![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/09/2025 Last Data Refresh: 05/08/2025 Report Generated from DOPPLER | |||||||||||
District | Central | Type | Marine/Coastal Fuel Storage | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 8944989 | Latitude | 29° 4' 45.9254 | ||||||||
Name |
OCEAN SUPPORT INC 4950 S PENINSULA DR |
Longitude | 80° 55' 40.7436 | ||||||||
DAYTONA BEACH, FL 32127-7312 | LL Method | DPHO | |||||||||
Contact | JOHN HINTON | LL Status | REVIEWED | ||||||||
Phone | (386) 547-4019 | Status Date | 11/03/2003 | ||||||||
Account Owner Information | |||||||||||
Name | OCEAN SUPPORT INC 4950 S PENINSULA DR DAYTONA BEACH, FL 32127-7312 |
Effective Date | 10/02/1989 | ||||||||
Contact | JOHN T HINTON JR | ||||||||||
Phone | (386) 547-4019 | ||||||||||
DEERMEAT308@GMAIL.COM | |||||||||||
Placard # / Date | 646606 - 11/17/2022 | ||||||||||
Property Owner Information | |||||||||||
Name | OCEAN SUPPORT INC 4950 S PENINSULA DR DAYTONA BEACH, FL 32127-7312 |
Effective Date | 11/20/2021 | ||||||||
Contact | JOHN T HINTON JR | ||||||||||
Phone | (386) 547-4019 | ||||||||||
DEERMEAT308@GMAIL.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 3000 | Vehicular Diesel (D) | 04/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 3000 | Gasohol (C) | 04/01/1971 | UNDERGROUND | Removed from Site (B) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel | (B) Steel/galvanized metal | (8) Manually sampled wells | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 10000 | Vehicular Diesel (D) | 10/01/1990 | UNDERGROUND | Out of Service (T) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(F) Fiberglass clad steel (I) Double wall (M) Spill containment bucket (O) Tight fill |
(C) Fiberglass (F) Double wall (J) Pressurized piping system |
(2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (K) Monitor dbl wall pipe space |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 08/26/2022 | 08/26/2023 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||||||
INSURANCE | 08/26/2021 | 08/26/2022 | LIBERTY SURPLUS INSURANCE CORPORATION | ||||||||
INSURANCE | 08/16/2020 | 08/16/2021 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/16/2019 | 08/16/2020 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/16/2018 | 08/16/2019 | ACE AMERICAN INSURANCE COMPANY | ||||||||
INSURANCE | 08/16/2017 | 08/16/2018 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/16/2016 | 08/16/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/16/2015 | 08/16/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/16/2013 | 08/16/2014 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/16/2011 | 08/16/2012 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/16/2010 | 08/16/2011 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 07/16/2009 | 08/16/2010 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 08/16/2008 | 08/16/2009 | COMMERCE & INDUSTRY | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 02/20/2006 | 02/20/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes INFORMATION RECEIVED, DPRC ISSUED | |||||||||||
TCI | 12/20/2005 | 12/21/2005 | IN-COMPLIANCE | DJ | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes THE FACILITY IS IN COMPLIANCE W/ LATEST TCI HOWEVER THE DPRI INSPECTION IS NOT IN COMPLIANCE BECAUSE NO DCP IS AVAILABLE. | |||||||||||
DPRI | 12/20/2005 | 12/21/2005 | DJ | 0/1 | TERMINAL FACILITY PROJECT | ||||||
Completion Notes DCP WAS NOT AVAILABLE. OWNER WILL CONTRACT AFTER FIRST OF YEAR WITH THIRD PARTY CONTRACTOR FOR CLEANUP. | |||||||||||
RRBD | 06/27/2005 | 06/27/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes STORM WATER WAS REMOVED, REC'D 2 MOS OF LD MONITORING. PT JUST STARTED DOING THIS FOR THEM. VEEDED ROOT WAS REMOVED. METHOD OF LEAK DETECTION NOW IS MANUAL INTERSTITIAL OF TANK. | |||||||||||
CALL | 06/24/2005 | 06/27/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes POLLY CALLED. JERRY @ PETRO TECH SAID THIS WAS ALREADY SENT. HE WILL RESEND. | |||||||||||
CALL | 06/23/2005 | 06/27/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CALLED POLLY-OTHER 2 NC ITEMS HAVE BEEN DONE. HAVE PETRO TECH SEND PAPERWORK. | |||||||||||
RRBD | 06/14/2005 | 06/27/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D RESULTS OF LINE LEAK DETECTOR TEST. | |||||||||||
WLI | 05/31/2005 | 06/03/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO FURTHER RESPONSE. | |||||||||||
CALL | 04/15/2005 | 04/15/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes PETRO TECH WILL TAKE CARE OF N/C ON MON. | |||||||||||
NCLI | 04/11/2005 | 04/12/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO RESPONSE FROM FACILITY. | |||||||||||
DPRI | 12/13/2004 | 01/03/2005 | MINOR OUT-OF-COMPLIANCE | DJ | 0/1 | TERMINAL FACILITY PROJECT | |||||
Completion Notes LD REQUIRES ANNUAL TESTING. RD DEVICE REQUIRES ANNUALTESTING. DISPENSERS CONTAIN STORMWATER. | |||||||||||
TCI | 12/13/2004 | 01/03/2005 | MINOR OUT-OF-COMPLIANCE | DJ | 1/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes LD REQUIRES ANNUAL TESTING. RELEASE DET. DEVICE REQUIRES ANNUAL TESTING. ALL DISPENSERS CONTAIN STORMWATER. | |||||||||||
TCR | 03/08/2004 | 04/13/2004 | IN-COMPLIANCE | MOSER_T | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 12/16/2003 | 01/06/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | MOSER_T | 0/1 | COMPLIANCE ASSURANCE | |||||
DPRI | 12/16/2003 | 01/07/2004 | IN-COMPLIANCE | MOSER_T | 0/1 | TERMINAL FACILITY PROJECT | |||||
TCR | 02/06/2003 | 02/21/2003 | IN-COMPLIANCE | TM | 0/1 | COMPLIANCE ASSURANCE | |||||
Completion Notes FILL BOX HAS BEEN PROPERLY MARKED. PRODUCT HAS BEEN REMOVED FROM THE STP SUMP. | |||||||||||
TCI | 12/02/2002 | 12/17/2002 | MINOR OUT-OF-COMPLIANCE | MOSER_T | 0/1 | COMPLIANCE ASSURANCE | |||||
DPRI | 12/02/2002 | 12/12/2002 | IN-COMPLIANCE | MOSER_T | 0/1 | TERMINAL FACILITY PROJECT | |||||
DPRI | 12/14/2001 | 12/21/2001 | IN-COMPLIANCE | TERRY MOSER | 0/0 | TERMINAL FACILITY PROJECT | |||||
TCI | 08/08/2001 | 09/05/2001 | IN-COMPLIANCE | MOSER_T | 0/1 | COMPLIANCE ASSURANCE | |||||
LTR | 01/30/2001 | 02/01/2001 | COTTRELL_S | 0/0 | TERMINAL FACILITY PROJECT | ||||||
Completion Notes CERTIFICATE # 98651 | |||||||||||
DPRR | 01/30/2001 | 01/30/2001 | IN-COMPLIANCE | COTTRELL_S | 0/0 | TERMINAL FACILITY PROJECT | |||||
Completion Notes CERTIFICATE # | |||||||||||
NCLI | 12/28/2000 | 01/02/2001 | COTTRELL_S | 0/0 | TERMINAL FACILITY PROJECT | ||||||
Completion Notes CURRENT SPILL CONTRACT NOT AVAILABLE | |||||||||||
DPRI | 12/27/2000 | 12/28/2000 | COTTRELL_S | 0/0 | TERMINAL FACILITY PROJECT | ||||||
TCR | 08/10/2000 | 08/11/2000 | IN-COMPLIANCE | LLW | 0/1 | COMPLIANCE ASSURANCE | |||||
TCI | 08/03/2000 | 08/04/2000 | MINOR OUT-OF-COMPLIANCE | LLW | 0/1 | COMPLIANCE ASSURANCE | |||||
DPRI | 12/27/1999 | 01/11/2000 | COTTRELL_S | 0/0 | TERMINAL FACILITY PROJECT | ||||||
Completion Notes CERTIF. # 98614 | |||||||||||
TCI | 08/24/1999 | 08/30/1999 | IN-COMPLIANCE | VANDERBLEE_R | 0/1 | COMPLIANCE ASSURANCE | |||||
TIN | 04/21/1999 | 04/29/1999 | IN-COMPLIANCE | VANDERBLEE_R | 0/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Electronic Communication | 03/06/2025 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 02/28/2025 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Phone Conversation | 02/28/2025 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Enforcement Referral | 08/29/2024 | Accepted | RIVERA_JX_2 | Enforcement | |||||||
Electronic Communication | 11/08/2023 | Satisfied | KIDDER_MS_1 | Installation | |||||||
Phone Conversation | 08/03/2023 | Satisfied | KIDDER_MS_1 | Installation | |||||||
Phone Conversation | 07/17/2023 | Satisfied | KIDDER_MS_1 | Installation | |||||||
Electronic Communication | 07/14/2023 | Satisfied | BECKER_GT_1 | Closure | |||||||
Electronic Communication | 07/14/2023 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 07/14/2023 | Satisfied | BECKER_GT_1 | Installation | |||||||
Electronic Communication | 06/09/2023 | Satisfied | PIERCE_BN_1 | Component Closure | |||||||
Letter | 06/08/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 06/07/2023 | Satisfied | PIERCE_BN_1 | Component Closure | |||||||
Electronic Communication | 06/07/2023 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Electronic Communication | 06/07/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Document Management | 06/07/2023 | Satisfied | PIERCE_BN_1 | Closure | |||||||
Record Document | 06/07/2023 | Satisfied | PIERCE_BN_1 | Component Closure | |||||||
Site Inspection | 05/31/2023 | Minor Out of Compliance | PIERCE_BN_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 05/23/2023 | Satisfied | BECKER_GT_1 | Component Installation | |||||||
Electronic Communication | 09/21/2022 | Satisfied | BECKER_GT_1 | Compliance Assistance | |||||||
Letter | 07/14/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 01/14/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 01/14/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Phone Conversation | 01/12/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Phone Conversation | 01/11/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 01/10/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 11/09/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 08/16/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 03/04/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 09/15/2020 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 09/14/2020 | Minor Out of Compliance | PIERCE_BN_1 | 0/1 | Routine Compliance | ||||||
Electronic Communication | 09/11/2020 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Letter | 04/29/2018 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 04/29/2018 | In Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Meeting | 01/25/2017 | Satisfied | JOHNSON_CJ | Routine Compliance | |||||||
Meeting | 01/25/2017 | Satisfied | JOHNSON_CJ | Routine Compliance | |||||||
Site Inspection | 04/06/2016 | In Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/01/2013 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 09/01/2013 | In Compliance | PERRY_JF_2 | 0/1 | Routine Compliance | ||||||
Meeting | 08/26/2013 | Satisfied | JOHNSON_CJ | Routine Compliance | |||||||
Site Inspection | 03/29/2012 | In Compliance | JOHNSON_CJ | 0/1 | QA/QC | ||||||
Site Inspection | 03/29/2012 | In Compliance | CRAFT_TT_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 01/28/2011 | In Compliance | CRAFT_TT_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 01/26/2011 | In Compliance | JOHNSON_CJ | 0/1 | QA/QC | ||||||
Record Document | 12/03/2010 | Satisfied | STAFFORD_P_1 | Non-Compliance | |||||||
Letter | 11/18/2010 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 05/25/2010 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 04/08/2010 | Minor Out of Compliance | COIL_JM_1 | 0/1 | Routine Compliance | ||||||
Letter | 04/08/2010 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 04/06/2010 | In Compliance | JOHNSON_CJ | 0/1 | QA/QC | ||||||
Site Inspection | 02/05/2009 | In Compliance | JOHNSON_CJ | 0/1 | QA/QC | ||||||
Site Inspection | 01/23/2009 | In Compliance | COIL_JM_1 | 0/1 | Routine Compliance | ||||||
Site Inspection | 01/29/2008 | In Compliance | JOHNSON_CJ | 0/3 | QA/QC | ||||||
Record Document | 12/20/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 12/17/2007 | Minor Out of Compliance | SHIELDS_DJ | 0/1 | Routine Compliance | ||||||
Record Document | 05/10/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 05/10/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Phone Conversation | 04/04/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Record Document | 04/04/2007 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Letter | 01/29/2007 | Warning Letter Issued | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 12/11/2006 | Minor Out of Compliance | SHIELDS_DJ | 0/1 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/31/2023 | 6002 | Minor | 2.1 Operator Training records not available. | *If tank will be left in service: Please have applicable representatives complete operator A/B & C training. Please use the following link to access approved operator training for Florida: https://floridadep.gov/waste/permitting-compliance-assistance/content/underground-storage-tank-operator-training *If tank will be taken out of service: please complete all applicable out of service requirements to close this violation. | |||||||
05/31/2023 | 6062 | Minor | 2.5 Release detection devices not tested annually. | *If tank will be left in service: Please arrange for testing to be completed. Please supply testing for review. *If tank will be taken out of service: please complete all applicable out of service requirements to close this violation. | |||||||
05/31/2023 | 6072 | Minor | 2.7 Integrity testing of secondary containment systems and interstitial spaces not performed per schedule. | *If tank will be left in service: Please arrange for testing to be completed. Please supply testing for review. *If tank will be taken out of service: please complete all applicable out of service requirements to close this violation. | |||||||
05/31/2023 | 6053 | Minor | 4.7 Primary overfill protection not provided, registered, or tested as required. | *If tank will be left in service: Please arrange for testing to be completed. Please supply testing for review. *If tank will be taken out of service: please complete all applicable out of service requirements to close this violation. | |||||||
No Discharges Found |