District | Central | Type | Fuel user/Non-retail | ||||||||
County | Volusia | Status | OPEN | ||||||||
ID | 9045774 | Latitude | 28° 54' 16.3263 | ||||||||
Name |
DEBARY GOLF & CNTRY CLUB 300 PLANTATION CLUB DR |
Longitude | 81° 18' 59.5712 | ||||||||
DEBARY, FL 32713 | LL Method | DGPS | |||||||||
Contact | DAN FLOOD | LL Status | REVIEWED | ||||||||
Phone | (386) 668-1705 | Status Date | 11/26/2003 | ||||||||
Account Owner Information | |||||||||||
Name | GOLF DEBARY LLC 300 PLANTATION CLUB DR DEBARY, FL 32713 |
Effective Date | 10/29/2021 | ||||||||
Contact | DAN FLOOD | ||||||||||
Phone | (386) 668-1705 | ||||||||||
DAN@DEBARYCC.COM | |||||||||||
Placard # / Date | 702030 - 10/08/2024 | ||||||||||
Property Owner Information | |||||||||||
Name | GOLF DEBARY LLC 300 PLANTATION CLUB DR DEBARY, FL 32713 |
Effective Date | 10/29/2021 | ||||||||
Contact | DAN FLOOD | ||||||||||
Phone | (386) 668-1705 | ||||||||||
DAN@DEBARYCC.COM | |||||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
1 | 2000 | Unleaded Gas (B) | 12/01/1989 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (N) Flow shut-Off |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(5) Electronic monitor dispenser liners (6) External piping monitoring (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
2 | 2000 | Vehicular Diesel (D) | 12/01/1989 | ABOVEGROUND | In Service (U) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(C) Steel (K) AST containment (N) Flow shut-Off |
(A) Abv, no soil contact (B) Steel/galvanized metal (I) Suction piping system |
(5) Electronic monitor dispenser liners (6) External piping monitoring (Q) Visual inspection of ASTs |
|||||||||
Tank | Tank Size | Content | Installed | Placement | Status | ||||||
3 | 2100 | Ammonia Compound (R) | 03/01/1990 | ABOVEGROUND | NonReg De-mimimus (Z) | ||||||
Constructions | Pipings | Monitorings | |||||||||
(E) Fiberglass (K) AST containment (O) Tight fill (Y) Polyethylene |
(A) Abv, no soil contact (I) Suction piping system (N) Approved synthetic material |
(6) External piping monitoring (Q) Visual inspection of ASTs |
|||||||||
Insurance Documents | |||||||||||
FR Type | Effective Date | Expiration Date | Company Name | ||||||||
INSURANCE | 05/01/2021 | 05/01/2022 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 05/01/2018 | 05/01/2019 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 05/01/2016 | 05/01/2017 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 05/01/2014 | 05/01/2015 | IRONSHORE SPECIALTY INSURANCE CO | ||||||||
INSURANCE | 05/01/2011 | 05/01/2012 | ILLINOIS UNION | ||||||||
INSURANCE | 05/01/2010 | 05/01/2011 | ZURICH-AMERICAN | ||||||||
INSURANCE | 05/01/2009 | 05/01/2010 | ZURICH-AMERICAN | ||||||||
Legacy Compliance Activity Information | |||||||||||
Activity Code |
Date Initiated |
Date Completed |
Results | Inspector | AST/UST Count |
Description | |||||
TCR | 02/09/2006 | 02/09/2006 | IN-COMPLIANCE | DJ | 3/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes REINSPECTION INDICATED THE SECONDARY CONTAINMENT AREA APPEARED TO BE PROPERLY SEALED. | |||||||||||
CWOE | 02/09/2006 | 02/09/2006 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NFA CONCERNING THE LATEST TCI. | |||||||||||
CALL | 02/06/2006 | 02/07/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes MIKE BELLINO STATED THAT THE SECONDARY CONTAINMENT AREA HAS BEEN SEALED AND THE FACILITY IS READY FOR A RE-INSPECT. | |||||||||||
CALL | 01/31/2006 | 02/01/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes FOLLOW UP ON PHONE CALL FROM 1/30/06. GAVE FACILITY UNTIL 2/14/06 TO RESOLVE VIOLATIONS. | |||||||||||
CALL | 01/30/2006 | 02/01/2006 | MML | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CALLED ABOUT WRL | |||||||||||
WLI | 01/27/2006 | 01/27/2006 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO FUTHER CONTACT FROM FACILITY. | |||||||||||
CALL | 09/22/2005 | 09/22/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes CALLED MIKE. WAITING FOR IT TO STOP RAINING SO CONTAINMENT AREA WILL DRY, BEFORE COATING BOTTOM OF C.A. | |||||||||||
RRBD | 09/14/2005 | 09/19/2005 | EJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes REC'D LETTER. THEY HAVE MATERIAL TO COAT CONTAINMENT AREA. WILL DO THIS WEEK OF 9-26. STAFF INSTRUCTED TO KEEP DRAIN VALVE CLOSED AT ALL TIMES. | |||||||||||
NCLI | 09/07/2005 | 09/07/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes NO FURTHER RESPONSE. | |||||||||||
RRBD | 07/08/2005 | 07/08/2005 | DJ | 0/0 | COMPLIANCE ASSURANCE | ||||||
Completion Notes RECEIVED FAX FROM FACILITY INDICATING THE OPERATOR HAS DISCUSSED THE REQUIREMENT TO KEEP THE DRAIN VALVE CLOSED EXCEPT WHEN REMOVING STORMWATER FROM CONTAINMENT AREA. | |||||||||||
TCI | 07/07/2005 | 07/08/2005 | SIGNIFICANT OUT-OF-COMPLIANCE | DJ | 2/0 | COMPLIANCE ASSURANCE | |||||
Completion Notes CONTAINMENT VALVE WAS OPEN. CONCRETE CONTAINMENT AREA REQUIRES SEALING. SIGNED OFF THE PREVIUOS NONCOMPLIANCE ISSUE #17 AND REPLACED W/ #2018. | |||||||||||
RRBD | 07/13/2004 | 07/15/2004 | COMPLIANCE ASSURANCE | ||||||||
TCI | 07/08/2004 | 07/12/2004 | SIGNIFICANT OUT-OF-COMPLIANCE | MOSER_T | 2/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/07/2003 | 07/09/2003 | IN-COMPLIANCE | SHIELDS_D | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/02/2002 | 07/02/2002 | IN-COMPLIANCE | DJ | 3/0 | COMPLIANCE ASSURANCE | |||||
TCI | 07/18/2001 | 07/24/2001 | IN-COMPLIANCE | MOSER_T | 3/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 07/25/2000 | 07/25/2000 | LLW | 3/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/10/2000 | 07/25/2000 | SIGNIFICANT OUT-OF-COMPLIANCE | LLW | 3/0 | COMPLIANCE ASSURANCE | |||||
RRBD | 08/11/1999 | 08/13/1999 | MOSER_T | 0/0 | COMPLIANCE ASSURANCE | ||||||
TCI | 07/29/1999 | 08/10/1999 | SIGNIFICANT OUT-OF-COMPLIANCE | MOSER_T | 3/0 | COMPLIANCE ASSURANCE | |||||
Compliance Activity Information | |||||||||||
Activity Code |
Date Completed |
Results | Inspector | AST/UST Count |
Description | ||||||
Document Management | 03/14/2025 | Satisfied | DEVICTORIA_F | Enforcement | |||||||
Phone Conversation | 09/05/2023 | Satisfied | GREGORY_JW_1 | Enforcement | |||||||
Enforcement Referral | 08/29/2023 | Accepted | GREGORY_JW_1 | Enforcement | |||||||
Electronic Communication | 08/23/2023 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Letter | 08/04/2023 | Satisfied | GREGORY_JW_1 | Compliance Assistance | |||||||
Electronic Communication | 07/15/2022 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Site Inspection | 05/27/2021 | Major Out of Compliance | PIERCE_BN_1 | 2/0 | Routine Compliance | ||||||
Letter | 05/27/2021 | Satisfied | PIERCE_BN_1 | Compliance Assistance | |||||||
Electronic Communication | 05/05/2021 | Satisfied | PIERCE_BN_1 | Routine Compliance | |||||||
Letter | 08/09/2018 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 08/09/2018 | In Compliance | PERRY_JF_2 | 2/0 | Routine Compliance | ||||||
Site Inspection | 06/09/2016 | In Compliance | COX_CD_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 06/27/2014 | In Compliance | PERRY_JF_2 | 2/0 | Non-Compliance | ||||||
Site Inspection | 06/22/2014 | Major Out of Compliance | PERRY_JF_2 | 2/0 | Routine Compliance | ||||||
Letter | 06/22/2014 | Satisfied | PERRY_JF_2 | Non-Compliance | |||||||
Emergency Preparedness Information | 06/09/2014 | Satisfied | PERRY_JF_2 | Routine Compliance | |||||||
Site Inspection | 12/01/2011 | In Compliance | CRAFT_TT_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 11/19/2010 | In Compliance | CRAFT_TT_1 | 2/0 | Routine Compliance | ||||||
Site Inspection | 07/17/2009 | In Compliance | CRAFT_TT_1 | 3/0 | Routine Compliance | ||||||
Site Inspection | 08/10/2007 | In Compliance | MOSER_T | 2/0 | Routine Compliance | ||||||
Letter | 08/08/2006 | Satisfied | LEIGH_MM_1 | Non-Compliance | |||||||
Site Inspection | 07/05/2006 | Minor Out of Compliance | MOSER_T | 2/0 | Routine Compliance | ||||||
No Open AOCs Found | |||||||||||
Open Violations | |||||||||||
Insp Date | Vio # | Significance | Violation Text | Corrective Action | |||||||
05/27/2021 | 5020 | SNC-B | 3.1 Failure to provide secondary containment consisting of appropriate materials for shop fabricated tank systems. | Please reseal the secondary containment with an approved petroleum-resistant epoxy. Please supply pictures following repairs made. | |||||||
05/27/2021 | 5127 | Minor | 3.17 Exterior Coatings not maintained to prevent corrosion for shop fabricated storage tank systems. | Please arrange for repairs to be made to the structural support of the tanks. All repairs should be made in accordance with tank manufacturer's specifications. Please supply pictures once complete. | |||||||
05/27/2021 | 5094 | SNC-B | 3.1 Release detection, including visual inspections not being conducted monthly (not to exceed 35 days) for shop fabricated tank systems. For electronically monitored sumps, visual inspections not conducted every 6 months. | Please immediately begin completing the monthly visual inspections. Please supply the next two months of inspections for review. | |||||||
No Discharges Found |