/19/2021 Satisfied TESSIER_A Enforcement
 
Electronic Communication 08/19/2021 Satisfied TESSIER_A Enforcement
 
Electronic Communication 06/24/2021 Satisfied TESSIER_A Enforcement
 
Letter 06/17/2021 Satisfied TESSIER_A Enforcement
 
Enforcement Referral 06/02/2021 Accepted KHAN_MR_1 Enforcement
 
Issue Document 02/26/2021 Satisfied WILSON_ML_1 Compliance Assistance
 
Site Inspection 02/26/2021 Major Out of Compliance KHAN_MR_1 0/3 Routine Compliance
 
Letter 02/26/2021 Satisfied WILSON_ML_1 Compliance Assistance
 
Phone Conversation 02/26/2021 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 10/26/2018 In Compliance WILSON_ML_1 0/3 Complaint
 
Letter 03/02/2018 Satisfied WILSON_ML_1 Routine Compliance
 
Issue Document 03/02/2018 Satisfied WILSON_ML_1 Routine Compliance
 
Site Inspection 02/23/2018 In Compliance KHAN_MR_1 0/3 Routine Compliance
 
Phone Conversation 02/22/2018 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 01/12/2016 In Compliance KHAN_MR_1 0/3 Non-Compliance
 
Record Document 12/07/2015 Satisfied KHAN_MR_1 Non-Compliance
 
Letter 10/21/2015 Satisfied WILSON_ML_1 Non-Compliance
 
Site Inspection 10/20/2015 Minor Out of Compliance KHAN_MR_1 0/3 Routine Compliance
 
Phone Conversation 10/08/2015 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 11/06/2013 In Compliance KHAN_MR_1 0/3 Routine Compliance
 
Site Inspection 05/15/2012 In Compliance KHAN_MR_1 0/3 Non-Compliance
 
Site Inspection 03/06/2012 Minor Out of Compliance KHAN_MR_1 0/3 Routine Compliance
 
Site Inspection 08/26/2010 In Compliance KHAN_MR_1 0/3 Routine Compliance
 
Discharge Reporting 06/18/2010 Satisfied BRAZILE_DO_1 Discharge
 
Document Management 06/17/2010 Complete BRAZILE_DO_1 Discharge
 
Letter 06/16/2010 Satisfied BRAZILE_DO_1 Discharge
 
Record Document 05/20/2010 Satisfied KHAN_MR_1 Routine Compliance
 
Issue Document 04/13/2010 Satisfied BRISTOL_S Enforcement
 
Site Inspection 09/02/2009 In Compliance KHAN_MR_1 0/3 Routine Compliance
 
Enforcement Tracking 12/24/2008 Closed Without Enforcement BRISTOL_S Enforcement
 
Record Document 12/24/2008 Satisfied BRISTOL_S Enforcement
 
Site Inspection 09/24/2008 In Compliance BRAZILE_DO_1 0/3 Non-Compliance
 
Letter 09/04/2008 Satisfied KHAN_MR_1 Non-Compliance
 
Site Inspection 08/29/2008 Minor Out of Compliance KHAN_MR_1 0/3 Routine Compliance
 
Enforcement Referral 04/15/2008 Accepted BRISTOL_S Enforcement
 
Site Inspection 04/07/2008 In Compliance BRAZILE_DO_1 0/3 Discharge
 
Site Inspection 02/27/2008 In Compliance BRAZILE_DO_1 0/3 Installation
 
Site Inspection 01/10/2008 In Compliance BRAZILE_DO_1 0/3 Closure
 
Site Inspection 11/05/2007 In Compliance KHAN_MR_1 0/3 Non-Compliance
 
Record Document 10/24/2007 Satisfied KHAN_MR_1 Routine Compliance
 
Letter 09/11/2007 Satisfied KHAN_MR_1 Non-Compliance
 
Meeting 09/04/2007 Satisfied KHAN_MR_1 Routine Compliance
 
Site Inspection 09/04/2007 Minor Out of Compliance KHAN_MR_1 0/3 Routine Compliance
 
Site Inspection 10/13/2006 In Compliance KHAN_MR_1 0/3 Routine Compliance
 
Site Inspection 05/12/2006 In Compliance BRAZILE_DO_1 0/3 Routine Compliance
 
 
 
No Open AOCs Found
 
 
Open Violations
 
Insp Date Vio # Significance Violation Text Corrective Action
02/18/2025 6003 Minor 2.2 Registration Form not submitted for a new system, change in service, closure, owner change, or discovery of unregistered facility. Have the registration information for the double wall storage tanks of tank 7, tank 8, and tank 9 updated to properly list the primary construction as fiberglass clad steel instead of the currently registration of steel. Send the updated registration form to tankregistration@floridadep.gov and Daniel.Gartin@flhealth.gov.
 
02/18/2025 6063 SNC-B 4.1 Not repaired or isolated component or piping which has not caused a discharge or release. Have a certified contractor conduct the replacement of entry boots in the non-ethanol STP sump. Have a work notification form submitted prior to work being conducted on the boot's replacement. Once replacement has occurred, submit the hydrostatic testing of this STP sump to Daniel.Gartin@flhealth.gov.
 
 
 
Discharge Information
 
Discharge
Date
  Clean Up
Status
Score Eligibility Info Site Manager Phone
01/24/2008   COMPLETED 26
 
06/10/2002   COMPLETED 9
 
12/13/2000   COMPLETED 10