![]() |
Florida Department of Environmental Protection Bob Martinez Center 2600 Blair Stone Road Tallahassee, Florida 32399-2400 |
Storage Tanks & Contamination Monitoring Information |
|||||||||
Cover Page Report | |||||||||||
Report Run Date: 05/22/2025 Last Data Refresh: 05/21/2025 Report Generated from DOPPLER | |||||||||||
District | Northwest | Type | Retail Station | ||||||||
County | Okaloosa | Status | OPEN | ||||||||
ID | 8945485 | Latitude | 30° 24' 28.495 | ||||||||
Name |
SUNSHINE FOOD MART #472 401 MIRACLE STRIP PKWY |
Longitude | 86° 38' 22.317 | ||||||||
FORT WALTON BEACH, FL 32548 | LL Method | DPHO | |||||||||
Contact | JOE FIELDS | LL Status | REVIEWED | ||||||||
Phone | (321) 631-0245 | Status Date | 11/25/2003 | ||||||||
Account Owner Information | |||||||||||
Name | T & M UNITED II LLC 402-A HIGH POINT DR #101 COCOA, FL 32926 |
Effective Date | 05/16/2019 | ||||||||
Contact | JOE FIELDS | ||||||||||
Phone | (321) 631-0245 | ||||||||||
JOE@SOUTHEASTPETRO.COM | |||||||||||
Placard # / Date | 685593 - 06/07/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | T & M UNITED II LLC 402-A HIGH POINT DR #101 COCOA, FL 32926 |
Effective Date | 05/16/2019 | ||||||||
Contact | JOE FIELDS | ||||||||||
Phone | (321) 631-0245 | ||||||||||
JOE@SOUTHEASTPETRO.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
5 | 10000 | Unleaded Gas (B) | 11/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
6 | 10000 | Unleaded Gas (B) | 11/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
7 | 10000 | Unleaded Gas (B) | 11/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (C) Steel (G) Sacrificial anode CP (I) Double wall (M) Spill containment bucket (O) Tight fill (P) Level gauges/alarms |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
8 | 10000 | Unleaded Gas (B) | 11/01/1989 | UNDERGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(A) Ball check valve (G) Sacrificial anode CP (I) Double wall (M) Spill containment bucket |
(C) Fiberglass (F) Double wall (J) Pressurized piping system (K) Dispenser liners |
(1) Continuous electronic sensing (2) Visual inspect pipe sumps (4) Visual inspect dispenser liners (F) Monitor dbl wall tank space (H) Mechanical line leak detector (K) Monitor dbl wall pipe space (L) Automatic tank gauging - USTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 888 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 888 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 888 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
4 | 888 | Unleaded Gas (B) | UNDERGROUND | Removed from Site (B) | |||||||
Constructions | Pipings | Monitorings | |||||||||
(D) Unknown | (Y) Unknown | (Y) Unknown | |||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/13/2024 | 05/13/2025 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/13/2022 | 05/13/2023 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/13/2021 | 05/13/2022 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 05/13/2020 | 05/13/2021 | ASPEN SPECIALTY INSURANCE COMPANY | ||||||||
INSURANCE | 03/31/2018 | 03/31/2019 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 03/31/2017 | 03/31/2018 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 03/31/2016 | 03/31/2017 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/31/2015 | 03/31/2016 | COMMERCE & INDUSTRY | ||||||||
INSURANCE | 03/31/2014 | 03/31/2015 | ILLINOIS UNION | ||||||||
INSURANCE | 03/31/2012 | 03/31/2013 | ILLINOIS UNION | ||||||||
INSURANCE | 03/31/2011 | 03/31/2012 | NAUTILUS INSURANCE COMPANY | ||||||||
INSURANCE | 11/11/2009 | 11/11/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 11/11/2008 | 11/11/2009 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
RRBD | 10/27/2005 | 10/28/2005 | COMPLIANCE ASSURANCE | ||||||||
TCI | 09/06/2005 | 09/09/2005 | MINOR OUT-OF-COMPLIANCE | JOSEPH D. THAYER | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 11/22/2004 | 11/24/2004 | COMPLIANCE ASSURANCE | ||||||||
TCI | 11/03/2004 | 11/09/2004 | MINOR OUT-OF-COMPLIANCE | J. SCOTT HALE | 0/4 | COMPLIANCE ASSURANCE | |||||
TXI | 05/05/2004 | 05/10/2004 | IN-COMPLIANCE | JOHN B. HOLLIGNSHEAD | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes ORIGINAL UPGRADE FOR NEW APT DISPENSER LINERS. OLD BRAVO BOXES FAILED. INF SENT TO DEPT FOR EQUIPMENT FAILURE. SECNDARY DW PIPE FAILED HYDRO. NEW PIPING SYSTEM INSTALLED. | |||||||||||
TIN | 05/05/2004 | 05/10/2004 | IN-COMPLIANCE | JOHN B. HOLLINGSHEAD | 0/4 | COMPLIANCE ASSURANCE | |||||
Completion Notes REPLACING 4-DISPENSER LINER WITH NEW SECONDARY CONTIANMENT. APT DISPENSER LINERS. NEW APT PIP DW/CHASE | |||||||||||
RRBD | 04/08/2004 | 04/09/2004 | COMPLIANCE ASSURANCE | ||||||||
TCR | 02/24/2004 | 03/01/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 0/4 | COMPLIANCE ASSURANCE | |||||
TCI | 10/28/2003 | 10/31/2003 | SIGNIFICANT OUT-OF-COMPLIANCE | JOHN S. STEVENSON | 0/4 | COMPLIANCE ASSURANCE | |||||
DSNR | 05/15/2002 | 06/27/2002 | JOHN B. HOLLINGSHEAD | 0/2 | DISCHARGE PROJECT | ||||||
Completion Notes CAR HIT DISPENSER NO FUEL LOSS | |||||||||||
TCI | 04/25/2002 | 05/20/2002 | IN-COMPLIANCE | V. PAUL HUTCHERSON | 0/4 | COMPLIANCE ASSURANCE | |||||
TIN | 04/01/2002 | 04/09/2002 | SIGNIFICANT OUT-OF-COMPLIANCE | V. PAUL HUTCHERSON | 0/4 | COMPLIANCE ASSURANCE | |||||
IRFR | 04/01/2002 | 04/09/2002 | V. PAUL HUTCHERSON | 0/1 | DISCHARGE PROJECT | ||||||
Completion Notes EQUIPMENT FAILURE | |||||||||||
RRBD | 02/07/2001 | 02/19/2001 | COMPLIANCE ASSURANCE | ||||||||
TCI | 01/11/2001 | 01/17/2001 | MINOR OUT-OF-COMPLIANCE | THAYER_JD | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 09/16/1999 | 10/11/1999 | THAYER_JD | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 08/04/1999 | 08/23/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | THAYER_JD | 0/4 | COMPLIANCE ASSURANCE | |||||
RRBD | 10/30/1998 | 03/31/1999 | THAYER_J | 0/0 | COMPLIANCE ASSURANCE | ||||||
UTCI | 08/12/1998 | 09/09/1998 | SIGNIFICANT OUT-OF-COMPLIANCE | COMPLIANCE ASSURANCE | |||||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Letter | 01/29/2025 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Electronic Communication | 01/28/2025 | Satisfied | MERRITT_S | Compliance Assistance | |||||||
Electronic Communication | 01/15/2025 | Satisfied | MERRITT_S | Compliance Assistance | |||||||
Letter | 11/07/2024 | Satisfied | ELLIOTT_EV_1 | Compliance Assistance | |||||||
Electronic Communication | 11/01/2024 | Satisfied | ELLIOTT_EV_1 | Routine Compliance | |||||||
Site Inspection | 10/31/2024 | Major Out of Compliance | ELLIOTT_EV_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 07/19/2024 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Letter | 12/29/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 11/28/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
TCAR | 11/28/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 11/18/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 11/18/2022 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 11/03/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 10/31/2022 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Record Document | 09/19/2022 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Record Document | 08/26/2022 | Satisfied | PAYNE_CL_1 | Compliance Assistance | |||||||
Record Document | 08/19/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 08/17/2022 | Minor Out of Compliance | WILSON_ML_1 | 0/4 | Component Installation | ||||||
Letter | 08/17/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 08/17/2022 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 08/16/2022 | Minor Out of Compliance | PAYNE_CL_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 08/11/2022 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Document Management | 05/06/2021 | Satisfied | MERRITT_S | Enforcement | |||||||
Enforcement Tracking | 05/06/2021 | Closed With Enforcement | MERRITT_S | Enforcement | |||||||
Document Management | 05/06/2021 | Satisfied | MERRITT_S | Enforcement | |||||||
TCAR | 03/23/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Letter | 03/23/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 03/23/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Record Document | 03/23/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 03/18/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Document Management | 03/18/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 03/18/2021 | Satisfied | WILSON_ML_1 | Component Closure | |||||||
Issue Document | 03/12/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 03/12/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Site Inspection | 03/11/2021 | Minor Out of Compliance | WILSON_ML_1 | 0/4 | Component Installation | ||||||
Electronic Communication | 02/22/2021 | Satisfied | DECKER_K | Enforcement | |||||||
Letter | 02/01/2021 | Satisfied | DECKER_K | Enforcement | |||||||
Enforcement Referral | 01/19/2021 | Accepted | WILSON_ML_1 | Enforcement | |||||||
Record Document | 01/18/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 01/12/2021 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Record Document | 11/16/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Letter | 10/20/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Issue Document | 10/20/2020 | Satisfied | WILSON_ML_1 | Compliance Assistance | |||||||
Electronic Communication | 10/19/2020 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Site Inspection | 10/19/2020 | Minor Out of Compliance | PAYNE_CL_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 07/12/2018 | In Compliance | PAYNE_CL_1 | 0/4 | Routine Compliance | ||||||
Electronic Communication | 07/11/2018 | Satisfied | PAYNE_CL_1 | Routine Compliance | |||||||
Record Document | 08/08/2016 | Satisfied | PAYNE_CL_1 | Non-Compliance | |||||||
Letter | 08/03/2016 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Letter | 06/14/2016 | Satisfied | MERRITT_S | Non-Compliance | |||||||
Site Inspection | 06/14/2016 | Minor Out of Compliance | PAYNE_CL_1 | 0/4 | Non-Compliance | ||||||
Letter | 04/22/2016 | Satisfied | WILSON_ML_1 | Non-Compliance | |||||||
Site Inspection | 04/21/2016 | Minor Out of Compliance | FOXWORTH_S_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 10/24/2014 | In Compliance | FOXWORTH_S_1 | 0/4 | Non-Compliance | ||||||
Site Inspection | 10/23/2014 | In Compliance | MERRITT_S | 0/4 | Enforcement | ||||||
Enforcement Tracking | 10/23/2014 | Closed Without Enforcement | MERRITT_S | Enforcement | |||||||
Enforcement Referral | 10/22/2014 | Accepted | MERRITT_S | Enforcement | |||||||
Letter | 04/09/2014 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Site Inspection | 04/08/2014 | Minor Out of Compliance | FOXWORTH_S_1 | 0/4 | Routine Compliance | ||||||
Record Document | 07/01/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Record Document | 06/05/2013 | Satisfied | KHAN_MR_1 | Non-Compliance | |||||||
Letter | 11/27/2012 | Satisfied | DAURIA_KL_1 | Non-Compliance | |||||||
Emergency Preparedness Information | 11/21/2012 | Satisfied | KHAN_MR_1 | Routine Compliance | |||||||
Site Inspection | 11/21/2012 | Minor Out of Compliance | KHAN_MR_1 | 0/4 | Routine Compliance | ||||||
Record Document | 09/20/2011 | Satisfied | BRAZILE_DO_1 | Non-Compliance | |||||||
Letter | 08/30/2011 | Satisfied | CLEMONS_AM_1 | Closure | |||||||
TCAR | 08/30/2011 | Satisfied | PURDY_EM_1 | Closure | |||||||
Letter | 08/29/2011 | Satisfied | CLEMONS_AM_1 | Non-Compliance | |||||||
Site Inspection | 08/27/2011 | Minor Out of Compliance | BRAZILE_DO_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/26/2011 | Satisfied | BRAZILE_DO_1 | Routine Compliance | |||||||
Incident | 03/04/2011 | Has not led to Discharge | TISSINGTON_AB_1 | Incident | |||||||
Site Inspection | 03/01/2011 | In Compliance | TISSINGTON_AB_1 | 0/4 | Closure | ||||||
Site Inspection | 03/01/2011 | In Compliance | TISSINGTON_AB_1 | 0/4 | Installation | ||||||
Site Inspection | 01/19/2011 | In Compliance | TISSINGTON_AB_1 | 0/4 | Non-Compliance | ||||||
Letter | 09/20/2010 | Satisfied | PIERCE_LL_1 | Non-Compliance | |||||||
Site Inspection | 08/27/2010 | Minor Out of Compliance | TISSINGTON_AB_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/26/2010 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 08/25/2010 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 08/31/2009 | In Compliance | TISSINGTON_AB_1 | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 08/31/2009 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Emergency Preparedness Information | 09/24/2008 | Satisfied | TISSINGTON_AB_1 | Routine Compliance | |||||||
Site Inspection | 09/23/2008 | In Compliance | TISSINGTON_AB_1 | 0/4 | Routine Compliance | ||||||
Site Inspection | 02/26/2008 | In Compliance | STEVENSON_JS | 0/4 | Routine Compliance | ||||||
Site Inspection | 07/16/2007 | In Compliance | STEVENSON_JS | 0/4 | Closure | ||||||
Site Inspection | 07/16/2007 | In Compliance | STEVENSON_JS | 0/4 | Installation | ||||||
Letter | 07/02/2007 | Satisfied | STEVENSON_JS | Non-Compliance | |||||||
TCAR | 04/25/2007 | Complete | THAYER_JD_1 | Closure | |||||||
Emergency Preparedness Information | 02/12/2007 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
Site Inspection | 12/29/2006 | Major Out of Compliance | STEVENSON_JS | 0/4 | Routine Compliance | ||||||
Emergency Preparedness Information | 09/29/2006 | Satisfied | STEVENSON_JS | Routine Compliance | |||||||
No Open AOCs Found | |||||||||||
No Open Violations Found | |||||||||||
Discharge Information | |||||||||||
Discharge Date |
Clean Up Status |
Score | Eligibility Info | Site Manager | Phone | ||||||
05/18/2004 | COMPLETED | ||||||||||
11/14/1991 | INACTIVE | 27 | PETROLEUM LIABILITY AND RESTORATION INSURANCE PROGRAM-ELIGIBLE | ||||||||
04/28/1988 | INACTIVE | 27 | EARLY DETECTION INCENTIVE-ELIGIBLE | DANIEL_CE_1 | |||||||